{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:5076"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:5076","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"Energy storage system for railway applications & analysis and modelling of electrochemical batteries for conductor rail gap DC railway","abstract":"A new model of energy storage has been created by using electrochemical batteries, which is helpful to analyse the possibility of using batteries for traction systems of DC railway. As a result, there are two opportunities of using batteries energy storage for traction system in DC railway: one is to build On-board applications for covering the discontinuous power supply over the gap; and the other is to build Stationary storage or track side application for recovering the braking energy used by batteries. This model can be used to identify the appropriate batteries for different applications.","abstract_html":"A new model of energy storage has been created by using electrochemical batteries, which is helpful to analyse the possibility of using batteries for traction systems of DC railway. As a result, there are two opportunities of using batteries energy storage for traction system in DC railway: one is to build On-board applications for covering the discontinuous power supply over the gap; and the other is to build Stationary storage or track side application for recovering the braking energy used by batteries. This model can be used to identify the appropriate batteries for different applications.","abstract_has_math":false,"creators":["Hajiabady, Siavash"],"institution":"University of Birmingham","degree_name":"m_rs","degree_level":"m_rs","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-07","date_published":"2014-07","updated_at":"2026-11-19T09:28:08Z","subjects":["TF Railroad engineering and operation"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/5076/1/Hajiabady14MRes.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A5076","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["na"]},{"key":"dc:creator","label":"Author","values":["Hajiabady, Siavash"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2014-07"]},{"key":"dc:date.issued","label":"Date","values":["2014-07"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Engineering, Department of Civil Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/5076/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["m_rs"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["m_rs"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["TF Railroad engineering and operation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/5076/1/Hajiabady14MRes.pdf","http://etheses.bham.ac.uk//id/eprint/5076/5/Decl_IS_Hajiabady14MRes.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A new model of energy storage has been created by using electrochemical batteries, which is helpful to analyse the possibility of using batteries for traction systems of DC railway. As a result, there are two opportunities of using batteries energy storage for traction system in DC railway: one is to build On-board applications for covering the discontinuous power supply over the gap; and the other is to build Stationary storage or track side application for recovering the braking energy used by batteries. This model can be used to identify the appropriate batteries for different applications."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public","staffonly"]},{"key":"dc:title","label":"Title","values":["Energy storage system for railway applications & analysis and modelling of electrochemical batteries for conductor rail gap DC railway"]}]}],"canonical_facts":{"dc:contributor.sponsor":["na"],"dc:creator":["Hajiabady, Siavash"],"dc:date":["2014-07"],"dc:date.issued":["2014-07"],"dc:description.abstract":["A new model of energy storage has been created by using electrochemical batteries, which is helpful to analyse the possibility of using batteries for traction systems of DC railway. As a result, there are two opportunities of using batteries energy storage for traction system in DC railway: one is to build On-board applications for covering the discontinuous power supply over the gap; and the other is to build Stationary storage or track side application for recovering the braking energy used by batteries. This model can be used to identify the appropriate batteries for different applications."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/5076/1/Hajiabady14MRes.pdf","http://etheses.bham.ac.uk//id/eprint/5076/5/Decl_IS_Hajiabady14MRes.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Engineering, Department of Civil Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/5076/"],"dc:subject":["TF Railroad engineering and operation"],"dcterms:accessrights":["public","staffonly"],"dc:title":["Energy storage system for railway applications & analysis and modelling of electrochemical batteries for conductor rail gap DC railway"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["m_rs"],"dc:type.qualificationname":["m_rs"]},"updated_at":"2026-11-19T09:28:08Z"}