{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/77899"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/77899","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"A Framework for Process–Waste Mitigation in Off-site Construction during the Design Phase","abstract":"Despite accounting for a tiny percentage of total construction expenses, a wasteful design process is more likely to cause delays or errors, resulting in low productivity, budget overrun, undesirable outputs and wasting resources. This study aims to examine the design process through Lean principles to identify non-value-added activities or resources, evaluate different methods and propose solutions to eliminate or mitigate them. Value stream mapping is used in addition to statistical analysis to map the process to identify the challenges and waste areas. A framework is developed to help evaluate processes and increase efficiency during the design phases in offsite construction and built-to-order companies, thereby reducing the cost and duration of the project. Moreover, simulation is used to assess the recommended interventions. The simulation shows the estimated improvements resulting from implementing the suggested interventions, as an expected improvement of 47.3% reduction in design lead time with a utilization ratio of 13.7%. The framework is generic and applicable to all construction industry aspects. The innovation of this framework resides in the precise procedures and direction offered to improve these phases utilizing Lean tools.","abstract_html":"Despite accounting for a tiny percentage of total construction expenses, a wasteful design process is more likely to cause delays or errors, resulting in low productivity, budget overrun, undesirable outputs and wasting resources. This study aims to examine the design process through Lean principles to identify non-value-added activities or resources, evaluate different methods and propose solutions to eliminate or mitigate them. Value stream mapping is used in addition to statistical analysis to map the process to identify the challenges and waste areas. A framework is developed to help evaluate processes and increase efficiency during the design phases in offsite construction and built-to-order companies, thereby reducing the cost and duration of the project. Moreover, simulation is used to assess the recommended interventions. The simulation shows the estimated improvements resulting from implementing the suggested interventions, as an expected improvement of 47.3% reduction in design lead time with a utilization ratio of 13.7%. The framework is generic and applicable to all construction industry aspects. The innovation of this framework resides in the precise procedures and direction offered to improve these phases utilizing Lean tools.","abstract_has_math":false,"creators":["Gholinezhad Dazmiri, Danial"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Hamzeh, Farook(Civil and environmental)"],"committee_chairs":[],"committee_members":[],"year":2023,"date_issued":"2023-06","date_published":"2023-06","updated_at":"2026-11-26T21:52:52Z","subjects":["Lean","Design","Off-site Construction","Waste"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/r3-apd7-aw32","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/r3-apd7-aw32","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F77899","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F77899","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hamzeh, Farook(Civil and environmental)"]},{"key":"dc:creator","label":"Author","values":["Gholinezhad Dazmiri, Danial"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-28T21:57:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-28T21:57:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2023-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Lean","Design","Off-site Construction","Waste"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/r3-apd7-aw32"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Despite accounting for a tiny percentage of total construction expenses, a wasteful design process is more likely to cause delays or errors, resulting in low productivity, budget overrun, undesirable outputs and wasting resources. This study aims to examine the design process through Lean principles to identify non-value-added activities or resources, evaluate different methods and propose solutions to eliminate or mitigate them. Value stream mapping is used in addition to statistical analysis to map the process to identify the challenges and waste areas. A framework is developed to help evaluate processes and increase efficiency during the design phases in offsite construction and built-to-order companies, thereby reducing the cost and duration of the project. Moreover, simulation is used to assess the recommended interventions. The simulation shows the estimated improvements resulting from implementing the suggested interventions, as an expected improvement of 47.3% reduction in design lead time with a utilization ratio of 13.7%. The framework is generic and applicable to all construction industry aspects. The innovation of this framework resides in the precise procedures and direction offered to improve these phases utilizing Lean tools."]},{"key":"dc:title","label":"Title","values":["A Framework for Process–Waste Mitigation in Off-site Construction during the Design Phase"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hamzeh, Farook(Civil and environmental)"],"dc:creator":["Gholinezhad Dazmiri, Danial"],"dc:date.accessioned":["2025-05-28T21:57:49Z"],"dc:date.available":["2025-05-28T21:57:49Z"],"dc:date.issued":["2023-06"],"dc:description.abstract":["Despite accounting for a tiny percentage of total construction expenses, a wasteful design process is more likely to cause delays or errors, resulting in low productivity, budget overrun, undesirable outputs and wasting resources. This study aims to examine the design process through Lean principles to identify non-value-added activities or resources, evaluate different methods and propose solutions to eliminate or mitigate them. Value stream mapping is used in addition to statistical analysis to map the process to identify the challenges and waste areas. A framework is developed to help evaluate processes and increase efficiency during the design phases in offsite construction and built-to-order companies, thereby reducing the cost and duration of the project. Moreover, simulation is used to assess the recommended interventions. The simulation shows the estimated improvements resulting from implementing the suggested interventions, as an expected improvement of 47.3% reduction in design lead time with a utilization ratio of 13.7%. The framework is generic and applicable to all construction industry aspects. The innovation of this framework resides in the precise procedures and direction offered to improve these phases utilizing Lean tools."],"dc:identifier.doi":["https://doi.org/10.7939/r3-apd7-aw32"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Lean","Design","Off-site Construction","Waste"],"dc:title":["A Framework for Process–Waste Mitigation in Off-site Construction during the Design Phase"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:52:52Z"}