{"id":{"repo_id":"adelaide","oai_identifier":"oai:digital.library.adelaide.edu.au:11541.2/116000"},"canonical_url":"https://search.ndltd.org/etd/adelaide/oai:digital.library.adelaide.edu.au:11541.2/116000","repository":{"repo_id":"adelaide","name":"University of Adelaide","base_url":"https://digital.library.adelaide.edu.au/server/oai/request"},"display":{"title":"An analysis of the public tendering process for capital works","abstract":"The traditional competitive tendering system in the public sector has been used for many years, but it is open to criticism because in its traditional form, restrictive and inflexible and so inhibit innovation on the part of the contractor. Clearly owners are keen to take advantage of innovative opportunities, and equally contractors want to use their expertise to establish competitive advantage. However, modern case law has raised doubts about the ability of owners to seek alternative bids without placing themselves at risk of litigation. Generally, owners have been unconstrained in the manner in which they have assessed and awarded contracts. But recent common law decisions have questioned this practice and have established the owner’s duty of fairness to all bidders. This duty may be breached when the owner accepts an ‘alternative tender’ which does not conform to the conditions stated within the tender. The Tendering Codes of various States have been examined, and it is found that all encourage innovation or alternative proposals to achieve competitive advantage, efficiency and value for money. The Code used in West Australia is the one which best satisfies the decisions laid down by the courts in regard to the principle of fairness and the retention of the integrity of the tendering system. The findings from the interviews established that the public owners perceived innovations offered through tenders are more advantageous than price competition based on conforming tenders. It is supported that tendering innovation can be made possible through a clear description of criteria for alternative design and tender evaluation. Although both the literature and the interviews demonstrate that the ability of tenderers to propose innovative alternatives is very limited under the traditional system, eighty (80) percent of the interviewees considered that contractors should still be encouraged to provide innovative input. 70 percent of the interviewees disagreed with the statement that competitive tendering was designed to achieve better value for money. It is however recommended that if value-for-money tender is to be aimed at, alternative procurement methods like design and build and management contracts should be used.","abstract_html":"The traditional competitive tendering system in the public sector has been used for many years, but it is open to criticism because in its traditional form, restrictive and inflexible and so inhibit innovation on the part of the contractor. Clearly owners are keen to take advantage of innovative opportunities, and equally contractors want to use their expertise to establish competitive advantage. However, modern case law has raised doubts about the ability of owners to seek alternative bids without placing themselves at risk of litigation. Generally, owners have been unconstrained in the manner in which they have assessed and awarded contracts. But recent common law decisions have questioned this practice and have established the owner’s duty of fairness to all bidders. This duty may be breached when the owner accepts an ‘alternative tender’ which does not conform to the conditions stated within the tender. The Tendering Codes of various States have been examined, and it is found that all encourage innovation or alternative proposals to achieve competitive advantage, efficiency and value for money. The Code used in West Australia is the one which best satisfies the decisions laid down by the courts in regard to the principle of fairness and the retention of the integrity of the tendering system. The findings from the interviews established that the public owners perceived innovations offered through tenders are more advantageous than price competition based on conforming tenders. It is supported that tendering innovation can be made possible through a clear description of criteria for alternative design and tender evaluation. Although both the literature and the interviews demonstrate that the ability of tenderers to propose innovative alternatives is very limited under the traditional system, eighty (80) percent of the interviewees considered that contractors should still be encouraged to provide innovative input. 70 percent of the interviewees disagreed with the statement that competitive tendering was designed to achieve better value for money. It is however recommended that if value-for-money tender is to be aimed at, alternative procurement methods like design and build and management contracts should be used.","abstract_has_math":false,"creators":["Ma, Tony Yuen Fat,"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":"University of South Australia. School of Natural and Built Environments.","contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-11-19T13:56:46Z","subjects":["Construction industry","Public contracts"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/11541.2/116000","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/11541.2/116000","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aadelaide%3Aoai%3Adigital.library.adelaide.edu.au%3A11541.2%2F116000","prefix":"oai_dc"},"source_record":{"url":"https://digital.library.adelaide.edu.au/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adigital.library.adelaide.edu.au%3A11541.2%2F116000","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.school","label":"School","values":["University of South Australia. School of Natural and Built Environments.","School of Natural and Built Environments"]},{"key":"dc:creator","label":"Author","values":["Ma, Tony Yuen Fat,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:type","label":"Dc Type","values":["thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Construction industry","Public contracts"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/11541.2/116000"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["1 volume (various pagings) :","colour illustrations.","Includes bibliographical references."]},{"key":"dc:description.abstract","label":"Abstract","values":["The traditional competitive tendering system in the public sector has been used for many years, but it is open to criticism because in its traditional form, restrictive and inflexible and so inhibit innovation on the part of the contractor. Clearly owners are keen to take advantage of innovative opportunities, and equally contractors want to use their expertise to establish competitive advantage. However, modern case law has raised doubts about the ability of owners to seek alternative bids without placing themselves at risk of litigation. Generally, owners have been unconstrained in the manner in which they have assessed and awarded contracts. But recent common law decisions have questioned this practice and have established the owner’s duty of fairness to all bidders. This duty may be breached when the owner accepts an ‘alternative tender’ which does not conform to the conditions stated within the tender. The Tendering Codes of various States have been examined, and it is found that all encourage innovation or alternative proposals to achieve competitive advantage, efficiency and value for money. The Code used in West Australia is the one which best satisfies the decisions laid down by the courts in regard to the principle of fairness and the retention of the integrity of the tendering system. The findings from the interviews established that the public owners perceived innovations offered through tenders are more advantageous than price competition based on conforming tenders. It is supported that tendering innovation can be made possible through a clear description of criteria for alternative design and tender evaluation. Although both the literature and the interviews demonstrate that the ability of tenderers to propose innovative alternatives is very limited under the traditional system, eighty (80) percent of the interviewees considered that contractors should still be encouraged to provide innovative input. 70 percent of the interviewees disagreed with the statement that competitive tendering was designed to achieve better value for money. It is however recommended that if value-for-money tender is to be aimed at, alternative procurement methods like design and build and management contracts should be used."]},{"key":"dc:description.dissertation","label":"Dc Description Dissertation","values":["Thesis (PhD)--University of South Australia, 2008."]},{"key":"dc:description.provenance","label":"Dc Description Provenance","values":["Copyright 2008 Tony Yuen Fat Ma. This work is made available under the Creative Commons Attribution-NonCommercial-NoDerivs Australia 3.0 licence (http://creativecommons.org/licenses/by-nc-nd/3.0/au/)"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["506 0#$fstar $2Unrestricted online access"]},{"key":"dc:title","label":"Title","values":["An analysis of the public tendering process for capital works"]}]}],"canonical_facts":{"dc:contributor.school":["University of South Australia. School of Natural and Built Environments.","School of Natural and Built Environments"],"dc:creator":["Ma, Tony Yuen Fat,"],"dc:date.issued":["2008"],"dc:description":["1 volume (various pagings) :","colour illustrations.","Includes bibliographical references."],"dc:description.abstract":["The traditional competitive tendering system in the public sector has been used for many years, but it is open to criticism because in its traditional form, restrictive and inflexible and so inhibit innovation on the part of the contractor. Clearly owners are keen to take advantage of innovative opportunities, and equally contractors want to use their expertise to establish competitive advantage. However, modern case law has raised doubts about the ability of owners to seek alternative bids without placing themselves at risk of litigation. Generally, owners have been unconstrained in the manner in which they have assessed and awarded contracts. But recent common law decisions have questioned this practice and have established the owner’s duty of fairness to all bidders. This duty may be breached when the owner accepts an ‘alternative tender’ which does not conform to the conditions stated within the tender. The Tendering Codes of various States have been examined, and it is found that all encourage innovation or alternative proposals to achieve competitive advantage, efficiency and value for money. The Code used in West Australia is the one which best satisfies the decisions laid down by the courts in regard to the principle of fairness and the retention of the integrity of the tendering system. The findings from the interviews established that the public owners perceived innovations offered through tenders are more advantageous than price competition based on conforming tenders. It is supported that tendering innovation can be made possible through a clear description of criteria for alternative design and tender evaluation. Although both the literature and the interviews demonstrate that the ability of tenderers to propose innovative alternatives is very limited under the traditional system, eighty (80) percent of the interviewees considered that contractors should still be encouraged to provide innovative input. 70 percent of the interviewees disagreed with the statement that competitive tendering was designed to achieve better value for money. It is however recommended that if value-for-money tender is to be aimed at, alternative procurement methods like design and build and management contracts should be used."],"dc:description.dissertation":["Thesis (PhD)--University of South Australia, 2008."],"dc:description.provenance":["Copyright 2008 Tony Yuen Fat Ma. This work is made available under the Creative Commons Attribution-NonCommercial-NoDerivs Australia 3.0 licence (http://creativecommons.org/licenses/by-nc-nd/3.0/au/)"],"dc:identifier.uri":["https://hdl.handle.net/11541.2/116000"],"dc:language.iso":["en"],"dc:subject.lcsh":["Construction industry","Public contracts"],"dcterms:accessrights":["506 0#$fstar $2Unrestricted online access"],"dc:title":["An analysis of the public tendering process for capital works"],"dc:type":["thesis"]},"updated_at":"2026-11-19T13:56:46Z"}