{"id":{"repo_id":"aston","oai_identifier":"oai:publications.aston.ac.uk:21594"},"canonical_url":"https://search.ndltd.org/etd/aston/oai:publications.aston.ac.uk:21594","repository":{"repo_id":"aston","name":"Aston University","base_url":"https://publications.aston.ac.uk/cgi/oai2"},"display":{"title":"A production system and its control","abstract":"Originated in my own experience, this research is concerned with the problems of effective operation and delay in the adaptation of the Production System in manufacturing companies. The aim of this research is to establish a coherent framework to analyse the problem of Production Control...","abstract_html":"Originated in my own experience, this research is concerned with the problems of effective operation and delay in the adaptation of the Production System in manufacturing companies. The aim of this research is to establish a coherent framework to analyse the problem of Production Control...","abstract_has_math":false,"creators":["Franco Goni, Hector Patricio"],"institution":"Aston University","degree_name":"masters","degree_level":"masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1983,"date_issued":"1983","date_published":"1983","updated_at":"2026-11-25T19:48:19Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://publications.aston.ac.uk/id/eprint/21594/"],"render_values":[{"text":"https://publications.aston.ac.uk/id/eprint/21594/","href":"https://publications.aston.ac.uk/id/eprint/21594/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.48780/publications.aston.ac.uk.00021594","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.48780/publications.aston.ac.uk.00021594","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aaston%3Aoai%3Apublications.aston.ac.uk%3A21594","prefix":"oai_dc"},"source_record":{"url":"https://publications.aston.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Apublications.aston.ac.uk%3A21594","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Franco Goni, Hector Patricio"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1983"]},{"key":"dc:date.issued","label":"Date","values":["1983"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Aston Business School"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["Aston University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["masters"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["masters"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["10.48780/publications.aston.ac.uk.00021594"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://publications.aston.ac.uk/id/eprint/21594/"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Originated in my own experience, this research is concerned with the problems of effective operation and delay in the adaptation of the Production System in manufacturing companies. The aim of this research is to establish a coherent framework to analyse the problem of Production Control..."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["A production system and its control"]}]}],"canonical_facts":{"dc:creator":["Franco Goni, Hector Patricio"],"dc:date":["1983"],"dc:date.issued":["1983"],"dc:description.abstract":["Originated in my own experience, this research is concerned with the problems of effective operation and delay in the adaptation of the Production System in manufacturing companies. The aim of this research is to establish a coherent framework to analyse the problem of Production Control..."],"dc:format":["text"],"dc:identifier.doi":["10.48780/publications.aston.ac.uk.00021594"],"dc:identifier.uri":["https://publications.aston.ac.uk/id/eprint/21594/"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["Aston Business School"],"dc:publisher.institution":["Aston University"],"dcterms:accessrights":["public"],"dc:title":["A production system and its control"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["masters"],"dc:type.qualificationname":["masters"]},"updated_at":"2026-11-25T19:48:19Z"}