{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/87413"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/87413","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Linkage of Annual Oil Sands Mine Plan to Composite Tailings Plan","abstract":"One of the major issues in the current oil sands waste management techniques is a lack of a direct linkage between the long-term mine plans and the quantity of the tailings produced downstream. This research is focused on developing a linkage between oil sands long-term mine plans and the final composite tailings (CT) produced to assist the oil sands production process to be in compliance with the regulations set by Directive 074. A series of mass-balance relations between the ore tonnage and the final CT tonnage were developed. This was followed by the development of a code to employ the mass-balance relations in reporting the CT production schedule using the long-term mine plan. To capture the uncertainties associated with the CT production process, a stochastic simulation model was developed. Finally, sensitivity analysis was carried out to capture the sensitivity of the CT tonnages produced to the fluctuations of the input variables.","abstract_html":"One of the major issues in the current oil sands waste management techniques is a lack of a direct linkage between the long-term mine plans and the quantity of the tailings produced downstream. This research is focused on developing a linkage between oil sands long-term mine plans and the final composite tailings (CT) produced to assist the oil sands production process to be in compliance with the regulations set by Directive 074. A series of mass-balance relations between the ore tonnage and the final CT tonnage were developed. This was followed by the development of a code to employ the mass-balance relations in reporting the CT production schedule using the long-term mine plan. To capture the uncertainties associated with the CT production process, a stochastic simulation model was developed. Finally, sensitivity analysis was carried out to capture the sensitivity of the CT tonnages produced to the fluctuations of the input variables.","abstract_has_math":false,"creators":["Kalantari, Samira"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Askari-Nasab, Hooman (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011-11","date_published":"2011-11","updated_at":"2026-11-26T21:14:26Z","subjects":["Composite Tailings","Mine Plan","Oil Sands"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3HC7Z","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3HC7Z","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F87413","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F87413","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Askari-Nasab, Hooman (Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Joseph, Tim (Civil and Environmental Engineering)","Boisvert, Jeff (Civil and Environmental Engineering)","Reformat, Marek (Electrical and Computer Engineering)"]},{"key":"dc:creator","label":"Author","values":["Kalantari, Samira"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T06:57:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T06:57:34Z"]},{"key":"dc:date.issued","label":"Date","values":["2011-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Composite Tailings","Mine Plan","Oil Sands"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3HC7Z"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["One of the major issues in the current oil sands waste management techniques is a lack of a direct linkage between the long-term mine plans and the quantity of the tailings produced downstream. This research is focused on developing a linkage between oil sands long-term mine plans and the final composite tailings (CT) produced to assist the oil sands production process to be in compliance with the regulations set by Directive 074. A series of mass-balance relations between the ore tonnage and the final CT tonnage were developed. This was followed by the development of a code to employ the mass-balance relations in reporting the CT production schedule using the long-term mine plan. To capture the uncertainties associated with the CT production process, a stochastic simulation model was developed. Finally, sensitivity analysis was carried out to capture the sensitivity of the CT tonnages produced to the fluctuations of the input variables."]},{"key":"dc:title","label":"Title","values":["Linkage of Annual Oil Sands Mine Plan to Composite Tailings Plan"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Askari-Nasab, Hooman (Civil and Environmental Engineering)"],"dc:contributor.other":["Joseph, Tim (Civil and Environmental Engineering)","Boisvert, Jeff (Civil and Environmental Engineering)","Reformat, Marek (Electrical and Computer Engineering)"],"dc:creator":["Kalantari, Samira"],"dc:date.accessioned":["2025-05-29T06:57:34Z"],"dc:date.available":["2025-05-29T06:57:34Z"],"dc:date.issued":["2011-11"],"dc:description.abstract":["One of the major issues in the current oil sands waste management techniques is a lack of a direct linkage between the long-term mine plans and the quantity of the tailings produced downstream. This research is focused on developing a linkage between oil sands long-term mine plans and the final composite tailings (CT) produced to assist the oil sands production process to be in compliance with the regulations set by Directive 074. A series of mass-balance relations between the ore tonnage and the final CT tonnage were developed. This was followed by the development of a code to employ the mass-balance relations in reporting the CT production schedule using the long-term mine plan. To capture the uncertainties associated with the CT production process, a stochastic simulation model was developed. Finally, sensitivity analysis was carried out to capture the sensitivity of the CT tonnages produced to the fluctuations of the input variables."],"dc:identifier.doi":["https://doi.org/10.7939/R3HC7Z"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Composite Tailings","Mine Plan","Oil Sands"],"dc:title":["Linkage of Annual Oil Sands Mine Plan to Composite Tailings Plan"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:14:26Z"}