{"id":{"repo_id":"birmingham","oai_identifier":"oai:etheses.bham.ac.uk:7478"},"canonical_url":"https://search.ndltd.org/etd/birmingham/oai:etheses.bham.ac.uk:7478","repository":{"repo_id":"birmingham","name":"University of Birmingham","base_url":"https://etheses.bham.ac.uk/cgi/oai2"},"display":{"title":"Reducing land take and energy use of high-speed railways through the robust design of operations","abstract":"I address the problem of the high capital cost of high-speed railways and the need to reduce their energy use through the design of robust operations at the planning stage. Given the cost structure and benefits of different solutions, reducing the size of termini and maintaining robust operations in and near the termini is identified as a promising option for cost reduction. Two methodologies from manufacturing industry, namely, the Lean principle for cost reduction and the Taguchi method for robust design, are confirmed as suitable tools to realise the objective of improving the design of high-speed railways. I developed a novel approach that combines Lean and Taguchi techniques to deal with characteristic features of high-speed railways, such as the severe requirement for robust operations. Finally, the worth of the combined approach has been demonstrated by means of case studies of current British conventional railway practice, current Japanese high-speed railway operations and the planned High Speed Two (HS2) line. The latter work has shown the possibility of a reduction in the proposed number of platforms at Euston Station, the main terminus of HS2 in London, as well as energy saving for traction.","abstract_html":"I address the problem of the high capital cost of high-speed railways and the need to reduce their energy use through the design of robust operations at the planning stage. Given the cost structure and benefits of different solutions, reducing the size of termini and maintaining robust operations in and near the termini is identified as a promising option for cost reduction. Two methodologies from manufacturing industry, namely, the Lean principle for cost reduction and the Taguchi method for robust design, are confirmed as suitable tools to realise the objective of improving the design of high-speed railways. I developed a novel approach that combines Lean and Taguchi techniques to deal with characteristic features of high-speed railways, such as the severe requirement for robust operations. Finally, the worth of the combined approach has been demonstrated by means of case studies of current British conventional railway practice, current Japanese high-speed railway operations and the planned High Speed Two (HS2) line. The latter work has shown the possibility of a reduction in the proposed number of platforms at Euston Station, the main terminus of HS2 in London, as well as energy saving for traction.","abstract_has_math":false,"creators":["Hasegawa, Daisuke"],"institution":"University of Birmingham","degree_name":"d_ph","degree_level":"d_ph","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-07","date_published":"2017-07","updated_at":"2026-11-19T09:29:25Z","subjects":["TD Environmental technology. Sanitary engineering","TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"http://etheses.bham.ac.uk//id/eprint/7478/1/Hasegawa17PhD.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.bham.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.bham.ac.uk%3A7478","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["na"]},{"key":"dc:creator","label":"Author","values":["Hasegawa, Daisuke"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2017-07"]},{"key":"dc:date.issued","label":"Date","values":["2017-07"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Birmingham"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["http://etheses.bham.ac.uk//id/eprint/7478/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["d_ph"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["d_ph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["TD Environmental technology. Sanitary engineering","TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://etheses.bham.ac.uk//id/eprint/7478/1/Hasegawa17PhD.pdf","http://etheses.bham.ac.uk//id/eprint/7478/2/Decl_IS_Hasegawa17PhD.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["I address the problem of the high capital cost of high-speed railways and the need to reduce their energy use through the design of robust operations at the planning stage. Given the cost structure and benefits of different solutions, reducing the size of termini and maintaining robust operations in and near the termini is identified as a promising option for cost reduction. Two methodologies from manufacturing industry, namely, the Lean principle for cost reduction and the Taguchi method for robust design, are confirmed as suitable tools to realise the objective of improving the design of high-speed railways. I developed a novel approach that combines Lean and Taguchi techniques to deal with characteristic features of high-speed railways, such as the severe requirement for robust operations. Finally, the worth of the combined approach has been demonstrated by means of case studies of current British conventional railway practice, current Japanese high-speed railway operations and the planned High Speed Two (HS2) line. The latter work has shown the possibility of a reduction in the proposed number of platforms at Euston Station, the main terminus of HS2 in London, as well as energy saving for traction."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public","staffonly"]},{"key":"dc:title","label":"Title","values":["Reducing land take and energy use of high-speed railways through the robust design of operations"]}]}],"canonical_facts":{"dc:contributor.sponsor":["na"],"dc:creator":["Hasegawa, Daisuke"],"dc:date":["2017-07"],"dc:date.issued":["2017-07"],"dc:description.abstract":["I address the problem of the high capital cost of high-speed railways and the need to reduce their energy use through the design of robust operations at the planning stage. Given the cost structure and benefits of different solutions, reducing the size of termini and maintaining robust operations in and near the termini is identified as a promising option for cost reduction. Two methodologies from manufacturing industry, namely, the Lean principle for cost reduction and the Taguchi method for robust design, are confirmed as suitable tools to realise the objective of improving the design of high-speed railways. I developed a novel approach that combines Lean and Taguchi techniques to deal with characteristic features of high-speed railways, such as the severe requirement for robust operations. Finally, the worth of the combined approach has been demonstrated by means of case studies of current British conventional railway practice, current Japanese high-speed railway operations and the planned High Speed Two (HS2) line. The latter work has shown the possibility of a reduction in the proposed number of platforms at Euston Station, the main terminus of HS2 in London, as well as energy saving for traction."],"dc:format":["application/pdf"],"dc:identifier.uri":["http://etheses.bham.ac.uk//id/eprint/7478/1/Hasegawa17PhD.pdf","http://etheses.bham.ac.uk//id/eprint/7478/2/Decl_IS_Hasegawa17PhD.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["College of Engineering & Physical Sciences","School of Engineering, Department of Electronic, Electrical and Systems Engineering"],"dc:publisher.institution":["University of Birmingham"],"dc:relation.isreferencedby":["http://etheses.bham.ac.uk//id/eprint/7478/"],"dc:subject":["TD Environmental technology. Sanitary engineering","TF Railroad engineering and operation","TK Electrical engineering. Electronics Nuclear engineering"],"dcterms:accessrights":["public","staffonly"],"dc:title":["Reducing land take and energy use of high-speed railways through the robust design of operations"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["d_ph"],"dc:type.qualificationname":["d_ph"]},"updated_at":"2026-11-19T09:29:25Z"}