{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/91209"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/91209","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"An infrastructure reconstruction decision-making model for postwar situations","abstract":null,"abstract_html":null,"abstract_has_math":false,"creators":["Fofanah, John Bundu"],"institution":"University of Alberta","degree_name":"Doctor of Philosophy in construction engineering and management","degree_level":"Doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008-06","date_published":"2008-06","updated_at":"2026-11-26T21:56:18Z","subjects":["Infrastructure (Economics). Sierra Leone. Finance.","Public utilities. Sierra Leone. Finance.","Decision making. Sierra Leone."],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/r3-9xh1-f886","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/r3-9xh1-f886","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F91209","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F91209","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Fofanah, John Bundu"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T09:35:52Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T09:35:52Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy in construction engineering and management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Infrastructure (Economics). Sierra Leone. Finance.","Public utilities. Sierra Leone. Finance.","Decision making. Sierra Leone."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/r3-9xh1-f886"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:title","label":"Title","values":["An infrastructure reconstruction decision-making model for postwar situations"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Fofanah, John Bundu"],"dc:date.accessioned":["2025-05-29T09:35:52Z"],"dc:date.available":["2025-05-29T09:35:52Z"],"dc:date.issued":["2008-06"],"dc:identifier.doi":["https://doi.org/10.7939/r3-9xh1-f886"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for the purpose of private, scholarly or scientific research. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Infrastructure (Economics). Sierra Leone. Finance.","Public utilities. Sierra Leone. Finance.","Decision making. Sierra Leone."],"dc:title":["An infrastructure reconstruction decision-making model for postwar situations"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_level":["Doctoral"],"thesis:degree_name":["Doctor of Philosophy in construction engineering and management"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:56:18Z"}