{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/92190"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/92190","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Assessment of Pipeline Installation Using the Eliminator: a New Guided Boring Machine","abstract":"The Eliminator is a new guided boring machine developed to address the market need for Pilot Tube Microtunneling (PTMT) installations in non-displaceable soils. This study is part of a multi-phase research project sponsored by the Natural Sciences and Engineering Research Council of Canada (NSERC) and the City of Edmonton. The main objectives of this research is to investigate the productivity of the Eliminator, risks associated with this machine, and methods to predict the required jacking force for installation of pipes. To achieve these goals, firstly a broad literature review was conducted on PTMT and the Eliminator as well as similar technologies such as microtunneling and pipe jacking. The study then introduces the first pipeline installation project performed with the Eliminator and assesses the technology’s economic performance using the project’s productivity and risk measures. The jacking force of the project was also monitored for analysis using hydraulic pressure transducers. Five existing jacking force prediction models used for technologies similar to the Eliminator were analyzed and compared with each force measured in the field. Based on the comparison, appropriate methods for estimating the jacking force of Eliminator projects are suggested.","abstract_html":"The Eliminator is a new guided boring machine developed to address the market need for Pilot Tube Microtunneling (PTMT) installations in non-displaceable soils. This study is part of a multi-phase research project sponsored by the Natural Sciences and Engineering Research Council of Canada (NSERC) and the City of Edmonton. The main objectives of this research is to investigate the productivity of the Eliminator, risks associated with this machine, and methods to predict the required jacking force for installation of pipes. To achieve these goals, firstly a broad literature review was conducted on PTMT and the Eliminator as well as similar technologies such as microtunneling and pipe jacking. The study then introduces the first pipeline installation project performed with the Eliminator and assesses the technology’s economic performance using the project’s productivity and risk measures. The jacking force of the project was also monitored for analysis using hydraulic pressure transducers. Five existing jacking force prediction models used for technologies similar to the Eliminator were analyzed and compared with each force measured in the field. Based on the comparison, appropriate methods for estimating the jacking force of Eliminator projects are suggested.","abstract_has_math":false,"creators":["Ranjbar, Mahmood"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Bayat, Alireza (Department of Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-06","date_published":"2015-06","updated_at":"2026-11-26T20:59:15Z","subjects":["Jacking force","Instrumentation","Productivity","Risk","Pipeline installation","Pilot Tube Microtunneling","Prediction model","Eliminator"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R34953","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R34953","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F92190","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F92190","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Bayat, Alireza (Department of Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Szymanski, Jozef (Department of Civil and Environmental Engineering)","Han SangUk (Department of Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Ranjbar, Mahmood"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T09:55:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T09:55:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Jacking force","Instrumentation","Productivity","Risk","Pipeline installation","Pilot Tube Microtunneling","Prediction model","Eliminator"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R34953"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Eliminator is a new guided boring machine developed to address the market need for Pilot Tube Microtunneling (PTMT) installations in non-displaceable soils. This study is part of a multi-phase research project sponsored by the Natural Sciences and Engineering Research Council of Canada (NSERC) and the City of Edmonton. The main objectives of this research is to investigate the productivity of the Eliminator, risks associated with this machine, and methods to predict the required jacking force for installation of pipes. To achieve these goals, firstly a broad literature review was conducted on PTMT and the Eliminator as well as similar technologies such as microtunneling and pipe jacking. The study then introduces the first pipeline installation project performed with the Eliminator and assesses the technology’s economic performance using the project’s productivity and risk measures. The jacking force of the project was also monitored for analysis using hydraulic pressure transducers. Five existing jacking force prediction models used for technologies similar to the Eliminator were analyzed and compared with each force measured in the field. Based on the comparison, appropriate methods for estimating the jacking force of Eliminator projects are suggested."]},{"key":"dc:title","label":"Title","values":["Assessment of Pipeline Installation Using the Eliminator: a New Guided Boring Machine"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Bayat, Alireza (Department of Civil and Environmental Engineering)"],"dc:contributor.other":["Szymanski, Jozef (Department of Civil and Environmental Engineering)","Han SangUk (Department of Civil and Environmental Engineering)"],"dc:creator":["Ranjbar, Mahmood"],"dc:date.accessioned":["2025-05-29T09:55:20Z"],"dc:date.available":["2025-05-29T09:55:20Z"],"dc:date.issued":["2015-06"],"dc:description.abstract":["The Eliminator is a new guided boring machine developed to address the market need for Pilot Tube Microtunneling (PTMT) installations in non-displaceable soils. This study is part of a multi-phase research project sponsored by the Natural Sciences and Engineering Research Council of Canada (NSERC) and the City of Edmonton. The main objectives of this research is to investigate the productivity of the Eliminator, risks associated with this machine, and methods to predict the required jacking force for installation of pipes. To achieve these goals, firstly a broad literature review was conducted on PTMT and the Eliminator as well as similar technologies such as microtunneling and pipe jacking. The study then introduces the first pipeline installation project performed with the Eliminator and assesses the technology’s economic performance using the project’s productivity and risk measures. The jacking force of the project was also monitored for analysis using hydraulic pressure transducers. Five existing jacking force prediction models used for technologies similar to the Eliminator were analyzed and compared with each force measured in the field. Based on the comparison, appropriate methods for estimating the jacking force of Eliminator projects are suggested."],"dc:identifier.doi":["https://doi.org/10.7939/R34953"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Jacking force","Instrumentation","Productivity","Risk","Pipeline installation","Pilot Tube Microtunneling","Prediction model","Eliminator"],"dc:title":["Assessment of Pipeline Installation Using the Eliminator: a New Guided Boring Machine"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T20:59:15Z"}