{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:5604"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:5604","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"TPM implementation in the UK and Libya","abstract":"Total productive maintenance is a programme for the fundamental improvement of maintenance functions within an organization involving its entire human resources. It can dramatically improve productivity and quality and reduce costs. This research aims to determine the critical success factors required for successfully implementing total productive maintenance. A review and survey will be conducted to fully investigate the elements of total productive maintenance, its benefits and drawbacks and also the data capture methodologies in industrial applications. The results will be statistically analyzed and data mining used to draw up a set of success factors related to both large and medium companies. Recommendations will be also be made on improving the implementation of total productive maintenance with particular regard to data capture and its analysis.","abstract_html":"Total productive maintenance is a programme for the fundamental improvement of maintenance functions within an organization involving its entire human resources. It can dramatically improve productivity and quality and reduce costs. This research aims to determine the critical success factors required for successfully implementing total productive maintenance. A review and survey will be conducted to fully investigate the elements of total productive maintenance, its benefits and drawbacks and also the data capture methodologies in industrial applications. The results will be statistically analyzed and data mining used to draw up a set of success factors related to both large and medium companies. Recommendations will be also be made on improving the implementation of total productive maintenance with particular regard to data capture and its analysis.","abstract_has_math":false,"creators":["Elgharib, Maged El-Mabruk"],"institution":"University of Birmingham","degree_name":"d_ph","degree_level":"d_ph","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-07","date_published":"2015-07","updated_at":"2026-11-19T09:28:31Z","subjects":["HD Industries. Land use. Labor"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/5604/1/Elgharib15PhD.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A5604","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["na"]},{"key":"dc:creator","label":"Author","values":["Elgharib, Maged El-Mabruk"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2015-07"]},{"key":"dc:date.issued","label":"Date","values":["2015-07"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Mechanical Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/5604/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["d_ph"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["d_ph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["HD Industries. Land use. Labor"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/5604/1/Elgharib15PhD.pdf","http://etheses.bham.ac.uk//id/eprint/5604/2/Decl_IS_Elgharib15PhD_Post_Embargo_B_2020.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Total productive maintenance is a programme for the fundamental improvement of maintenance functions within an organization involving its entire human resources. It can dramatically improve productivity and quality and reduce costs. This research aims to determine the critical success factors required for successfully implementing total productive maintenance. A review and survey will be conducted to fully investigate the elements of total productive maintenance, its benefits and drawbacks and also the data capture methodologies in industrial applications. The results will be statistically analyzed and data mining used to draw up a set of success factors related to both large and medium companies. Recommendations will be also be made on improving the implementation of total productive maintenance with particular regard to data capture and its analysis."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public","staffonly"]},{"key":"dc:title","label":"Title","values":["TPM implementation in the UK and Libya"]}]}],"canonical_facts":{"dc:contributor.sponsor":["na"],"dc:creator":["Elgharib, Maged El-Mabruk"],"dc:date":["2015-07"],"dc:date.issued":["2015-07"],"dc:description.abstract":["Total productive maintenance is a programme for the fundamental improvement of maintenance functions within an organization involving its entire human resources. It can dramatically improve productivity and quality and reduce costs. This research aims to determine the critical success factors required for successfully implementing total productive maintenance. A review and survey will be conducted to fully investigate the elements of total productive maintenance, its benefits and drawbacks and also the data capture methodologies in industrial applications. The results will be statistically analyzed and data mining used to draw up a set of success factors related to both large and medium companies. Recommendations will be also be made on improving the implementation of total productive maintenance with particular regard to data capture and its analysis."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/5604/1/Elgharib15PhD.pdf","http://etheses.bham.ac.uk//id/eprint/5604/2/Decl_IS_Elgharib15PhD_Post_Embargo_B_2020.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Mechanical Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/5604/"],"dc:subject":["HD Industries. Land use. Labor"],"dcterms:accessrights":["public","staffonly"],"dc:title":["TPM implementation in the UK and Libya"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["d_ph"],"dc:type.qualificationname":["d_ph"]},"updated_at":"2026-11-19T09:28:31Z"}