{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/107364"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/107364","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Yield Improvement and Waste Reduction in Insulating Glass Unit Manufacturing: A Multi-Level Value Stream Mapping and Multi-Criteria Decision Framework","abstract":"The manufacturing of insulating glass units (IGUs) can be susceptible to material waste, scrap and rework because defects created during upstream manufacturing processes are often identified only at downstream inspection or after delivery. Therefore, the location of the detection recorded may not be the operation where the defect or waste mechanism was introduced. This thesis introduces and illustrates an integrated Lean decision framework that includes a reproducible operational baseline, multi-level value stream mapping (VSM), targeted Lean intervention design, multi-criteria decision analysis (MCDA), and future-state implementation planning to improve yield and reduce waste in IGU manufacturing. The framework is illustrated with a case study of a confidential Western Canadian IGU manufacturing facility that includes operational data from April 1 to July 31, 2025. The three waste channels are examined, including cutting waste (Type 1), post-assembly scrap (Type 2) and customer returns (Type 3). A total of 36,104 parent glass sheets were processed during the study period with an overall area-based yield of 77.6%. Low volume stock-keeping units (SKUs) comprised 7.40% of processed sheets but 27.60% of the Type 1 waste cost. Confidential facility records, direct observations and interviews with managers, supervisors and shop-floor personnel were used to develop current-state macro-, meso-, and micro-level VSMs. The maps and related origin versus detection diagnosis were reviewed with facility personnel iteratively to ensure that the maps accurately reflect actual operations. This diagnosis helps to identify where waste or defects are being documented and the operations where the underlying mechanisms might have been introduced. The results are converted to 13 specific Lean interventions. They are evaluated for their operational and financial potential based on cutting records, a sample of rejected IGUs, enterprise resource planning cost records and facility-supported process evidence. A design of experiments protocol is also designed for further empirical validation. The interventions are then ranked based on a weighted-sum MCDA under balanced, cost-focused, and impact-focused scenarios, filtered for operational guardrails (no throughput reduction and no increase in lead time), and added to future-state multi-level VSMs and a phased implementation roadmap. The thesis presents a repeatable and verifiable operational diagnosis to intervention prioritization process for fragile manufacturing systems with delayed defect detection. All savings reported are analytical projections and not actual results after implementation. The framework can be adapted to other manufacturing contexts by adjusting the data inputs, assumptions, and decision criteria.","abstract_html":"The manufacturing of insulating glass units (IGUs) can be susceptible to material waste, scrap and rework because defects created during upstream manufacturing processes are often identified only at downstream inspection or after delivery. Therefore, the location of the detection recorded may not be the operation where the defect or waste mechanism was introduced. This thesis introduces and illustrates an integrated Lean decision framework that includes a reproducible operational baseline, multi-level value stream mapping (VSM), targeted Lean intervention design, multi-criteria decision analysis (MCDA), and future-state implementation planning to improve yield and reduce waste in IGU manufacturing. The framework is illustrated with a case study of a confidential Western Canadian IGU manufacturing facility that includes operational data from April 1 to July 31, 2025. The three waste channels are examined, including cutting waste (Type 1), post-assembly scrap (Type 2) and customer returns (Type 3). A total of 36,104 parent glass sheets were processed during the study period with an overall area-based yield of 77.6%. Low volume stock-keeping units (SKUs) comprised 7.40% of processed sheets but 27.60% of the Type 1 waste cost. Confidential facility records, direct observations and interviews with managers, supervisors and shop-floor personnel were used to develop current-state macro-, meso-, and micro-level VSMs. The maps and related origin versus detection diagnosis were reviewed with facility personnel iteratively to ensure that the maps accurately reflect actual operations. This diagnosis helps to identify where waste or defects are being documented and the operations where the underlying mechanisms might have been introduced. The results are converted to 13 specific Lean interventions. They are evaluated for their operational and financial potential based on cutting records, a sample of rejected IGUs, enterprise resource planning cost records and facility-supported process evidence. A design of experiments protocol is also designed for further empirical validation. The interventions are then ranked based on a weighted-sum MCDA under balanced, cost-focused, and impact-focused scenarios, filtered for operational guardrails (no throughput reduction and no increase in lead time), and added to future-state multi-level VSMs and a phased implementation roadmap. The thesis presents a repeatable and verifiable operational diagnosis to intervention prioritization process for fragile manufacturing systems with delayed defect detection. All savings reported are analytical projections and not actual results after implementation. The framework can be adapted to other manufacturing contexts by adjusting the data inputs, assumptions, and decision criteria.","abstract_has_math":false,"creators":["Itani, Mohamad"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Al-Hussein, Mohamed (Civil and Environmental Engineering)","Abourizk, Simaan (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2026,"date_issued":"2026-11","date_published":"2026-11","updated_at":"2026-11-26T21:18:50Z","subjects":["Insulating Glass Unit Manufacturing","Waste Reduction","Yield Improvement","Value Stream Mapping","Multi-Criteria Decision Analysis","Lean Manufacturing"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/85870","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/85870","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F107364","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F107364","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Al-Hussein, Mohamed (Civil and Environmental Engineering)","Abourizk, Simaan (Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Itani, Mohamad"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-11-16T14:06:23Z"]},{"key":"dc:date.issued","label":"Date","values":["2026-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Insulating Glass Unit Manufacturing","Waste Reduction","Yield Improvement","Value Stream Mapping","Multi-Criteria Decision Analysis","Lean Manufacturing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/85870"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The manufacturing of insulating glass units (IGUs) can be susceptible to material waste, scrap and rework because defects created during upstream manufacturing processes are often identified only at downstream inspection or after delivery. Therefore, the location of the detection recorded may not be the operation where the defect or waste mechanism was introduced. This thesis introduces and illustrates an integrated Lean decision framework that includes a reproducible operational baseline, multi-level value stream mapping (VSM), targeted Lean intervention design, multi-criteria decision analysis (MCDA), and future-state implementation planning to improve yield and reduce waste in IGU manufacturing. The framework is illustrated with a case study of a confidential Western Canadian IGU manufacturing facility that includes operational data from April 1 to July 31, 2025. The three waste channels are examined, including cutting waste (Type 1), post-assembly scrap (Type 2) and customer returns (Type 3). A total of 36,104 parent glass sheets were processed during the study period with an overall area-based yield of 77.6%. Low volume stock-keeping units (SKUs) comprised 7.40% of processed sheets but 27.60% of the Type 1 waste cost. Confidential facility records, direct observations and interviews with managers, supervisors and shop-floor personnel were used to develop current-state macro-, meso-, and micro-level VSMs. The maps and related origin versus detection diagnosis were reviewed with facility personnel iteratively to ensure that the maps accurately reflect actual operations. This diagnosis helps to identify where waste or defects are being documented and the operations where the underlying mechanisms might have been introduced. The results are converted to 13 specific Lean interventions. They are evaluated for their operational and financial potential based on cutting records, a sample of rejected IGUs, enterprise resource planning cost records and facility-supported process evidence. A design of experiments protocol is also designed for further empirical validation. The interventions are then ranked based on a weighted-sum MCDA under balanced, cost-focused, and impact-focused scenarios, filtered for operational guardrails (no throughput reduction and no increase in lead time), and added to future-state multi-level VSMs and a phased implementation roadmap. The thesis presents a repeatable and verifiable operational diagnosis to intervention prioritization process for fragile manufacturing systems with delayed defect detection. All savings reported are analytical projections and not actual results after implementation. The framework can be adapted to other manufacturing contexts by adjusting the data inputs, assumptions, and decision criteria."]},{"key":"dc:title","label":"Title","values":["Yield Improvement and Waste Reduction in Insulating Glass Unit Manufacturing: A Multi-Level Value Stream Mapping and Multi-Criteria Decision Framework"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Al-Hussein, Mohamed (Civil and Environmental Engineering)","Abourizk, Simaan (Civil and Environmental Engineering)"],"dc:creator":["Itani, Mohamad"],"dc:date.accessioned":["2026-11-16T14:06:23Z"],"dc:date.issued":["2026-11"],"dc:description.abstract":["The manufacturing of insulating glass units (IGUs) can be susceptible to material waste, scrap and rework because defects created during upstream manufacturing processes are often identified only at downstream inspection or after delivery. Therefore, the location of the detection recorded may not be the operation where the defect or waste mechanism was introduced. This thesis introduces and illustrates an integrated Lean decision framework that includes a reproducible operational baseline, multi-level value stream mapping (VSM), targeted Lean intervention design, multi-criteria decision analysis (MCDA), and future-state implementation planning to improve yield and reduce waste in IGU manufacturing. The framework is illustrated with a case study of a confidential Western Canadian IGU manufacturing facility that includes operational data from April 1 to July 31, 2025. The three waste channels are examined, including cutting waste (Type 1), post-assembly scrap (Type 2) and customer returns (Type 3). A total of 36,104 parent glass sheets were processed during the study period with an overall area-based yield of 77.6%. Low volume stock-keeping units (SKUs) comprised 7.40% of processed sheets but 27.60% of the Type 1 waste cost. Confidential facility records, direct observations and interviews with managers, supervisors and shop-floor personnel were used to develop current-state macro-, meso-, and micro-level VSMs. The maps and related origin versus detection diagnosis were reviewed with facility personnel iteratively to ensure that the maps accurately reflect actual operations. This diagnosis helps to identify where waste or defects are being documented and the operations where the underlying mechanisms might have been introduced. The results are converted to 13 specific Lean interventions. They are evaluated for their operational and financial potential based on cutting records, a sample of rejected IGUs, enterprise resource planning cost records and facility-supported process evidence. A design of experiments protocol is also designed for further empirical validation. The interventions are then ranked based on a weighted-sum MCDA under balanced, cost-focused, and impact-focused scenarios, filtered for operational guardrails (no throughput reduction and no increase in lead time), and added to future-state multi-level VSMs and a phased implementation roadmap. The thesis presents a repeatable and verifiable operational diagnosis to intervention prioritization process for fragile manufacturing systems with delayed defect detection. All savings reported are analytical projections and not actual results after implementation. The framework can be adapted to other manufacturing contexts by adjusting the data inputs, assumptions, and decision criteria."],"dc:identifier.doi":["https://doi.org/10.7939/85870"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Insulating Glass Unit Manufacturing","Waste Reduction","Yield Improvement","Value Stream Mapping","Multi-Criteria Decision Analysis","Lean Manufacturing"],"dc:title":["Yield Improvement and Waste Reduction in Insulating Glass Unit Manufacturing: A Multi-Level Value Stream Mapping and Multi-Criteria Decision Framework"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:18:50Z"}