{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/92871"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/92871","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Automation of Quantity Takeoff and Material Optimization for Residential Construction Manufacturing","abstract":"Quantity takeoff is repetitive work in the modular construction industry. The current process, which is typically carried out manually, is time consuming and error-prone. This thesis proposes a methodology to automate the quantity takeoff process. The central aim of this research is to create a bridge between the building information modelling (BIM) 3D model and a database that can be used to hold data extracted from the model. This bridge allows the automatic transfer of material quantities from the BIM model to the database. Another issue associated with residential construction is material waste, especially for 1D and 2D framing materials, which is caused by insufficient planning of cutting processes. Hence, this thesis also presents a methodology to optimize material usage (focusing on lumber and sheathing). 1D and 2D materials are extracted from the BIM 3D model and then organized in order to establish optimized lumber and sheathing cutting plans.","abstract_html":"Quantity takeoff is repetitive work in the modular construction industry. The current process, which is typically carried out manually, is time consuming and error-prone. This thesis proposes a methodology to automate the quantity takeoff process. The central aim of this research is to create a bridge between the building information modelling (BIM) 3D model and a database that can be used to hold data extracted from the model. This bridge allows the automatic transfer of material quantities from the BIM model to the database. Another issue associated with residential construction is material waste, especially for 1D and 2D framing materials, which is caused by insufficient planning of cutting processes. Hence, this thesis also presents a methodology to optimize material usage (focusing on lumber and sheathing). 1D and 2D materials are extracted from the BIM 3D model and then organized in order to establish optimized lumber and sheathing cutting plans.","abstract_has_math":false,"creators":["Zhao, Hongru"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering & Management","degree_department":null,"school":null,"contributors":[],"advisors":["Mohamed Al-Hussein (Civil and Environmental Engineering)","Ahmed Bouferguene (Civil and Environmental Engineering)"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-11","date_published":"2015-11","updated_at":"2026-11-26T21:17:02Z","subjects":["Quantity Takeoff","Material Optimization"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R34T6FB5X","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R34T6FB5X","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F92871","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F92871","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mohamed Al-Hussein (Civil and Environmental Engineering)","Ahmed Bouferguene (Civil and Environmental Engineering)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Marwan El-Rich (Civil and Environmental Engineering)","Ahmed Bouferguene (Civil and Environmental Engineering)","Mohamed Al-Hussein (Civil and Environmental Engineering)","SangUk Han (Civil and Environmental Engineering)"]},{"key":"dc:creator","label":"Author","values":["Zhao, Hongru"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T10:52:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T10:52:34Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering & Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Quantity Takeoff","Material Optimization"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R34T6FB5X"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Quantity takeoff is repetitive work in the modular construction industry. The current process, which is typically carried out manually, is time consuming and error-prone. This thesis proposes a methodology to automate the quantity takeoff process. The central aim of this research is to create a bridge between the building information modelling (BIM) 3D model and a database that can be used to hold data extracted from the model. This bridge allows the automatic transfer of material quantities from the BIM model to the database. Another issue associated with residential construction is material waste, especially for 1D and 2D framing materials, which is caused by insufficient planning of cutting processes. Hence, this thesis also presents a methodology to optimize material usage (focusing on lumber and sheathing). 1D and 2D materials are extracted from the BIM 3D model and then organized in order to establish optimized lumber and sheathing cutting plans."]},{"key":"dc:title","label":"Title","values":["Automation of Quantity Takeoff and Material Optimization for Residential Construction Manufacturing"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mohamed Al-Hussein (Civil and Environmental Engineering)","Ahmed Bouferguene (Civil and Environmental Engineering)"],"dc:contributor.other":["Marwan El-Rich (Civil and Environmental Engineering)","Ahmed Bouferguene (Civil and Environmental Engineering)","Mohamed Al-Hussein (Civil and Environmental Engineering)","SangUk Han (Civil and Environmental Engineering)"],"dc:creator":["Zhao, Hongru"],"dc:date.accessioned":["2025-05-29T10:52:34Z"],"dc:date.available":["2025-05-29T10:52:34Z"],"dc:date.issued":["2015-11"],"dc:description.abstract":["Quantity takeoff is repetitive work in the modular construction industry. The current process, which is typically carried out manually, is time consuming and error-prone. This thesis proposes a methodology to automate the quantity takeoff process. The central aim of this research is to create a bridge between the building information modelling (BIM) 3D model and a database that can be used to hold data extracted from the model. This bridge allows the automatic transfer of material quantities from the BIM model to the database. Another issue associated with residential construction is material waste, especially for 1D and 2D framing materials, which is caused by insufficient planning of cutting processes. Hence, this thesis also presents a methodology to optimize material usage (focusing on lumber and sheathing). 1D and 2D materials are extracted from the BIM 3D model and then organized in order to establish optimized lumber and sheathing cutting plans."],"dc:identifier.doi":["https://doi.org/10.7939/R34T6FB5X"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Quantity Takeoff","Material Optimization"],"dc:title":["Automation of Quantity Takeoff and Material Optimization for Residential Construction Manufacturing"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering & Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:17:02Z"}