{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/93872"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/93872","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Open Pit Mine Loading and Haulage Simulation","abstract":"The objective of this research is to estimate the main KPI's of an open pit mining truck and shovel operations, while quantifying uncertainty about the KPI's with high statistical confidence. Short-term production scheduling base their estimations on deterministic approaches, but the nature of mining operation is variable, so when execution of the plan comes, it faces a reality different to what it forecasts. The main contribution of this thesis is to quantify uncertainty in truck and shovel KPI’s due to operational uncertainties, planned and un-planned maintenance, and weather events with a 95% confidence interval. To achieve the research objectives, a discrete event simulation model for truck and shovel operations is built, verified, and validated against historical dispatch data. The following tasks are completed: a) statistical data analysis of historical dispatch data, b) fitting probability density functions on historical operational data, c) building a truck and shovel simulation model in Arena software, d) adding the preventive maintenance, failures, and weather events into the simulation model for trucks and shovels, e) validation of equipment performances against historical data, f) four different major scenarios are assessed with changing the number of ore and waste trucks and the throughput rate of the crusher to find the near optimal size of the fleet, g) the detail short-term expected production of ore and waste under monthly and weekly time frames are reported along with KPI's for tonnage, time charts, availably, and efficiency. The main contribution of this research is a discrete event simulation model for truck and shovel operations that predicts the major KPIs of a mining operation with 95% statistical confidence about the statistics of interest while quantifying the uncertainty around the estimation.","abstract_html":"The objective of this research is to estimate the main KPI&#x27;s of an open pit mining truck and shovel operations, while quantifying uncertainty about the KPI&#x27;s with high statistical confidence. Short-term production scheduling base their estimations on deterministic approaches, but the nature of mining operation is variable, so when execution of the plan comes, it faces a reality different to what it forecasts. The main contribution of this thesis is to quantify uncertainty in truck and shovel KPI’s due to operational uncertainties, planned and un-planned maintenance, and weather events with a 95% confidence interval. To achieve the research objectives, a discrete event simulation model for truck and shovel operations is built, verified, and validated against historical dispatch data. The following tasks are completed: a) statistical data analysis of historical dispatch data, b) fitting probability density functions on historical operational data, c) building a truck and shovel simulation model in Arena software, d) adding the preventive maintenance, failures, and weather events into the simulation model for trucks and shovels, e) validation of equipment performances against historical data, f) four different major scenarios are assessed with changing the number of ore and waste trucks and the throughput rate of the crusher to find the near optimal size of the fleet, g) the detail short-term expected production of ore and waste under monthly and weekly time frames are reported along with KPI&#x27;s for tonnage, time charts, availably, and efficiency. The main contribution of this research is a discrete event simulation model for truck and shovel operations that predicts the major KPIs of a mining operation with 95% statistical confidence about the statistics of interest while quantifying the uncertainty around the estimation.","abstract_has_math":false,"creators":["Montes Higuita,Luisa F"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Mining Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Hooman Askari (Civil and Environmental)"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-11","date_published":"2017-11","updated_at":"2026-11-26T20:56:12Z","subjects":["Open pit mine discrete event simulation","Mine hauling","Truck and Shovel discrete event simulation"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/R3B27Q386","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/R3B27Q386","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F93872","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F93872","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hooman Askari (Civil and Environmental)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Yashar Pourrahimian (Civil and Environmental)","Wei Victor Liu (Civil and Environmental)"]},{"key":"dc:creator","label":"Author","values":["Montes Higuita,Luisa F"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T11:05:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T11:05:34Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Open pit mine discrete event simulation","Mine hauling","Truck and Shovel discrete event simulation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/R3B27Q386"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The objective of this research is to estimate the main KPI's of an open pit mining truck and shovel operations, while quantifying uncertainty about the KPI's with high statistical confidence. Short-term production scheduling base their estimations on deterministic approaches, but the nature of mining operation is variable, so when execution of the plan comes, it faces a reality different to what it forecasts. The main contribution of this thesis is to quantify uncertainty in truck and shovel KPI’s due to operational uncertainties, planned and un-planned maintenance, and weather events with a 95% confidence interval. To achieve the research objectives, a discrete event simulation model for truck and shovel operations is built, verified, and validated against historical dispatch data. The following tasks are completed: a) statistical data analysis of historical dispatch data, b) fitting probability density functions on historical operational data, c) building a truck and shovel simulation model in Arena software, d) adding the preventive maintenance, failures, and weather events into the simulation model for trucks and shovels, e) validation of equipment performances against historical data, f) four different major scenarios are assessed with changing the number of ore and waste trucks and the throughput rate of the crusher to find the near optimal size of the fleet, g) the detail short-term expected production of ore and waste under monthly and weekly time frames are reported along with KPI's for tonnage, time charts, availably, and efficiency. The main contribution of this research is a discrete event simulation model for truck and shovel operations that predicts the major KPIs of a mining operation with 95% statistical confidence about the statistics of interest while quantifying the uncertainty around the estimation."]},{"key":"dc:title","label":"Title","values":["Open Pit Mine Loading and Haulage Simulation"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hooman Askari (Civil and Environmental)"],"dc:contributor.other":["Yashar Pourrahimian (Civil and Environmental)","Wei Victor Liu (Civil and Environmental)"],"dc:creator":["Montes Higuita,Luisa F"],"dc:date.accessioned":["2025-05-29T11:05:34Z"],"dc:date.available":["2025-05-29T11:05:34Z"],"dc:date.issued":["2017-11"],"dc:description.abstract":["The objective of this research is to estimate the main KPI's of an open pit mining truck and shovel operations, while quantifying uncertainty about the KPI's with high statistical confidence. Short-term production scheduling base their estimations on deterministic approaches, but the nature of mining operation is variable, so when execution of the plan comes, it faces a reality different to what it forecasts. The main contribution of this thesis is to quantify uncertainty in truck and shovel KPI’s due to operational uncertainties, planned and un-planned maintenance, and weather events with a 95% confidence interval. To achieve the research objectives, a discrete event simulation model for truck and shovel operations is built, verified, and validated against historical dispatch data. The following tasks are completed: a) statistical data analysis of historical dispatch data, b) fitting probability density functions on historical operational data, c) building a truck and shovel simulation model in Arena software, d) adding the preventive maintenance, failures, and weather events into the simulation model for trucks and shovels, e) validation of equipment performances against historical data, f) four different major scenarios are assessed with changing the number of ore and waste trucks and the throughput rate of the crusher to find the near optimal size of the fleet, g) the detail short-term expected production of ore and waste under monthly and weekly time frames are reported along with KPI's for tonnage, time charts, availably, and efficiency. The main contribution of this research is a discrete event simulation model for truck and shovel operations that predicts the major KPIs of a mining operation with 95% statistical confidence about the statistics of interest while quantifying the uncertainty around the estimation."],"dc:identifier.doi":["https://doi.org/10.7939/R3B27Q386"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Open pit mine discrete event simulation","Mine hauling","Truck and Shovel discrete event simulation"],"dc:title":["Open Pit Mine Loading and Haulage Simulation"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T20:56:12Z"}