{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:4465"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:4465","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"Improving railway safety risk assessment study","abstract":"Railway safety is very important, as it concerns human lives. Therefore identifying risks from possible failures is vital to maintain the safety of railways. Currently, many mature tools, such as fault tree analysis and event tree analysis, are applied to investigate possible risks to railway safety. However, in many circumstances, the applications of these tools are unable to provide satisfactory results when the risk data is incomplete or there is a high level of uncertainty involved in the risk dataThus it is essential to develop new methods to overcome the weakness of current assessment tools. This thesis introduces an improved intelligent system for risk analysis usingfuzzy reasoning approach (FRA) and improved fuzzy analytical hierarchy decision making process (Fuzzy-AHP), which is specially designed and developed for the railways, and able to deal with the uncertainty in risk assessment.","abstract_html":"Railway safety is very important, as it concerns human lives. Therefore identifying risks from possible failures is vital to maintain the safety of railways. Currently, many mature tools, such as fault tree analysis and event tree analysis, are applied to investigate possible risks to railway safety. However, in many circumstances, the applications of these tools are unable to provide satisfactory results when the risk data is incomplete or there is a high level of uncertainty involved in the risk dataThus it is essential to develop new methods to overcome the weakness of current assessment tools. This thesis introduces an improved intelligent system for risk analysis usingfuzzy reasoning approach (FRA) and improved fuzzy analytical hierarchy decision making process (Fuzzy-AHP), which is specially designed and developed for the railways, and able to deal with the uncertainty in risk assessment.","abstract_has_math":false,"creators":["Chen, Yao"],"institution":"University of Birmingham","degree_name":"d_ph","degree_level":"d_ph","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-07","date_published":"2013-07","updated_at":"2026-11-19T09:27:43Z","subjects":["TA Engineering (General). Civil engineering (General)","TF Railroad engineering and operation"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/4465/1/Chen13PhD.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A4465","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["na"]},{"key":"dc:creator","label":"Author","values":["Chen, Yao"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013-07-01"]},{"key":"dc:date.issued","label":"Date","values":["2013-07"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Engineering, Department of Civil Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/4465/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["d_ph"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["d_ph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["TA Engineering (General). Civil engineering (General)","TF Railroad engineering and operation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/4465/1/Chen13PhD.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Railway safety is very important, as it concerns human lives. Therefore identifying risks from possible failures is vital to maintain the safety of railways. Currently, many mature tools, such as fault tree analysis and event tree analysis, are applied to investigate possible risks to railway safety. However, in many circumstances, the applications of these tools are unable to provide satisfactory results when the risk data is incomplete or there is a high level of uncertainty involved in the risk dataThus it is essential to develop new methods to overcome the weakness of current assessment tools. This thesis introduces an improved intelligent system for risk analysis usingfuzzy reasoning approach (FRA) and improved fuzzy analytical hierarchy decision making process (Fuzzy-AHP), which is specially designed and developed for the railways, and able to deal with the uncertainty in risk assessment."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Improving railway safety risk assessment study"]}]}],"canonical_facts":{"dc:contributor.sponsor":["na"],"dc:creator":["Chen, Yao"],"dc:date":["2013-07-01"],"dc:date.issued":["2013-07"],"dc:description.abstract":["Railway safety is very important, as it concerns human lives. Therefore identifying risks from possible failures is vital to maintain the safety of railways. Currently, many mature tools, such as fault tree analysis and event tree analysis, are applied to investigate possible risks to railway safety. However, in many circumstances, the applications of these tools are unable to provide satisfactory results when the risk data is incomplete or there is a high level of uncertainty involved in the risk dataThus it is essential to develop new methods to overcome the weakness of current assessment tools. This thesis introduces an improved intelligent system for risk analysis usingfuzzy reasoning approach (FRA) and improved fuzzy analytical hierarchy decision making process (Fuzzy-AHP), which is specially designed and developed for the railways, and able to deal with the uncertainty in risk assessment."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/4465/1/Chen13PhD.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Engineering, Department of Civil Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/4465/"],"dc:subject":["TA Engineering (General). Civil engineering (General)","TF Railroad engineering and operation"],"dcterms:accessrights":["public"],"dc:title":["Improving railway safety risk assessment study"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["d_ph"],"dc:type.qualificationname":["d_ph"]},"updated_at":"2026-11-19T09:27:43Z"}