{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/88282"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/88282","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"A Framework to Improve Modular Construction Manufacturing Production Line Performance","abstract":"This thesis describes the implementation of a production line assessment framework to help shift off-site modular construction manufacturing (MCM) from a conventional construction approach toward true manufacturing. The framework, which integrates Lean manufacturing construction and value stream mapping (VSM) with a structure called “Production Line Breakdown Structure” (PBS), is developed to help analyze the current production line performance, identify existing issues, assess the proposed solution, and visualize the future implementation for modular construction manufacturing production lines. Throughout the process, conventional construction methodology, Lean manufacturing philosophy, and commonly used visualization tools are utilized in conjunction with the framework to promote the efficient cooperation between modular construction manufacturing and innovative thinking. Research is developed in collaboration with an industry partner, Kent Homes. It is presented as a case study to illustrate how the proposed framework can be deployed to effectively improve modular construction manufacturing processes.","abstract_html":"This thesis describes the implementation of a production line assessment framework to help shift off-site modular construction manufacturing (MCM) from a conventional construction approach toward true manufacturing. The framework, which integrates Lean manufacturing construction and value stream mapping (VSM) with a structure called “Production Line Breakdown Structure” (PBS), is developed to help analyze the current production line performance, identify existing issues, assess the proposed solution, and visualize the future implementation for modular construction manufacturing production lines. Throughout the process, conventional construction methodology, Lean manufacturing philosophy, and commonly used visualization tools are utilized in conjunction with the framework to promote the efficient cooperation between modular construction manufacturing and innovative thinking. Research is developed in collaboration with an industry partner, Kent Homes. It is presented as a case study to illustrate how the proposed framework can be deployed to effectively improve modular construction manufacturing processes.","abstract_has_math":false,"creators":["Zhang, Youyi"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction and Management Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Ahmed Bouferguene (Chemistry)","Mohamed Al-Hussein (Construction Engineering)"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-06","date_published":"2017-06","updated_at":"2026-11-26T20:53:16Z","subjects":["Manufacturing","Lean","Modular construction","Process improvement","Production line"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R31J97M21","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R31J97M21","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F88282","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F88282","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ahmed Bouferguene (Chemistry)","Mohamed Al-Hussein (Construction Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Yasser Mohamed (Construction Engineering)"]},{"key":"dc:creator","label":"Author","values":["Zhang, Youyi"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T07:17:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T07:17:40Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction and Management Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Manufacturing","Lean","Modular construction","Process improvement","Production line"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R31J97M21"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis describes the implementation of a production line assessment framework to help shift off-site modular construction manufacturing (MCM) from a conventional construction approach toward true manufacturing. The framework, which integrates Lean manufacturing construction and value stream mapping (VSM) with a structure called “Production Line Breakdown Structure” (PBS), is developed to help analyze the current production line performance, identify existing issues, assess the proposed solution, and visualize the future implementation for modular construction manufacturing production lines. Throughout the process, conventional construction methodology, Lean manufacturing philosophy, and commonly used visualization tools are utilized in conjunction with the framework to promote the efficient cooperation between modular construction manufacturing and innovative thinking. Research is developed in collaboration with an industry partner, Kent Homes. It is presented as a case study to illustrate how the proposed framework can be deployed to effectively improve modular construction manufacturing processes."]},{"key":"dc:title","label":"Title","values":["A Framework to Improve Modular Construction Manufacturing Production Line Performance"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ahmed Bouferguene (Chemistry)","Mohamed Al-Hussein (Construction Engineering)"],"dc:contributor.other":["Yasser Mohamed (Construction Engineering)"],"dc:creator":["Zhang, Youyi"],"dc:date.accessioned":["2025-05-29T07:17:40Z"],"dc:date.available":["2025-05-29T07:17:40Z"],"dc:date.issued":["2017-06"],"dc:description.abstract":["This thesis describes the implementation of a production line assessment framework to help shift off-site modular construction manufacturing (MCM) from a conventional construction approach toward true manufacturing. The framework, which integrates Lean manufacturing construction and value stream mapping (VSM) with a structure called “Production Line Breakdown Structure” (PBS), is developed to help analyze the current production line performance, identify existing issues, assess the proposed solution, and visualize the future implementation for modular construction manufacturing production lines. Throughout the process, conventional construction methodology, Lean manufacturing philosophy, and commonly used visualization tools are utilized in conjunction with the framework to promote the efficient cooperation between modular construction manufacturing and innovative thinking. Research is developed in collaboration with an industry partner, Kent Homes. It is presented as a case study to illustrate how the proposed framework can be deployed to effectively improve modular construction manufacturing processes."],"dc:identifier.doi":["https://doi.org/10.7939/R31J97M21"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Manufacturing","Lean","Modular construction","Process improvement","Production line"],"dc:title":["A Framework to Improve Modular Construction Manufacturing Production Line Performance"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction and Management Engineering"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T20:53:16Z"}