{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/79839"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/79839","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Digital image processing based semi-automatic data acquisition system for ongoing construction progress assessment","abstract":null,"abstract_html":null,"abstract_has_math":false,"creators":["Wu, Yuhong"],"institution":"University of Alberta","degree_name":"Master of Science in Construction Engineering and Management","degree_level":"Master's","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005","date_published":"2005","updated_at":"2026-11-26T21:56:12Z","subjects":["Construction industry. Technological innovations.","Image processing.","Construction industry. Management. Data processing."],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/r3-zdcy-k319","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/r3-zdcy-k319","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F79839","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F79839","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Wu, Yuhong"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-28T23:10:24Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-28T23:10:24Z"]},{"key":"dc:date.issued","label":"Date","values":["2005"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Construction Engineering and Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction industry. Technological innovations.","Image processing.","Construction industry. Management. Data processing."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/r3-zdcy-k319"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:title","label":"Title","values":["Digital image processing based semi-automatic data acquisition system for ongoing construction progress assessment"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Wu, Yuhong"],"dc:date.accessioned":["2025-05-28T23:10:24Z"],"dc:date.available":["2025-05-28T23:10:24Z"],"dc:date.issued":["2005"],"dc:identifier.doi":["https://doi.org/10.7939/r3-zdcy-k319"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Construction industry. Technological innovations.","Image processing.","Construction industry. Management. Data processing."],"dc:title":["Digital image processing based semi-automatic data acquisition system for ongoing construction progress assessment"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science in Construction Engineering and Management"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:56:12Z"}