{"id":{"repo_id":"botswana","oai_identifier":"oai:ubrisa.ub.bw:10311/1445"},"canonical_url":"https://search.ndltd.org/etd/botswana/oai:ubrisa.ub.bw:10311/1445","repository":{"repo_id":"botswana","name":"University Botswana","base_url":"https://ubrisa.ub.bw/oai/request"},"display":{"title":"Factors impacting implementation of projects in Botswana","abstract":"This dissertation reports on a research that continues a long tradition of exploration of factors which positively influence implementation of projects. The research was based in Botswana and the empirical survey only covered project personnel employed by Botswana based organisations. The dissertation investigates and identifies the factors and goes further to analyse these factors to determine if their importance is perceived differently across private and public sectors. A literature review was carried out to identify the factors and find out what various scholarly authors have deduced about them. The presumption was then compared with the results of the survey, both of which revealed that all factors identified were crucial for project success even though some factors were deemed more important than others. The research has also shown that in both private and public sectors, it is important that management attention should be more productively focused on creating the kind of organisational environment or culture that has been shown to be conducive to successful project outcomes.","abstract_html":"This dissertation reports on a research that continues a long tradition of exploration of factors which positively influence implementation of projects. The research was based in Botswana and the empirical survey only covered project personnel employed by Botswana based organisations. The dissertation investigates and identifies the factors and goes further to analyse these factors to determine if their importance is perceived differently across private and public sectors. A literature review was carried out to identify the factors and find out what various scholarly authors have deduced about them. The presumption was then compared with the results of the survey, both of which revealed that all factors identified were crucial for project success even though some factors were deemed more important than others. The research has also shown that in both private and public sectors, it is important that management attention should be more productively focused on creating the kind of organisational environment or culture that has been shown to be conducive to successful project outcomes.","abstract_has_math":false,"creators":["Kgatlwane, Thato Thandie"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2016,"date_issued":"2016-07-14","date_published":"2016-07-14","updated_at":"2026-11-19T17:38:33Z","subjects":["Project implementation","Private and public sectors","Botswana"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10311/1445","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10311/1445","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Abotswana%3Aoai%3Aubrisa.ub.bw%3A10311%2F1445","prefix":"oai_dc"},"source_record":{"url":"https://ubrisa.ub.bw/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aubrisa.ub.bw%3A10311%2F1445","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Kgatlwane, Thato Thandie"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-07-14T07:38:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-07-14T07:38:11Z"]},{"key":"dc:date.issued","label":"Date","values":["2016-07-14"]},{"key":"dc:type","label":"Dc Type","values":["Masters Thesis/Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Project implementation","Private and public sectors","Botswana"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10311/1445"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["A dissertation submitted to the Graduate School of Business, Faculty of Business, University of Botswana in partial fulfilment of the requirements of the degree of Master of Business and Administration, Citation: Kgatlwane, Thato T. (2014) Factors impacting implementation of projects in Botswana, University of Botswana."]},{"key":"dc:description.abstract","label":"Abstract","values":["This dissertation reports on a research that continues a long tradition of exploration of factors which positively influence implementation of projects. The research was based in Botswana and the empirical survey only covered project personnel employed by Botswana based organisations. The dissertation investigates and identifies the factors and goes further to analyse these factors to determine if their importance is perceived differently across private and public sectors. A literature review was carried out to identify the factors and find out what various scholarly authors have deduced about them. The presumption was then compared with the results of the survey, both of which revealed that all factors identified were crucial for project success even though some factors were deemed more important than others. The research has also shown that in both private and public sectors, it is important that management attention should be more productively focused on creating the kind of organisational environment or culture that has been shown to be conducive to successful project outcomes."]},{"key":"dc:description.provenance","label":"Dc Description Provenance","values":["Submitted by Isaac Thothe (thotheim@mopipi.ub.bw) on 2016-06-28T09:23:24Z No. of bitstreams: 1 Kgatlwane_MBA_2014.pdf: 7604905 bytes, checksum: a41e4c4a62ce312d83614276c03f034b (MD5)","Rejected by Leah FKiKTqUfrhQ (rakgamanyane@mopipi.ub.bw), reason: As per the same reason on 2016-06-30T12:17:44Z (GMT)","Submitted by Isaac Thothe (thotheim@mopipi.ub.bw) on 2016-07-04T08:19:14Z No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)","Approved for entry into archive by Leah FKiKTqUfrhQ (rakgamanyane@mopipi.ub.bw) on 2016-07-14T07:38:11Z (GMT) No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)","Made available in DSpace on 2016-07-14T07:38:11Z (GMT). No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)"]},{"key":"dc:title","label":"Title","values":["Factors impacting implementation of projects in Botswana"]}]}],"canonical_facts":{"dc:creator":["Kgatlwane, Thato Thandie"],"dc:date.accessioned":["2016-07-14T07:38:11Z"],"dc:date.available":["2016-07-14T07:38:11Z"],"dc:date.issued":["2016-07-14"],"dc:description":["A dissertation submitted to the Graduate School of Business, Faculty of Business, University of Botswana in partial fulfilment of the requirements of the degree of Master of Business and Administration, Citation: Kgatlwane, Thato T. (2014) Factors impacting implementation of projects in Botswana, University of Botswana."],"dc:description.abstract":["This dissertation reports on a research that continues a long tradition of exploration of factors which positively influence implementation of projects. The research was based in Botswana and the empirical survey only covered project personnel employed by Botswana based organisations. The dissertation investigates and identifies the factors and goes further to analyse these factors to determine if their importance is perceived differently across private and public sectors. A literature review was carried out to identify the factors and find out what various scholarly authors have deduced about them. The presumption was then compared with the results of the survey, both of which revealed that all factors identified were crucial for project success even though some factors were deemed more important than others. The research has also shown that in both private and public sectors, it is important that management attention should be more productively focused on creating the kind of organisational environment or culture that has been shown to be conducive to successful project outcomes."],"dc:description.provenance":["Submitted by Isaac Thothe (thotheim@mopipi.ub.bw) on 2016-06-28T09:23:24Z No. of bitstreams: 1 Kgatlwane_MBA_2014.pdf: 7604905 bytes, checksum: a41e4c4a62ce312d83614276c03f034b (MD5)","Rejected by Leah FKiKTqUfrhQ (rakgamanyane@mopipi.ub.bw), reason: As per the same reason on 2016-06-30T12:17:44Z (GMT)","Submitted by Isaac Thothe (thotheim@mopipi.ub.bw) on 2016-07-04T08:19:14Z No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)","Approved for entry into archive by Leah FKiKTqUfrhQ (rakgamanyane@mopipi.ub.bw) on 2016-07-14T07:38:11Z (GMT) No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)","Made available in DSpace on 2016-07-14T07:38:11Z (GMT). No. of bitstreams: 1 Kgatlwane_Unpublished (MBA)_2014.pdf: 7604980 bytes, checksum: bdac9bced300f3be647cabd1e3e8d3a9 (MD5)"],"dc:identifier.uri":["http://hdl.handle.net/10311/1445"],"dc:language.iso":["en"],"dc:subject":["Project implementation","Private and public sectors","Botswana"],"dc:title":["Factors impacting implementation of projects in Botswana"],"dc:type":["Masters Thesis/Dissertation"]},"updated_at":"2026-11-19T17:38:33Z"}