{"id":{"repo_id":"brno-tech","oai_identifier":"oai:dspace.vut.cz:11012/244880"},"canonical_url":"https://search.ndltd.org/etd/brno-tech/oai:dspace.vut.cz:11012/244880","repository":{"repo_id":"brno-tech","name":"Brno University of Technology","base_url":"https://dspace.vut.cz/oai/request"},"display":{"title":"Příprava realizace parkovacího domu v Ostravě","abstract":"Predmetom tejto diplomovej práce je vypracovanie stavebne technologického projektu realizácie viacpodlažného parkovacieho domu v ZOO Ostrava. Obsahom tejto práce je technická správa, koordinačná situácia so širšími dopravnými vzťahmi, časový a finančný plán objektu, štúdia realizácie hlavných technologických etáp, riešenie projektu zariadenia staveniska vrátane výkresovej časti, návrh hlavných stavebných strojov a mechanizmov, technologický predpis pre pažiacu pilotovaciu stenu a základovú železobetónovú patku, kontrólny a skúšobný plán pre realizáciu pažiacej pilotovacej steny, položkový rozpočet pažiacej pilotovacej steny a hrubej stavby, časový a finančný plán hrubej stavby, certifikát LEED, plán BOZP a hluková štúdia počas realizácie pažicej pilotovacej steny.","abstract_html":"Predmetom tejto diplomovej práce je vypracovanie stavebne technologického projektu realizácie viacpodlažného parkovacieho domu v ZOO Ostrava. Obsahom tejto práce je technická správa, koordinačná situácia so širšími dopravnými vzťahmi, časový a finančný plán objektu, štúdia realizácie hlavných technologických etáp, riešenie projektu zariadenia staveniska vrátane výkresovej časti, návrh hlavných stavebných strojov a mechanizmov, technologický predpis pre pažiacu pilotovaciu stenu a základovú železobetónovú patku, kontrólny a skúšobný plán pre realizáciu pažiacej pilotovacej steny, položkový rozpočet pažiacej pilotovacej steny a hrubej stavby, časový a finančný plán hrubej stavby, certifikát LEED, plán BOZP a hluková štúdia počas realizácie pažicej pilotovacej steny.","abstract_has_math":false,"creators":["Peterková, Marta"],"institution":"Vysoké učení technické v Brně. Fakulta stavební","degree_name":null,"degree_level":"Inženýrský","degree_discipline":"bez specializace","degree_department":null,"school":null,"contributors":[],"advisors":["Vlčková, Jitka Laura"],"committee_chairs":[],"committee_members":["Diaz, Yvetta","prof. Ing. Mária Kozlovská, CSc. (předseda) Ing. et Ing. Barbora Nečasová, Ph.D. (místopředseda) Ing. Yvetta Diaz, Ph.D. (člen) Ing. Radim Smolka, Ph.D. (člen) doc. Ing. Radka Kantová, Ph.D. (člen)"],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T03:21:17Z","subjects":["Parkovací dom","prefabrikovaný skelet","pažiaca pilotová stena","pilóty","hrubá stavba","stavebné stroje","technologický predpis","zariadenie staveniska","The subject of this diploma thesis is processing of construction technological project for the preparation of the realization of a parking garage in Ostrava. The thesis is based on construction technology solution. The content of the thesis is a technical report","coordination situation broader transport realations","time and financial plan","study of realization of technological stages","solution of construction organization","design of main main construction machines","technological regulation for a bored pile wall and reinforced concrete footing","control and testing plan for a bored pile wall","time and financial plan of the rough construction","LEED certificate","health and safety plan and noise study during the irealization of bored pile wall."],"languages":["sk","slovenština (Slovak)"],"rights":["Standardní licenční smlouva - přístup k plnému textu bez omezení"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["PETERKOVÁ, M. Příprava realizace parkovacího domu v Ostravě [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2024."],"render_values":[{"text":"PETERKOVÁ, M. Příprava realizace parkovacího domu v Ostravě [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2024.","href":null,"code":true}]},{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["152589"],"render_values":[{"text":"152589","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/11012/244880","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/11012/244880","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Abrno-tech%3Aoai%3Adspace.vut.cz%3A11012%2F244880","prefix":"oai_dc"},"source_record":{"url":"https://dspace.vut.cz/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.vut.cz%3A11012%2F244880","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Vlčková, Jitka Laura"]},{"key":"dc:contributor.committee","label":"Committee Member","values":["prof. Ing. Mária Kozlovská, CSc. (předseda) Ing. et Ing. Barbora Nečasová, Ph.D. (místopředseda) Ing. Yvetta Diaz, Ph.D. (člen) Ing. Radim Smolka, Ph.D. (člen) doc. Ing. Radka Kantová, Ph.D. (člen)"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Diaz, Yvetta"]},{"key":"dc:creator","label":"Author","values":["Peterková, Marta"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.acceptance","label":"Dc Date Acceptance","values":["2024-02-01"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2024"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2024-02-02-10:49:06"]},{"key":"dc:publisher","label":"Institution","values":["Vysoké učení technické v Brně. Fakulta stavební"]},{"key":"dc:publisher.faculty","label":"Dc Publisher Faculty","values":["Fakulta stavební"]},{"key":"dc:type","label":"Dc Type","values":["Text","masterThesis","diplomová práce"]},{"key":"thesis:defence_status","label":"Thesis Defence Status","values":["práce byla úspěšně obhájena"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["bez specializace"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Inženýrský"]},{"key":"thesis:degree_program","label":"Thesis Degree Program","values":["Stavební inženýrství – realizace staveb"]},{"key":"thesis:examination_report","label":"Thesis Examination Report","values":["Studentka popsala komisi téma své DP a popsala jednotlivé části. Na dalším snímku popsala umístění stavby v Ostravě, základní informace o stavbě, kapacity stavby, odhadovanou cenu stavby. Na dalším snímku studentka představila půdorys stavby. Na dalším snímku popsala studentka trvalé pažení výkopové jámy. Na dalším snímku studentka popsala zařízení staveniště, návrh strojní sestavy a její dopravy. Reakce na dotazy oponenta: Studentka odpovídala na dotazy oponenta a všechny dotazy odpověděla a svoje řešení obhájila. Studentka například popsala hutnění kameniva pod podkladní beton, dále technologii hydroizolace základové konstrukce. Další dotaz byl položen na spojování střešních panelů a jejich betonáž. Studentka odpověděla váhavě. Další dotaz byl položen na vedlejší rozpočtové náklady a na jejich stanovení, studentka odpovídala s drobným zaváháním"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Ing.","Vysoké učení technické v Brně. Fakulta stavební. Ústav technologie, mechanizace a řízení staveb"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Parkovací dom","prefabrikovaný skelet","pažiaca pilotová stena","pilóty","hrubá stavba","stavebné stroje","technologický predpis","zariadenie staveniska","The subject of this diploma thesis is processing of construction technological project for the preparation of the realization of a parking garage in Ostrava. The thesis is based on construction technology solution. The content of the thesis is a technical report","coordination situation broader transport realations","time and financial plan","study of realization of technological stages","solution of construction organization","design of main main construction machines","technological regulation for a bored pile wall and reinforced concrete footing","control and testing plan for a bored pile wall","time and financial plan of the rough construction","LEED certificate","health and safety plan and noise study during the irealization of bored pile wall."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["slovenština (Slovak)"]},{"key":"dc:language.iso","label":"Language (ISO)","values":["sk"]},{"key":"dc:rights","label":"Dc Rights","values":["Standardní licenční smlouva - přístup k plnému textu bez omezení"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["PETERKOVÁ, M. Příprava realizace parkovacího domu v Ostravě [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2024."]},{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["152589"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11012/244880"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Predmetom tejto diplomovej práce je vypracovanie stavebne technologického projektu realizácie viacpodlažného parkovacieho domu v ZOO Ostrava. Obsahom tejto práce je technická správa, koordinačná situácia so širšími dopravnými vzťahmi, časový a finančný plán objektu, štúdia realizácie hlavných technologických etáp, riešenie projektu zariadenia staveniska vrátane výkresovej časti, návrh hlavných stavebných strojov a mechanizmov, technologický predpis pre pažiacu pilotovaciu stenu a základovú železobetónovú patku, kontrólny a skúšobný plán pre realizáciu pažiacej pilotovacej steny, položkový rozpočet pažiacej pilotovacej steny a hrubej stavby, časový a finančný plán hrubej stavby, certifikát LEED, plán BOZP a hluková štúdia počas realizácie pažicej pilotovacej steny.","Parking garage, prefabricated skeleton, bored pile wall, piles, rough upsite structure, construction machines, technological regulation, construction site equipment"]},{"key":"dc:description.grade","label":"Dc Description Grade","values":["A"]},{"key":"dc:title","label":"Title","values":["Příprava realizace parkovacího domu v Ostravě"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Preparation of the realization of a parking garage in Ostrava"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]},{"key":"sync:item.dbid","label":"Sync Item Dbid","values":["152589"]},{"key":"sync:item.dbtype","label":"Sync Item Dbtype","values":["ZP"]},{"key":"sync:item.insts","label":"Sync Item Insts","values":["2026.05.20 13:59:23"]},{"key":"sync:item.modts","label":"Sync Item Modts","values":["2026.05.15 15:55:18"]}]}],"canonical_facts":{"dc:contributor.advisor":["Vlčková, Jitka Laura"],"dc:contributor.committee":["prof. Ing. Mária Kozlovská, CSc. (předseda) Ing. et Ing. Barbora Nečasová, Ph.D. (místopředseda) Ing. Yvetta Diaz, Ph.D. (člen) Ing. Radim Smolka, Ph.D. (člen) doc. Ing. Radka Kantová, Ph.D. (člen)"],"dc:contributor.committeemember":["Diaz, Yvetta"],"dc:creator":["Peterková, Marta"],"dc:date.acceptance":["2024-02-01"],"dc:date.created":["2024"],"dc:date.updated":["2024-02-02-10:49:06"],"dc:description.abstract":["Predmetom tejto diplomovej práce je vypracovanie stavebne technologického projektu realizácie viacpodlažného parkovacieho domu v ZOO Ostrava. Obsahom tejto práce je technická správa, koordinačná situácia so širšími dopravnými vzťahmi, časový a finančný plán objektu, štúdia realizácie hlavných technologických etáp, riešenie projektu zariadenia staveniska vrátane výkresovej časti, návrh hlavných stavebných strojov a mechanizmov, technologický predpis pre pažiacu pilotovaciu stenu a základovú železobetónovú patku, kontrólny a skúšobný plán pre realizáciu pažiacej pilotovacej steny, položkový rozpočet pažiacej pilotovacej steny a hrubej stavby, časový a finančný plán hrubej stavby, certifikát LEED, plán BOZP a hluková štúdia počas realizácie pažicej pilotovacej steny.","Parking garage, prefabricated skeleton, bored pile wall, piles, rough upsite structure, construction machines, technological regulation, construction site equipment"],"dc:description.grade":["A"],"dc:identifier.citation":["PETERKOVÁ, M. Příprava realizace parkovacího domu v Ostravě [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2024."],"dc:identifier.other":["152589"],"dc:identifier.uri":["http://hdl.handle.net/11012/244880"],"dc:language":["slovenština (Slovak)"],"dc:language.iso":["sk"],"dc:publisher":["Vysoké učení technické v Brně. Fakulta stavební"],"dc:publisher.faculty":["Fakulta stavební"],"dc:rights":["Standardní licenční smlouva - přístup k plnému textu bez omezení"],"dc:subject":["Parkovací dom","prefabrikovaný skelet","pažiaca pilotová stena","pilóty","hrubá stavba","stavebné stroje","technologický predpis","zariadenie staveniska","The subject of this diploma thesis is processing of construction technological project for the preparation of the realization of a parking garage in Ostrava. The thesis is based on construction technology solution. The content of the thesis is a technical report","coordination situation broader transport realations","time and financial plan","study of realization of technological stages","solution of construction organization","design of main main construction machines","technological regulation for a bored pile wall and reinforced concrete footing","control and testing plan for a bored pile wall","time and financial plan of the rough construction","LEED certificate","health and safety plan and noise study during the irealization of bored pile wall."],"dc:title":["Příprava realizace parkovacího domu v Ostravě"],"dc:title.alternative":["Preparation of the realization of a parking garage in Ostrava"],"dc:type":["Text","masterThesis","diplomová práce"],"others:access_status":["open.access"],"sync:item.dbid":["152589"],"sync:item.dbtype":["ZP"],"sync:item.insts":["2026.05.20 13:59:23"],"sync:item.modts":["2026.05.15 15:55:18"],"thesis:defence_status":["práce byla úspěšně obhájena"],"thesis:degree_discipline":["bez specializace"],"thesis:degree_level":["Inženýrský"],"thesis:degree_program":["Stavební inženýrství – realizace staveb"],"thesis:examination_report":["Studentka popsala komisi téma své DP a popsala jednotlivé části. Na dalším snímku popsala umístění stavby v Ostravě, základní informace o stavbě, kapacity stavby, odhadovanou cenu stavby. Na dalším snímku studentka představila půdorys stavby. Na dalším snímku popsala studentka trvalé pažení výkopové jámy. Na dalším snímku studentka popsala zařízení staveniště, návrh strojní sestavy a její dopravy. Reakce na dotazy oponenta: Studentka odpovídala na dotazy oponenta a všechny dotazy odpověděla a svoje řešení obhájila. Studentka například popsala hutnění kameniva pod podkladní beton, dále technologii hydroizolace základové konstrukce. Další dotaz byl položen na spojování střešních panelů a jejich betonáž. Studentka odpověděla váhavě. Další dotaz byl položen na vedlejší rozpočtové náklady a na jejich stanovení, studentka odpovídala s drobným zaváháním"],"thesis:institution_name":["Ing.","Vysoké učení technické v Brně. Fakulta stavební. Ústav technologie, mechanizace a řízení staveb"]},"updated_at":"2026-11-19T03:21:17Z"}