{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/62640"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/62640","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Intelligent Contractor Default Prediction Model for Surety Bonding in the Construction Industry","abstract":"Construction is a risk-filled, uncertain, and dynamic environment. Contractor default is a critical risk that can influence the outcome of projects in the construction industry. Construction project owners and other stakeholders look for methods to predict the potential of contractors to default, in order to avoid awarding contracts to high-risk contractors. One of the most effective tools for project owners to mitigate the risk of contractor failure is to transfer the risk of project completion to a surety company. The surety company conducts a comprehensive prequalification (underwriting) process to assess the possibility of contractor default. The prequalification process is done to evaluate any contractor, project, and contractual risks that may affect the contractor’s performance. The prequalification process involves evaluating various qualitative and quantitative evaluation criteria, many of which contain uncertainty and require subjective judgment. This thesis demonstrates how fuzzy logic and expert systems techniques are integrated to develop a model able to help surety professionals in contractor default prediction for a specific construction project for bonding purposes. Building the contractor default prediction model (CDPM) included identifying, classifying, and providing a comprehensive, detailed list of the evaluation criteria for contractor and project prequalification. Numerical scales were defined for the quantitative evaluation criteria, and rating scales, using reference variables, were developed to quantify the qualitative criteria. An important evaluation category, “contractor’s organizational practices,” was incorporated as input to the CDPM. The CDPM was built using the expertise of surety practitioners across Canada, and several different knowledge acquisition techniques were used. A novel methodology for finding a group consensus function that aggregates experts’ judgment scores to represent a common opinion was applied, in order to aggregate the experts’ inputs for the CDPM development. A methodology to apply two different optimization techniques, genetic algorithms and artificial neural network back-propagation, for the CDPM’s adaptation is presented. Finally, software for contractor default prediction, SuretyQualification, is developed.","abstract_html":"Construction is a risk-filled, uncertain, and dynamic environment. Contractor default is a critical risk that can influence the outcome of projects in the construction industry. Construction project owners and other stakeholders look for methods to predict the potential of contractors to default, in order to avoid awarding contracts to high-risk contractors. One of the most effective tools for project owners to mitigate the risk of contractor failure is to transfer the risk of project completion to a surety company. The surety company conducts a comprehensive prequalification (underwriting) process to assess the possibility of contractor default. The prequalification process is done to evaluate any contractor, project, and contractual risks that may affect the contractor’s performance. The prequalification process involves evaluating various qualitative and quantitative evaluation criteria, many of which contain uncertainty and require subjective judgment. This thesis demonstrates how fuzzy logic and expert systems techniques are integrated to develop a model able to help surety professionals in contractor default prediction for a specific construction project for bonding purposes. Building the contractor default prediction model (CDPM) included identifying, classifying, and providing a comprehensive, detailed list of the evaluation criteria for contractor and project prequalification. Numerical scales were defined for the quantitative evaluation criteria, and rating scales, using reference variables, were developed to quantify the qualitative criteria. An important evaluation category, “contractor’s organizational practices,” was incorporated as input to the CDPM. The CDPM was built using the expertise of surety practitioners across Canada, and several different knowledge acquisition techniques were used. A novel methodology for finding a group consensus function that aggregates experts’ judgment scores to represent a common opinion was applied, in order to aggregate the experts’ inputs for the CDPM development. A methodology to apply two different optimization techniques, genetic algorithms and artificial neural network back-propagation, for the CDPM’s adaptation is presented. Finally, software for contractor default prediction, SuretyQualification, is developed.","abstract_has_math":false,"creators":["Awad, Adel Ls"],"institution":"University of Alberta","degree_name":"Doctor of Philosophy","degree_level":"Doctoral","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Aminah Robinson Fayek (Department of Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-11","date_published":"2012-11","updated_at":"2026-11-26T21:59:05Z","subjects":["Prequalification","Surety Bonding","Fuzzy expert systems","Contractor Default","Fuzzy logic"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3PH07","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3PH07","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F62640","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F62640","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Aminah Robinson Fayek (Department of Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Aminah Robinson Fayek (Department of Civil and Environmental Engineering, University of Alberta)","Lloyd M. Waugh (Department of Civil Engineering, University of New Brunswick)","John Doucette (Department of Mechanical Engineering, University of Alberta)","Ming Lu (Department of Civil and Environmental Engineering, University of Alberta)","Petr Musilek (Department of Electrical and Computer Engineering, University of Alberta)"]},{"key":"dc:creator","label":"Author","values":["Awad, Adel Ls"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-06T18:57:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-06T18:57:25Z"]},{"key":"dc:date.issued","label":"Date","values":["2012-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Prequalification","Surety Bonding","Fuzzy expert systems","Contractor Default","Fuzzy logic"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3PH07"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Construction is a risk-filled, uncertain, and dynamic environment. Contractor default is a critical risk that can influence the outcome of projects in the construction industry. Construction project owners and other stakeholders look for methods to predict the potential of contractors to default, in order to avoid awarding contracts to high-risk contractors. One of the most effective tools for project owners to mitigate the risk of contractor failure is to transfer the risk of project completion to a surety company. The surety company conducts a comprehensive prequalification (underwriting) process to assess the possibility of contractor default. The prequalification process is done to evaluate any contractor, project, and contractual risks that may affect the contractor’s performance. The prequalification process involves evaluating various qualitative and quantitative evaluation criteria, many of which contain uncertainty and require subjective judgment. This thesis demonstrates how fuzzy logic and expert systems techniques are integrated to develop a model able to help surety professionals in contractor default prediction for a specific construction project for bonding purposes. Building the contractor default prediction model (CDPM) included identifying, classifying, and providing a comprehensive, detailed list of the evaluation criteria for contractor and project prequalification. Numerical scales were defined for the quantitative evaluation criteria, and rating scales, using reference variables, were developed to quantify the qualitative criteria. An important evaluation category, “contractor’s organizational practices,” was incorporated as input to the CDPM. The CDPM was built using the expertise of surety practitioners across Canada, and several different knowledge acquisition techniques were used. A novel methodology for finding a group consensus function that aggregates experts’ judgment scores to represent a common opinion was applied, in order to aggregate the experts’ inputs for the CDPM development. A methodology to apply two different optimization techniques, genetic algorithms and artificial neural network back-propagation, for the CDPM’s adaptation is presented. Finally, software for contractor default prediction, SuretyQualification, is developed."]},{"key":"dc:title","label":"Title","values":["Intelligent Contractor Default Prediction Model for Surety Bonding in the Construction Industry"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Aminah Robinson Fayek (Department of Civil and Environmental Engineering)"],"dc:contributor.other":["Aminah Robinson Fayek (Department of Civil and Environmental Engineering, University of Alberta)","Lloyd M. Waugh (Department of Civil Engineering, University of New Brunswick)","John Doucette (Department of Mechanical Engineering, University of Alberta)","Ming Lu (Department of Civil and Environmental Engineering, University of Alberta)","Petr Musilek (Department of Electrical and Computer Engineering, University of Alberta)"],"dc:creator":["Awad, Adel Ls"],"dc:date.accessioned":["2025-05-06T18:57:25Z"],"dc:date.available":["2025-05-06T18:57:25Z"],"dc:date.issued":["2012-11"],"dc:description.abstract":["Construction is a risk-filled, uncertain, and dynamic environment. Contractor default is a critical risk that can influence the outcome of projects in the construction industry. Construction project owners and other stakeholders look for methods to predict the potential of contractors to default, in order to avoid awarding contracts to high-risk contractors. One of the most effective tools for project owners to mitigate the risk of contractor failure is to transfer the risk of project completion to a surety company. The surety company conducts a comprehensive prequalification (underwriting) process to assess the possibility of contractor default. The prequalification process is done to evaluate any contractor, project, and contractual risks that may affect the contractor’s performance. The prequalification process involves evaluating various qualitative and quantitative evaluation criteria, many of which contain uncertainty and require subjective judgment. This thesis demonstrates how fuzzy logic and expert systems techniques are integrated to develop a model able to help surety professionals in contractor default prediction for a specific construction project for bonding purposes. Building the contractor default prediction model (CDPM) included identifying, classifying, and providing a comprehensive, detailed list of the evaluation criteria for contractor and project prequalification. Numerical scales were defined for the quantitative evaluation criteria, and rating scales, using reference variables, were developed to quantify the qualitative criteria. An important evaluation category, “contractor’s organizational practices,” was incorporated as input to the CDPM. The CDPM was built using the expertise of surety practitioners across Canada, and several different knowledge acquisition techniques were used. A novel methodology for finding a group consensus function that aggregates experts’ judgment scores to represent a common opinion was applied, in order to aggregate the experts’ inputs for the CDPM development. A methodology to apply two different optimization techniques, genetic algorithms and artificial neural network back-propagation, for the CDPM’s adaptation is presented. Finally, software for contractor default prediction, SuretyQualification, is developed."],"dc:identifier.doi":["https://doi.org/10.7939/R3PH07"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Prequalification","Surety Bonding","Fuzzy expert systems","Contractor Default","Fuzzy logic"],"dc:title":["Intelligent Contractor Default Prediction Model for Surety Bonding in the Construction Industry"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Doctoral"],"thesis:degree_name":["Doctor of Philosophy"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:59:05Z"}