{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/59868"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/59868","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"BIM-Based Data Mining Approach to Estimating Job Man-Hour Requirements in Structural Steel Fabrication","abstract":"In a steel fabrication shop, jobs from different clients and projects are generally processed simultaneously in order to streamline production processes, improve resource utilization, and achieve cost-effectiveness in serving multiple concurrent steel-erection sites. Reliable quantity takeoff on each job and accurate estimation of shop fabrication man-hour requirements are crucial to plan and control fabrication operations and resource allocation on the shop floor. Building information modeling (BIM) is intended to integrate multifaceted characteristics of a building facility, but finds its application in structural steel fabrication largely limited to design and drafting. This research focuses on extending BIM’s usage further to the planning and control phases in steel fabrication. Using data extracted from BIM-based models, a linear regression model is developed to provide the man-hour requirement estimate for a particular job. Actual data collected from a steel fabrication company was used to train and validate the model. Two Excel macro-enabled workbooks were also developed to provide decision-making support in fabrication planning.","abstract_html":"In a steel fabrication shop, jobs from different clients and projects are generally processed simultaneously in order to streamline production processes, improve resource utilization, and achieve cost-effectiveness in serving multiple concurrent steel-erection sites. Reliable quantity takeoff on each job and accurate estimation of shop fabrication man-hour requirements are crucial to plan and control fabrication operations and resource allocation on the shop floor. Building information modeling (BIM) is intended to integrate multifaceted characteristics of a building facility, but finds its application in structural steel fabrication largely limited to design and drafting. This research focuses on extending BIM’s usage further to the planning and control phases in steel fabrication. Using data extracted from BIM-based models, a linear regression model is developed to provide the man-hour requirement estimate for a particular job. Actual data collected from a steel fabrication company was used to train and validate the model. Two Excel macro-enabled workbooks were also developed to provide decision-making support in fabrication planning.","abstract_has_math":false,"creators":["Hu, Xiaolin"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Lu, Ming (Civil & Environmental Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-06","date_published":"2015-06","updated_at":"2026-11-26T21:14:26Z","subjects":["Structural Steel Fabrication","BIM","Linear Regression","Quantity Takeoff"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3W669H4N","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3W669H4N","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F59868","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F59868","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lu, Ming (Civil & Environmental Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Lu, Ming (Civil & Environmental Engineering)","Al-Hussein, Mohamed (Civil & Environmental Engineering)","Davies, Evan (Civil & Environmental Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Hu, Xiaolin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-06T16:08:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-06T16:08:42Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Structural Steel Fabrication","BIM","Linear Regression","Quantity Takeoff"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3W669H4N"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In a steel fabrication shop, jobs from different clients and projects are generally processed simultaneously in order to streamline production processes, improve resource utilization, and achieve cost-effectiveness in serving multiple concurrent steel-erection sites. Reliable quantity takeoff on each job and accurate estimation of shop fabrication man-hour requirements are crucial to plan and control fabrication operations and resource allocation on the shop floor. Building information modeling (BIM) is intended to integrate multifaceted characteristics of a building facility, but finds its application in structural steel fabrication largely limited to design and drafting. This research focuses on extending BIM’s usage further to the planning and control phases in steel fabrication. Using data extracted from BIM-based models, a linear regression model is developed to provide the man-hour requirement estimate for a particular job. Actual data collected from a steel fabrication company was used to train and validate the model. Two Excel macro-enabled workbooks were also developed to provide decision-making support in fabrication planning."]},{"key":"dc:title","label":"Title","values":["BIM-Based Data Mining Approach to Estimating Job Man-Hour Requirements in Structural Steel Fabrication"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lu, Ming (Civil & Environmental Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)"],"dc:contributor.other":["Lu, Ming (Civil & Environmental Engineering)","Al-Hussein, Mohamed (Civil & Environmental Engineering)","Davies, Evan (Civil & Environmental Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)"],"dc:creator":["Hu, Xiaolin"],"dc:date.accessioned":["2025-05-06T16:08:42Z"],"dc:date.available":["2025-05-06T16:08:42Z"],"dc:date.issued":["2015-06"],"dc:description.abstract":["In a steel fabrication shop, jobs from different clients and projects are generally processed simultaneously in order to streamline production processes, improve resource utilization, and achieve cost-effectiveness in serving multiple concurrent steel-erection sites. Reliable quantity takeoff on each job and accurate estimation of shop fabrication man-hour requirements are crucial to plan and control fabrication operations and resource allocation on the shop floor. Building information modeling (BIM) is intended to integrate multifaceted characteristics of a building facility, but finds its application in structural steel fabrication largely limited to design and drafting. This research focuses on extending BIM’s usage further to the planning and control phases in steel fabrication. Using data extracted from BIM-based models, a linear regression model is developed to provide the man-hour requirement estimate for a particular job. Actual data collected from a steel fabrication company was used to train and validate the model. Two Excel macro-enabled workbooks were also developed to provide decision-making support in fabrication planning."],"dc:identifier.doi":["https://doi.org/10.7939/R3W669H4N"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Structural Steel Fabrication","BIM","Linear Regression","Quantity Takeoff"],"dc:title":["BIM-Based Data Mining Approach to Estimating Job Man-Hour Requirements in Structural Steel Fabrication"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:14:26Z"}