{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/77656"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/77656","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Managing Tunnelling Construction Risks","abstract":"Construction projects are often faced with complex challenges; all of which lead to difficult decisions and possibly disputes regarding liability of the parties. This research investigates the risks associated with tunnelling construction and uses the information to create a simplified risk register. The risk register may be used as a reference guide of responsible and proactive project planning that reflects industry standards, lessons learned and the currency of understanding of the owners and contractors. Additionally, a checklist was created to simplify risk assessment during each phase of construction by identifying possible hazards for each critical task of the project. By openly acknowledging and discussing risks in the contract, the author believes that the tone of the project will be set towards mutually beneficial progress and co-operation and the lessons learned on each project will also be easier to recreate and utilize on future projects.","abstract_html":"Construction projects are often faced with complex challenges; all of which lead to difficult decisions and possibly disputes regarding liability of the parties. This research investigates the risks associated with tunnelling construction and uses the information to create a simplified risk register. The risk register may be used as a reference guide of responsible and proactive project planning that reflects industry standards, lessons learned and the currency of understanding of the owners and contractors. Additionally, a checklist was created to simplify risk assessment during each phase of construction by identifying possible hazards for each critical task of the project. By openly acknowledging and discussing risks in the contract, the author believes that the tone of the project will be set towards mutually beneficial progress and co-operation and the lessons learned on each project will also be easier to recreate and utilize on future projects.","abstract_has_math":false,"creators":["Giel-Tucker, Kimoya Lee"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["AbouRizk, Simaan (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-06","date_published":"2012-06","updated_at":"2026-11-26T21:11:59Z","subjects":["Construction risks","Tunnelling construction"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3N72X","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3N72X","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F77656","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F77656","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["AbouRizk, Simaan (Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Karapetrovic, Stanislav (Mechanical Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Giel-Tucker, Kimoya Lee"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-28T21:53:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-28T21:53:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2012-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction risks","Tunnelling construction"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3N72X"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Construction projects are often faced with complex challenges; all of which lead to difficult decisions and possibly disputes regarding liability of the parties. This research investigates the risks associated with tunnelling construction and uses the information to create a simplified risk register. The risk register may be used as a reference guide of responsible and proactive project planning that reflects industry standards, lessons learned and the currency of understanding of the owners and contractors. Additionally, a checklist was created to simplify risk assessment during each phase of construction by identifying possible hazards for each critical task of the project. By openly acknowledging and discussing risks in the contract, the author believes that the tone of the project will be set towards mutually beneficial progress and co-operation and the lessons learned on each project will also be easier to recreate and utilize on future projects."]},{"key":"dc:title","label":"Title","values":["Managing Tunnelling Construction Risks"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["AbouRizk, Simaan (Civil and Environmental Engineering)"],"dc:contributor.other":["Karapetrovic, Stanislav (Mechanical Engineering)","Al-Hussein, Mohamed (Civil and Environmental Engineering)"],"dc:creator":["Giel-Tucker, Kimoya Lee"],"dc:date.accessioned":["2025-05-28T21:53:05Z"],"dc:date.available":["2025-05-28T21:53:05Z"],"dc:date.issued":["2012-06"],"dc:description.abstract":["Construction projects are often faced with complex challenges; all of which lead to difficult decisions and possibly disputes regarding liability of the parties. This research investigates the risks associated with tunnelling construction and uses the information to create a simplified risk register. The risk register may be used as a reference guide of responsible and proactive project planning that reflects industry standards, lessons learned and the currency of understanding of the owners and contractors. Additionally, a checklist was created to simplify risk assessment during each phase of construction by identifying possible hazards for each critical task of the project. By openly acknowledging and discussing risks in the contract, the author believes that the tone of the project will be set towards mutually beneficial progress and co-operation and the lessons learned on each project will also be easier to recreate and utilize on future projects."],"dc:identifier.doi":["https://doi.org/10.7939/R3N72X"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Construction risks","Tunnelling construction"],"dc:title":["Managing Tunnelling Construction Risks"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:11:59Z"}