{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/90802"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/90802","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Optimization of industrial shop scheduling using simulation and fuzzy logic","abstract":"The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in the field, and therefore time and cost of construction projects are reduced by making use of industrial fabrication. Effective planning and scheduling of the industrial fabrication processes is important for the success of construction projects. This thesis focuses on developing a new framework for optimizing shop scheduling, particularly pipe spool fabrication shop scheduling. The proposed framework makes it possible to capture uncertainty of the pipe spool fabrication shop while accounting for linguistic vagueness of the decision makers’ preferences using simulation modeling and fuzzy set theory. The implementation of the proposed framework is discussed using a real case study of a pipe spool fabrication shop. In this thesis, first, a simulation based scheduling framework is presented based on the integration of relational database management system, product modeling, process modeling, and heuristic approaches. Next, a framework for optimization of the industrial shop scheduling with respect to multiple criteria is proposed. Fuzzy set theory is used to linguistically assess different levels of satisfaction for the selected criteria. Additionally, an executable scheduling toolkit is introduced as a decision support system for pipe spool fabrication shop.","abstract_html":"The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in the field, and therefore time and cost of construction projects are reduced by making use of industrial fabrication. Effective planning and scheduling of the industrial fabrication processes is important for the success of construction projects. This thesis focuses on developing a new framework for optimizing shop scheduling, particularly pipe spool fabrication shop scheduling. The proposed framework makes it possible to capture uncertainty of the pipe spool fabrication shop while accounting for linguistic vagueness of the decision makers’ preferences using simulation modeling and fuzzy set theory. The implementation of the proposed framework is discussed using a real case study of a pipe spool fabrication shop. In this thesis, first, a simulation based scheduling framework is presented based on the integration of relational database management system, product modeling, process modeling, and heuristic approaches. Next, a framework for optimization of the industrial shop scheduling with respect to multiple criteria is proposed. Fuzzy set theory is used to linguistically assess different levels of satisfaction for the selected criteria. Additionally, an executable scheduling toolkit is introduced as a decision support system for pipe spool fabrication shop.","abstract_has_math":false,"creators":["Rokni, Sima"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Fayek, Aminah Robinson ( Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-06","date_published":"2010-06","updated_at":"2026-11-26T21:59:29Z","subjects":["Fuzzy set theory","Priority rules","Multi-criteria scheduling","Pareto-optimality","Industrial construction","Operations research","Simulations"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3J42Z","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3J42Z","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F90802","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F90802","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fayek, Aminah Robinson ( Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Fayek, Aminah Robinson ( Civil and Environmental Engineering)","Mohamed, Yasser (Civil and Environmental Engineering)","Doucette, John (Mechanical Engineering)"]},{"key":"dc:creator","label":"Author","values":["Rokni, Sima"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T09:32:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T09:32:54Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Fuzzy set theory","Priority rules","Multi-criteria scheduling","Pareto-optimality","Industrial construction","Operations research","Simulations"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3J42Z"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in the field, and therefore time and cost of construction projects are reduced by making use of industrial fabrication. Effective planning and scheduling of the industrial fabrication processes is important for the success of construction projects. This thesis focuses on developing a new framework for optimizing shop scheduling, particularly pipe spool fabrication shop scheduling. The proposed framework makes it possible to capture uncertainty of the pipe spool fabrication shop while accounting for linguistic vagueness of the decision makers’ preferences using simulation modeling and fuzzy set theory. The implementation of the proposed framework is discussed using a real case study of a pipe spool fabrication shop. In this thesis, first, a simulation based scheduling framework is presented based on the integration of relational database management system, product modeling, process modeling, and heuristic approaches. Next, a framework for optimization of the industrial shop scheduling with respect to multiple criteria is proposed. Fuzzy set theory is used to linguistically assess different levels of satisfaction for the selected criteria. Additionally, an executable scheduling toolkit is introduced as a decision support system for pipe spool fabrication shop."]},{"key":"dc:title","label":"Title","values":["Optimization of industrial shop scheduling using simulation and fuzzy logic"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fayek, Aminah Robinson ( Civil and Environmental Engineering)"],"dc:contributor.other":["Fayek, Aminah Robinson ( Civil and Environmental Engineering)","Mohamed, Yasser (Civil and Environmental Engineering)","Doucette, John (Mechanical Engineering)"],"dc:creator":["Rokni, Sima"],"dc:date.accessioned":["2025-05-29T09:32:54Z"],"dc:date.available":["2025-05-29T09:32:54Z"],"dc:date.issued":["2010-06"],"dc:description.abstract":["The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in the field, and therefore time and cost of construction projects are reduced by making use of industrial fabrication. Effective planning and scheduling of the industrial fabrication processes is important for the success of construction projects. This thesis focuses on developing a new framework for optimizing shop scheduling, particularly pipe spool fabrication shop scheduling. The proposed framework makes it possible to capture uncertainty of the pipe spool fabrication shop while accounting for linguistic vagueness of the decision makers’ preferences using simulation modeling and fuzzy set theory. The implementation of the proposed framework is discussed using a real case study of a pipe spool fabrication shop. In this thesis, first, a simulation based scheduling framework is presented based on the integration of relational database management system, product modeling, process modeling, and heuristic approaches. Next, a framework for optimization of the industrial shop scheduling with respect to multiple criteria is proposed. Fuzzy set theory is used to linguistically assess different levels of satisfaction for the selected criteria. Additionally, an executable scheduling toolkit is introduced as a decision support system for pipe spool fabrication shop."],"dc:identifier.doi":["https://doi.org/10.7939/R3J42Z"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Fuzzy set theory","Priority rules","Multi-criteria scheduling","Pareto-optimality","Industrial construction","Operations research","Simulations"],"dc:title":["Optimization of industrial shop scheduling using simulation and fuzzy logic"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:59:29Z"}