{"id":{"repo_id":"alberta","oai_identifier":"oai:ualberta.scholaris.ca:123456789/97037"},"canonical_url":"https://search.ndltd.org/etd/alberta/oai:ualberta.scholaris.ca:123456789/97037","repository":{"repo_id":"alberta","name":"University of Alberta","base_url":"https://era.library.ualberta.ca/oai"},"display":{"title":"Evaluating Time-Cost-Carbon Emission Trade-Offs in Construction: A Study of Onsite Optimization and Offsite Prefabrication Methods","abstract":"This research investigates strategies to accelerate construction projects while balancing cost and environmental considerations, using a single-family house construction project in Edmonton, Canada, as a case study. Two strategies are examined: onsite trade-off optimization and offsite prefabrication. The first strategy employs a Non-dominated Sorting Genetic Algorithm (NSGA-II) to optimize the time, cost, and carbon emissions of a stick-built construction process. By inputting data on activities, costs, and carbon emissions at normal and crash levels, the model generates optimal trade-off solutions through iterative selection, crossover, and mutation, offering a range of shortened project durations based on budget and sustainability goals. The second strategy focuses on scheduling the offsite construction process, where portions of the project are prefabricated in a factory and installed onsite. This method enhances schedule predictability and reduces build time, resulting in an 18% reduction in project duration, a 24.89% decrease in costs, and a 31.67% reduction in carbon emissions. Combining these strategies can significantly improve project efficiency in terms of time, cost, and environmental impact, even under construction uncertainties. These findings highlight the potential for improved construction project management through innovative optimization and prefabrication techniques.","abstract_html":"This research investigates strategies to accelerate construction projects while balancing cost and environmental considerations, using a single-family house construction project in Edmonton, Canada, as a case study. Two strategies are examined: onsite trade-off optimization and offsite prefabrication. The first strategy employs a Non-dominated Sorting Genetic Algorithm (NSGA-II) to optimize the time, cost, and carbon emissions of a stick-built construction process. By inputting data on activities, costs, and carbon emissions at normal and crash levels, the model generates optimal trade-off solutions through iterative selection, crossover, and mutation, offering a range of shortened project durations based on budget and sustainability goals. The second strategy focuses on scheduling the offsite construction process, where portions of the project are prefabricated in a factory and installed onsite. This method enhances schedule predictability and reduces build time, resulting in an 18% reduction in project duration, a 24.89% decrease in costs, and a 31.67% reduction in carbon emissions. Combining these strategies can significantly improve project efficiency in terms of time, cost, and environmental impact, even under construction uncertainties. These findings highlight the potential for improved construction project management through innovative optimization and prefabrication techniques.","abstract_has_math":false,"creators":["Oluyale, Kehinde J"],"institution":"University of Alberta","degree_name":"Master of Science","degree_level":"Master's","degree_discipline":"Construction Engineering and Management","degree_department":null,"school":null,"contributors":[],"advisors":["Mohamed, Al-Hussein (Department of Civil and Environmental Engineering)","Ahmed, Bouferguene (Campus Saint-Jean)"],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-11","date_published":"2024-11","updated_at":"2026-11-26T21:19:32Z","subjects":["Construction Activities","Scheduling","Trade-off Optimization","Offsite Prefabrication","Carbon Emissions"],"languages":["en"],"rights":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.7939/r3-e089-cm78","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.7939/r3-e089-cm78","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aalberta%3Aoai%3Aualberta.scholaris.ca%3A123456789%2F97037","prefix":"oai_dc"},"source_record":{"url":"https://era.library.ualberta.ca/oai?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aualberta.scholaris.ca%3A123456789%2F97037","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mohamed, Al-Hussein (Department of Civil and Environmental Engineering)","Ahmed, Bouferguene (Campus Saint-Jean)"]},{"key":"dc:creator","label":"Author","values":["Oluyale, Kehinde J"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-29T13:28:08Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-29T13:28:08Z"]},{"key":"dc:date.issued","label":"Date","values":["2024-11"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Alberta"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction Activities","Scheduling","Trade-off Optimization","Offsite Prefabrication","Carbon Emissions"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.7939/r3-e089-cm78"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research investigates strategies to accelerate construction projects while balancing cost and environmental considerations, using a single-family house construction project in Edmonton, Canada, as a case study. Two strategies are examined: onsite trade-off optimization and offsite prefabrication. The first strategy employs a Non-dominated Sorting Genetic Algorithm (NSGA-II) to optimize the time, cost, and carbon emissions of a stick-built construction process. By inputting data on activities, costs, and carbon emissions at normal and crash levels, the model generates optimal trade-off solutions through iterative selection, crossover, and mutation, offering a range of shortened project durations based on budget and sustainability goals. The second strategy focuses on scheduling the offsite construction process, where portions of the project are prefabricated in a factory and installed onsite. This method enhances schedule predictability and reduces build time, resulting in an 18% reduction in project duration, a 24.89% decrease in costs, and a 31.67% reduction in carbon emissions. Combining these strategies can significantly improve project efficiency in terms of time, cost, and environmental impact, even under construction uncertainties. These findings highlight the potential for improved construction project management through innovative optimization and prefabrication techniques."]},{"key":"dc:title","label":"Title","values":["Evaluating Time-Cost-Carbon Emission Trade-Offs in Construction: A Study of Onsite Optimization and Offsite Prefabrication Methods"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mohamed, Al-Hussein (Department of Civil and Environmental Engineering)","Ahmed, Bouferguene (Campus Saint-Jean)"],"dc:creator":["Oluyale, Kehinde J"],"dc:date.accessioned":["2025-05-29T13:28:08Z"],"dc:date.available":["2025-05-29T13:28:08Z"],"dc:date.issued":["2024-11"],"dc:description.abstract":["This research investigates strategies to accelerate construction projects while balancing cost and environmental considerations, using a single-family house construction project in Edmonton, Canada, as a case study. Two strategies are examined: onsite trade-off optimization and offsite prefabrication. The first strategy employs a Non-dominated Sorting Genetic Algorithm (NSGA-II) to optimize the time, cost, and carbon emissions of a stick-built construction process. By inputting data on activities, costs, and carbon emissions at normal and crash levels, the model generates optimal trade-off solutions through iterative selection, crossover, and mutation, offering a range of shortened project durations based on budget and sustainability goals. The second strategy focuses on scheduling the offsite construction process, where portions of the project are prefabricated in a factory and installed onsite. This method enhances schedule predictability and reduces build time, resulting in an 18% reduction in project duration, a 24.89% decrease in costs, and a 31.67% reduction in carbon emissions. Combining these strategies can significantly improve project efficiency in terms of time, cost, and environmental impact, even under construction uncertainties. These findings highlight the potential for improved construction project management through innovative optimization and prefabrication techniques."],"dc:identifier.doi":["https://doi.org/10.7939/r3-e089-cm78"],"dc:language.iso":["en"],"dc:rights":["This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law."],"dc:subject":["Construction Activities","Scheduling","Trade-off Optimization","Offsite Prefabrication","Carbon Emissions"],"dc:title":["Evaluating Time-Cost-Carbon Emission Trade-Offs in Construction: A Study of Onsite Optimization and Offsite Prefabrication Methods"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Construction Engineering and Management"],"thesis:degree_level":["Master's"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Alberta"]},"updated_at":"2026-11-26T21:19:32Z"}