{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:7348"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:7348","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"Automation of railway switch and crossing inspection","abstract":"In recent years there has been an increase in railway usage which led to reduced time for rail maintenance. Railway switches and crossings (S&C) are an important asset and they typically account for 30% of the total budget spent on maintenance. The first part of this work researches the feasibility of automatically inspecting S&Cs in accordance with Network Rail inspection requirements and the likely necessary advancements. Current S&C inspection requirements, as well as current and developing inspection solutions, were analysed and categorised. This revealed the required technological advances and likely changes that the railway will have to adopt. The second part of the work researches the weakness of conventional S&C profile inspection practices used in industry. The work identified the main reasons that can lead to poor traditional inspection of the S&C profile, developed a novel, automatic method to carry out the profile measurements which eliminated human error and identified possible improvements in the area of S&C profile inspection. During this research, an inspection trolley was prototyped, field trials were carried out, and good results were obtained.","abstract_html":"In recent years there has been an increase in railway usage which led to reduced time for rail maintenance. Railway switches and crossings (S&amp;C) are an important asset and they typically account for 30% of the total budget spent on maintenance. The first part of this work researches the feasibility of automatically inspecting S&amp;Cs in accordance with Network Rail inspection requirements and the likely necessary advancements. Current S&amp;C inspection requirements, as well as current and developing inspection solutions, were analysed and categorised. This revealed the required technological advances and likely changes that the railway will have to adopt. The second part of the work researches the weakness of conventional S&amp;C profile inspection practices used in industry. The work identified the main reasons that can lead to poor traditional inspection of the S&amp;C profile, developed a novel, automatic method to carry out the profile measurements which eliminated human error and identified possible improvements in the area of S&amp;C profile inspection. During this research, an inspection trolley was prototyped, field trials were carried out, and good results were obtained.","abstract_has_math":false,"creators":["Rusu, Marius Florin"],"institution":"University of Birmingham","degree_name":"d_ph","degree_level":"d_ph","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-12","date_published":"2017-12","updated_at":"2026-11-19T09:29:17Z","subjects":["TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/7348/1/Rusu17PhD.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A7348","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["na"]},{"key":"dc:creator","label":"Author","values":["Rusu, Marius Florin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2017-12"]},{"key":"dc:date.issued","label":"Date","values":["2017-12"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/7348/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["d_ph"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["d_ph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/7348/1/Rusu17PhD.pdf","http://etheses.bham.ac.uk//id/eprint/7348/2/Decl_IS_Rusu17PhD.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In recent years there has been an increase in railway usage which led to reduced time for rail maintenance. Railway switches and crossings (S&C) are an important asset and they typically account for 30% of the total budget spent on maintenance. The first part of this work researches the feasibility of automatically inspecting S&Cs in accordance with Network Rail inspection requirements and the likely necessary advancements. Current S&C inspection requirements, as well as current and developing inspection solutions, were analysed and categorised. This revealed the required technological advances and likely changes that the railway will have to adopt. The second part of the work researches the weakness of conventional S&C profile inspection practices used in industry. The work identified the main reasons that can lead to poor traditional inspection of the S&C profile, developed a novel, automatic method to carry out the profile measurements which eliminated human error and identified possible improvements in the area of S&C profile inspection. During this research, an inspection trolley was prototyped, field trials were carried out, and good results were obtained."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public","staffonly"]},{"key":"dc:title","label":"Title","values":["Automation of railway switch and crossing inspection"]}]}],"canonical_facts":{"dc:contributor.sponsor":["na"],"dc:creator":["Rusu, Marius Florin"],"dc:date":["2017-12"],"dc:date.issued":["2017-12"],"dc:description.abstract":["In recent years there has been an increase in railway usage which led to reduced time for rail maintenance. Railway switches and crossings (S&C) are an important asset and they typically account for 30% of the total budget spent on maintenance. The first part of this work researches the feasibility of automatically inspecting S&Cs in accordance with Network Rail inspection requirements and the likely necessary advancements. Current S&C inspection requirements, as well as current and developing inspection solutions, were analysed and categorised. This revealed the required technological advances and likely changes that the railway will have to adopt. The second part of the work researches the weakness of conventional S&C profile inspection practices used in industry. The work identified the main reasons that can lead to poor traditional inspection of the S&C profile, developed a novel, automatic method to carry out the profile measurements which eliminated human error and identified possible improvements in the area of S&C profile inspection. During this research, an inspection trolley was prototyped, field trials were carried out, and good results were obtained."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/7348/1/Rusu17PhD.pdf","http://etheses.bham.ac.uk//id/eprint/7348/2/Decl_IS_Rusu17PhD.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/7348/"],"dc:subject":["TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"],"dcterms:accessrights":["public","staffonly"],"dc:title":["Automation of railway switch and crossing inspection"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["d_ph"],"dc:type.qualificationname":["d_ph"]},"updated_at":"2026-11-19T09:29:17Z"}