{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/61667"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/61667","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Linkage of Truck-and-shovel Operations to Short-term Mine Plans Using Discrete Event Simulation","abstract":"The scope of this research is concerned with improving truck-and-shovel systems’ efficiency using simulation. The major shortcomings of the current simulation models reviewed in literature are: a) considering shovels as continuously working equipment, b) modeling the system based on a shovel’s production requirements, and c) considering only the total tonnage of material hauled with neither any measure of material quality nor a link to the mine production schedule. The objective of this study is to develop, implement, and verify a simulation model to analyze the behavior of a truck-and-shovel haulage system in open-pit mining in conjunction with short-term plans. The simulation model imitates the complex truck-and-shovel system, and considers the uncertainties associated with the operations of trucks and shovels. It guarantees that the operational plans will honor the optimum net present value obtained in the scheduling phase. The simulation model is verified by a case-study measuring key performance indicators of the truck-and-shovel haulage system.","abstract_html":"The scope of this research is concerned with improving truck-and-shovel systems’ efficiency using simulation. The major shortcomings of the current simulation models reviewed in literature are: a) considering shovels as continuously working equipment, b) modeling the system based on a shovel’s production requirements, and c) considering only the total tonnage of material hauled with neither any measure of material quality nor a link to the mine production schedule. The objective of this study is to develop, implement, and verify a simulation model to analyze the behavior of a truck-and-shovel haulage system in open-pit mining in conjunction with short-term plans. The simulation model imitates the complex truck-and-shovel system, and considers the uncertainties associated with the operations of trucks and shovels. It guarantees that the operational plans will honor the optimum net present value obtained in the scheduling phase. The simulation model is verified by a case-study measuring key performance indicators of the truck-and-shovel haulage system.","abstract_has_math":false,"creators":["Torkamani, Elmira"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Mining Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Askari Nasab, Hooman (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-06","date_published":"2013-06","updated_at":"2026-11-26T21:19:56Z","subjects":["Discrete event simulation","Short-term mine production schedule","Stochastic truck-and-shovel system"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R33K6X","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R33K6X","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F61667","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F61667","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Askari Nasab, Hooman (Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Szymanski, Jozef (Civil and Environmental Engineering)","Lu, Ming (Civil and Environmental Engineering)","Askari Nasab, Hooman (Civil and Environmental Engineering)","Mohamed, Yasser (Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Torkamani, Elmira"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-06T17:41:28Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-06T17:41:28Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Discrete event simulation","Short-term mine production schedule","Stochastic truck-and-shovel system"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R33K6X"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The scope of this research is concerned with improving truck-and-shovel systems’ efficiency using simulation. The major shortcomings of the current simulation models reviewed in literature are: a) considering shovels as continuously working equipment, b) modeling the system based on a shovel’s production requirements, and c) considering only the total tonnage of material hauled with neither any measure of material quality nor a link to the mine production schedule. The objective of this study is to develop, implement, and verify a simulation model to analyze the behavior of a truck-and-shovel haulage system in open-pit mining in conjunction with short-term plans. The simulation model imitates the complex truck-and-shovel system, and considers the uncertainties associated with the operations of trucks and shovels. It guarantees that the operational plans will honor the optimum net present value obtained in the scheduling phase. The simulation model is verified by a case-study measuring key performance indicators of the truck-and-shovel haulage system."]},{"key":"dc:title","label":"Title","values":["Linkage of Truck-and-shovel Operations to Short-term Mine Plans Using Discrete Event Simulation"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Askari Nasab, Hooman (Civil and Environmental Engineering)"],"dc:contributor.other":["Szymanski, Jozef (Civil and Environmental Engineering)","Lu, Ming (Civil and Environmental Engineering)","Askari Nasab, Hooman (Civil and Environmental Engineering)","Mohamed, Yasser (Civil and Environmental Engineering)"],"dc:creator":["Torkamani, Elmira"],"dc:date.accessioned":["2025-05-06T17:41:28Z"],"dc:date.available":["2025-05-06T17:41:28Z"],"dc:date.issued":["2013-06"],"dc:description.abstract":["The scope of this research is concerned with improving truck-and-shovel systems’ efficiency using simulation. The major shortcomings of the current simulation models reviewed in literature are: a) considering shovels as continuously working equipment, b) modeling the system based on a shovel’s production requirements, and c) considering only the total tonnage of material hauled with neither any measure of material quality nor a link to the mine production schedule. The objective of this study is to develop, implement, and verify a simulation model to analyze the behavior of a truck-and-shovel haulage system in open-pit mining in conjunction with short-term plans. The simulation model imitates the complex truck-and-shovel system, and considers the uncertainties associated with the operations of trucks and shovels. It guarantees that the operational plans will honor the optimum net present value obtained in the scheduling phase. The simulation model is verified by a case-study measuring key performance indicators of the truck-and-shovel haulage system."],"dc:identifier.doi":["https://doi.org/10.7939/R33K6X"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Discrete event simulation","Short-term mine production schedule","Stochastic truck-and-shovel system"],"dc:title":["Linkage of Truck-and-shovel Operations to Short-term Mine Plans Using Discrete Event Simulation"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:19:56Z"}