{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:6738"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:6738","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"Transmission expansion planning and unit commitment with large-scale integration of wind power","abstract":"The large-scale integration of wind generation into the power system brings great challenges to transmission expansion planning (TEP) and unit commitment (UC). The intermittence nature of wind generation needs to be fully considered in these two problems, which stimulates the research of this thesis. The selection of candidate lines is the prerequisite for the TEP problem. Considering the limitations of manual selection approach, a method to select candidate lines automatically is proposed, which consists of five stages to reinforce existing corridors and new corridors. Results of the two test systems illustrate that the locational marginal price difference is neither sufficient nor necessary condition for candidate lines. The uncertainty of load demand and wind power is studied both in the TEP and UC problems. In the term of TEP, a two-stage stochastic formulation of TEP is proposed. The stochastic dual dynamic programming (SDDP) approach is applied to consider the uncertainty, and the whole model is solved by Benders decomposition (BD) technique. In the term of UC, the chance-constrained two-stage programming formulation is proposed for the day-ahead UC problem. The chance-constrained stochastic programming formulation is converted into an equivalent deterministic formulation by a sequence of approximation and verification.","abstract_html":"The large-scale integration of wind generation into the power system brings great challenges to transmission expansion planning (TEP) and unit commitment (UC). The intermittence nature of wind generation needs to be fully considered in these two problems, which stimulates the research of this thesis. The selection of candidate lines is the prerequisite for the TEP problem. Considering the limitations of manual selection approach, a method to select candidate lines automatically is proposed, which consists of five stages to reinforce existing corridors and new corridors. Results of the two test systems illustrate that the locational marginal price difference is neither sufficient nor necessary condition for candidate lines. The uncertainty of load demand and wind power is studied both in the TEP and UC problems. In the term of TEP, a two-stage stochastic formulation of TEP is proposed. The stochastic dual dynamic programming (SDDP) approach is applied to consider the uncertainty, and the whole model is solved by Benders decomposition (BD) technique. In the term of UC, the chance-constrained two-stage programming formulation is proposed for the day-ahead UC problem. The chance-constrained stochastic programming formulation is converted into an equivalent deterministic formulation by a sequence of approximation and verification.","abstract_has_math":false,"creators":["Wu, Zhi"],"institution":"University of Birmingham","degree_name":"d_ph","degree_level":"d_ph","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2016,"date_issued":"2016-07","date_published":"2016-07","updated_at":"2026-11-19T09:29:00Z","subjects":["TK Electrical engineering. Electronics Nuclear engineering"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/6738/1/Wu16PhD.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A6738","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["other"]},{"key":"dc:creator","label":"Author","values":["Wu, Zhi"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2016-07"]},{"key":"dc:date.issued","label":"Date","values":["2016-07"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/6738/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["d_ph"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["d_ph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["TK Electrical engineering. Electronics Nuclear engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/6738/1/Wu16PhD.pdf","http://etheses.bham.ac.uk//id/eprint/6738/2/Decl_IS_Wu16PhD.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The large-scale integration of wind generation into the power system brings great challenges to transmission expansion planning (TEP) and unit commitment (UC). The intermittence nature of wind generation needs to be fully considered in these two problems, which stimulates the research of this thesis. The selection of candidate lines is the prerequisite for the TEP problem. Considering the limitations of manual selection approach, a method to select candidate lines automatically is proposed, which consists of five stages to reinforce existing corridors and new corridors. Results of the two test systems illustrate that the locational marginal price difference is neither sufficient nor necessary condition for candidate lines. The uncertainty of load demand and wind power is studied both in the TEP and UC problems. In the term of TEP, a two-stage stochastic formulation of TEP is proposed. The stochastic dual dynamic programming (SDDP) approach is applied to consider the uncertainty, and the whole model is solved by Benders decomposition (BD) technique. In the term of UC, the chance-constrained two-stage programming formulation is proposed for the day-ahead UC problem. The chance-constrained stochastic programming formulation is converted into an equivalent deterministic formulation by a sequence of approximation and verification."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public","staffonly"]},{"key":"dc:title","label":"Title","values":["Transmission expansion planning and unit commitment with large-scale integration of wind power"]}]}],"canonical_facts":{"dc:contributor.sponsor":["other"],"dc:creator":["Wu, Zhi"],"dc:date":["2016-07"],"dc:date.issued":["2016-07"],"dc:description.abstract":["The large-scale integration of wind generation into the power system brings great challenges to transmission expansion planning (TEP) and unit commitment (UC). The intermittence nature of wind generation needs to be fully considered in these two problems, which stimulates the research of this thesis. The selection of candidate lines is the prerequisite for the TEP problem. Considering the limitations of manual selection approach, a method to select candidate lines automatically is proposed, which consists of five stages to reinforce existing corridors and new corridors. Results of the two test systems illustrate that the locational marginal price difference is neither sufficient nor necessary condition for candidate lines. The uncertainty of load demand and wind power is studied both in the TEP and UC problems. In the term of TEP, a two-stage stochastic formulation of TEP is proposed. The stochastic dual dynamic programming (SDDP) approach is applied to consider the uncertainty, and the whole model is solved by Benders decomposition (BD) technique. In the term of UC, the chance-constrained two-stage programming formulation is proposed for the day-ahead UC problem. The chance-constrained stochastic programming formulation is converted into an equivalent deterministic formulation by a sequence of approximation and verification."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/6738/1/Wu16PhD.pdf","http://etheses.bham.ac.uk//id/eprint/6738/2/Decl_IS_Wu16PhD.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/6738/"],"dc:subject":["TK Electrical engineering. Electronics Nuclear engineering"],"dcterms:accessrights":["public","staffonly"],"dc:title":["Transmission expansion planning and unit commitment with large-scale integration of wind power"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["d_ph"],"dc:type.qualificationname":["d_ph"]},"updated_at":"2026-11-19T09:29:00Z"}