{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/60957"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/60957","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"A Framework for Design of Panelized Wood Framing Prefabrication Utilizing Multi-panels and Crew Balancing","abstract":"The construction industry is highly competitive and continually striving towards improving its performance in terms of time, cost, quality, and safety. Improved performance is essential to survival in today’s construction market. In this regard, measuring productivity can facilitate improved performance by establishing performance baselines, identifying problems, optimizing resources, creating dashboards and benchmarking, and evaluating improvement measures. Obtaining a framework for measuring productivity in construction confronts a problem within the complexity of the construction industry’s features and variability. The focus of this research is on establishing labour productivity modules for the fabrication stage of panels in panelized home buildings. Numerous techniques, such as lean concepts, last planner system, and line of balance are applied in order to assess production line performance in the machine assembly line, while a regression model is used to estimate productivity in the manual assembly line. Both modules are implemented and verified in a home building manufacturer in Edmonton in order to improve the overall performance of the assembly lines.","abstract_html":"The construction industry is highly competitive and continually striving towards improving its performance in terms of time, cost, quality, and safety. Improved performance is essential to survival in today’s construction market. In this regard, measuring productivity can facilitate improved performance by establishing performance baselines, identifying problems, optimizing resources, creating dashboards and benchmarking, and evaluating improvement measures. Obtaining a framework for measuring productivity in construction confronts a problem within the complexity of the construction industry’s features and variability. The focus of this research is on establishing labour productivity modules for the fabrication stage of panels in panelized home buildings. Numerous techniques, such as lean concepts, last planner system, and line of balance are applied in order to assess production line performance in the machine assembly line, while a regression model is used to estimate productivity in the manual assembly line. Both modules are implemented and verified in a home building manufacturer in Edmonton in order to improve the overall performance of the assembly lines.","abstract_has_math":false,"creators":["Ajweh,Ziad"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Gül, Mustafa (Civil and Environmental Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-06","date_published":"2014-06","updated_at":"2026-11-26T21:02:34Z","subjects":["Benchmarking","Manufacturing Management","Performance","Decision-making","Productivity","Profitability","Simulations","Panelized Construction","Multi-panels","Construction Management","Wood Framing","Production Line","Labour Balancing"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3C39Q","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3C39Q","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F60957","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F60957","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gül, Mustafa (Civil and Environmental Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Bouferguène, Ahmed (Campus Saint-Jean)","Han, SangUk (Civil and Environmental Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)","Gül, Mustafa (Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Ajweh,Ziad"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-06T16:57:43Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-06T16:57:43Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Benchmarking","Manufacturing Management","Performance","Decision-making","Productivity","Profitability","Simulations","Panelized Construction","Multi-panels","Construction Management","Wood Framing","Production Line","Labour Balancing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3C39Q"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The construction industry is highly competitive and continually striving towards improving its performance in terms of time, cost, quality, and safety. Improved performance is essential to survival in today’s construction market. In this regard, measuring productivity can facilitate improved performance by establishing performance baselines, identifying problems, optimizing resources, creating dashboards and benchmarking, and evaluating improvement measures. Obtaining a framework for measuring productivity in construction confronts a problem within the complexity of the construction industry’s features and variability. The focus of this research is on establishing labour productivity modules for the fabrication stage of panels in panelized home buildings. Numerous techniques, such as lean concepts, last planner system, and line of balance are applied in order to assess production line performance in the machine assembly line, while a regression model is used to estimate productivity in the manual assembly line. Both modules are implemented and verified in a home building manufacturer in Edmonton in order to improve the overall performance of the assembly lines."]},{"key":"dc:title","label":"Title","values":["A Framework for Design of Panelized Wood Framing Prefabrication Utilizing Multi-panels and Crew Balancing"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gül, Mustafa (Civil and Environmental Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)"],"dc:contributor.other":["Bouferguène, Ahmed (Campus Saint-Jean)","Han, SangUk (Civil and Environmental Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)","Gül, Mustafa (Civil and Environmental Engineering)"],"dc:creator":["Ajweh,Ziad"],"dc:date.accessioned":["2025-05-06T16:57:43Z"],"dc:date.available":["2025-05-06T16:57:43Z"],"dc:date.issued":["2014-06"],"dc:description.abstract":["The construction industry is highly competitive and continually striving towards improving its performance in terms of time, cost, quality, and safety. Improved performance is essential to survival in today’s construction market. In this regard, measuring productivity can facilitate improved performance by establishing performance baselines, identifying problems, optimizing resources, creating dashboards and benchmarking, and evaluating improvement measures. Obtaining a framework for measuring productivity in construction confronts a problem within the complexity of the construction industry’s features and variability. The focus of this research is on establishing labour productivity modules for the fabrication stage of panels in panelized home buildings. Numerous techniques, such as lean concepts, last planner system, and line of balance are applied in order to assess production line performance in the machine assembly line, while a regression model is used to estimate productivity in the manual assembly line. Both modules are implemented and verified in a home building manufacturer in Edmonton in order to improve the overall performance of the assembly lines."],"dc:identifier.doi":["https://doi.org/10.7939/R3C39Q"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Benchmarking","Manufacturing Management","Performance","Decision-making","Productivity","Profitability","Simulations","Panelized Construction","Multi-panels","Construction Management","Wood Framing","Production Line","Labour Balancing"],"dc:title":["A Framework for Design of Panelized Wood Framing Prefabrication Utilizing Multi-panels and Crew Balancing"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:02:34Z"}