{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/83042"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/83042","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Automated and risk-based Box Jenkins forecasting model for infrastructure system capital planning (ISCP)","abstract":null,"abstract_html":null,"abstract_has_math":false,"creators":["Lu, Yong"],"institution":"University of Alberta","degree_name":"Master of Science in construction engineering and management","degree_level":"Master's","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2004,"date_issued":"2004-11","date_published":"2004-11","updated_at":"2026-11-26T20:56:18Z","subjects":["Box-Jenkins forecasting.","Infrastructure (Economics). Planning. Mathematical models.","Risk assessment. Mathematical models.","Uncertainty. Mathematical models."],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/r3-j3pb-6534","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/r3-j3pb-6534","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F83042","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F83042","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Lu, Yong"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T01:36:44Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T01:36:44Z"]},{"key":"dc:date.issued","label":"Date","values":["2004-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in construction engineering and management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Box-Jenkins forecasting.","Infrastructure (Economics). Planning. Mathematical models.","Risk assessment. Mathematical models.","Uncertainty. Mathematical models."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/r3-j3pb-6534"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:title","label":"Title","values":["Automated and risk-based Box Jenkins forecasting model for infrastructure system capital planning (ISCP)"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Lu, Yong"],"dc:date.accessioned":["2025-05-29T01:36:44Z"],"dc:date.available":["2025-05-29T01:36:44Z"],"dc:date.issued":["2004-11"],"dc:identifier.doi":["https://doi.org/10.7939/r3-j3pb-6534"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Box-Jenkins forecasting.","Infrastructure (Economics). Planning. Mathematical models.","Risk assessment. Mathematical models.","Uncertainty. Mathematical models."],"dc:title":["Automated and risk-based Box Jenkins forecasting model for infrastructure system capital planning (ISCP)"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science in construction engineering and management"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T20:56:18Z"}