{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/78200"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/78200","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Estimation and Planning Methodology for Industrial Construction Scaffolding","abstract":"Scaffolds are temporary structures that are built to support workers and materials and facilitate direct work on construction sites. A considerable amount of man power resources are consumed by industrial construction scaffolding, which makes effective planning and estimation of the same very critical to the project. The present research attempts to analyze affecting factors for different stages of estimation and concepts in advance planning of industrial scaffolding, and presents useful observations and recommendations. A simulation tool for predicting scaffold erection man-hour values for individual equipment on site in an industrial project was developed in Simphony 4.0 and is based on mapping the geometry of equipment and other factors to man-hours of scaffold work. The stages and methods of estimation, their uses and an efficient scaffold flow process for industrial construction lays a solid foundation of new concepts and analysis in industrial scaffolding research work.","abstract_html":"Scaffolds are temporary structures that are built to support workers and materials and facilitate direct work on construction sites. A considerable amount of man power resources are consumed by industrial construction scaffolding, which makes effective planning and estimation of the same very critical to the project. The present research attempts to analyze affecting factors for different stages of estimation and concepts in advance planning of industrial scaffolding, and presents useful observations and recommendations. A simulation tool for predicting scaffold erection man-hour values for individual equipment on site in an industrial project was developed in Simphony 4.0 and is based on mapping the geometry of equipment and other factors to man-hours of scaffold work. The stages and methods of estimation, their uses and an efficient scaffold flow process for industrial construction lays a solid foundation of new concepts and analysis in industrial scaffolding research work.","abstract_has_math":false,"creators":["Kumar,Chandan"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["AbouRizk, Simaan (Civil & Environmental Engineering)","Mohamed, Yasser (Civil & Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-11","date_published":"2013-11","updated_at":"2026-11-26T20:51:01Z","subjects":["Planning","Estimate Scaffold","Industrial Scaffold"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3SB3X67T","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3SB3X67T","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F78200","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F78200","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["AbouRizk, Simaan (Civil & Environmental Engineering)","Mohamed, Yasser (Civil & Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Qiu ,Zhi-Jun ( Civil and Environmental Engineering)","Kumar, Amit ( Mechanical Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)","Mohamed, Yasser (Civil & Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Kumar,Chandan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-28T22:05:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-28T22:05:04Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Planning","Estimate Scaffold","Industrial Scaffold"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3SB3X67T"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Scaffolds are temporary structures that are built to support workers and materials and facilitate direct work on construction sites. A considerable amount of man power resources are consumed by industrial construction scaffolding, which makes effective planning and estimation of the same very critical to the project. The present research attempts to analyze affecting factors for different stages of estimation and concepts in advance planning of industrial scaffolding, and presents useful observations and recommendations. A simulation tool for predicting scaffold erection man-hour values for individual equipment on site in an industrial project was developed in Simphony 4.0 and is based on mapping the geometry of equipment and other factors to man-hours of scaffold work. The stages and methods of estimation, their uses and an efficient scaffold flow process for industrial construction lays a solid foundation of new concepts and analysis in industrial scaffolding research work."]},{"key":"dc:title","label":"Title","values":["Estimation and Planning Methodology for Industrial Construction Scaffolding"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["AbouRizk, Simaan (Civil & Environmental Engineering)","Mohamed, Yasser (Civil & Environmental Engineering)"],"dc:contributor.other":["Qiu ,Zhi-Jun ( Civil and Environmental Engineering)","Kumar, Amit ( Mechanical Engineering)","AbouRizk, Simaan (Civil & Environmental Engineering)","Mohamed, Yasser (Civil & Environmental Engineering)"],"dc:creator":["Kumar,Chandan"],"dc:date.accessioned":["2025-05-28T22:05:04Z"],"dc:date.available":["2025-05-28T22:05:04Z"],"dc:date.issued":["2013-11"],"dc:description.abstract":["Scaffolds are temporary structures that are built to support workers and materials and facilitate direct work on construction sites. A considerable amount of man power resources are consumed by industrial construction scaffolding, which makes effective planning and estimation of the same very critical to the project. The present research attempts to analyze affecting factors for different stages of estimation and concepts in advance planning of industrial scaffolding, and presents useful observations and recommendations. A simulation tool for predicting scaffold erection man-hour values for individual equipment on site in an industrial project was developed in Simphony 4.0 and is based on mapping the geometry of equipment and other factors to man-hours of scaffold work. The stages and methods of estimation, their uses and an efficient scaffold flow process for industrial construction lays a solid foundation of new concepts and analysis in industrial scaffolding research work."],"dc:identifier.doi":["https://doi.org/10.7939/R3SB3X67T"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Planning","Estimate Scaffold","Industrial Scaffold"],"dc:title":["Estimation and Planning Methodology for Industrial Construction Scaffolding"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T20:51:01Z"}