Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 5 of 5 for “"work crew"”

  1. Cue-based decision-making in construction work crews : an agent-based modeling approach

    "Construction work crews often deal with ambiguities (e.g., mismatch between provided directives and existing situations) at the work face about 'what-to do'. In such a circumstance, the work crew is forced to interpret cues present at the work face surroundings to make a decision. This research …

    msu

  2. Case studies of employee participation programs in construction and their effects on absenteeism

    … has shown a steady decline in productivity and worker morale, while experiencing an increase in absenteeism (Maloney, 1991; CII, 1982). This has had a tremendous economic and motivational impact. This dilemma coupled with the fast-paced growth of competition has led many construction companies …

    vt Repository record for Case studies of employee participation programs in construction and their effects on absenteeism (opens in a new tab)

  3. SENSITIVITY OF QUEUE ESTIMATES TO THE SIZE OF THE TIME INTERVAL USED TO AGGREGATE TRAFFIC VOLUME DATA

    … a lane of traffic. The lane closure affords the work crew space to work, as well as providing access to the work site and even providing a buffer between the work activities and the traffic. However, closing a lane can have an impact on the traffic flow and cause delays to the traveling public …

    ohiolink Repository record for SENSITIVITY OF QUEUE ESTIMATES TO THE SIZE OF THE TIME INTERVAL USED TO AGGREGATE TRAFFIC VOLUME DATA (opens in a new tab)

  4. Predikční AI model pro návrh betonářské čety

    Diplomová práce se zabývá návrhem pracovní čety pro realizaci betonových konstrukcí pomocí predikčního modelu. Je zaměřena na stanovení potřebného počtu betonářů na základě vybraných technologických, geometrických a organizačních parametrů stavby. Dále věnuje možnosti orientačního návrhu počtu …

    cz-tech Repository record for Predikční AI model pro návrh betonářské čety (opens in a new tab)

  5. Technologická etapa hrubé vrchní stavby bytového domu v komplexu Alessandria, Hradec Králové

    Předmětem této bakalářské práce je řešení stavebně technologického projektu výstavby bytového domu Alessandria, konkrétně provedení technologické etapy hrubé vrchní stavby. Konstrukční systém objektu tvoří kombinace zděných a monolitických železobetonových konstrukcí. Práce se zaměřuje na …

    brno-tech Repository record for Technologická etapa hrubé vrchní stavby bytového domu v komplexu Alessandria, Hradec Králové (opens in a new tab)