{"id":{"repo_id":"bu","oai_identifier":"oai:open.bu.edu:2144/4156"},"canonical_url":"https://search.ndltd.org/etd/bu/oai:open.bu.edu:2144/4156","repository":{"repo_id":"bu","name":"Boston University","base_url":"https://open.bu.edu/oai/request"},"display":{"title":"The construction cycle, cause or effect of business activity?","abstract":"Three hypotheses may be advanced in regard to the relationship of the building or construction and the overall business cycle. The first is that the building cycle is an \"early mover,\" tends to \"lead\" business activity, and because of this, may be ascribed as being of the nature of a cause. A second is that the building cycle is a consequence of and directly linked to the rises and falls of business and is a function of the National Income. If this postulation be true, the building cycle would tend to \"lag\" and be of the nature of an effect. The third, following logically from the first two, is that if there is no cause or effect relationship between the two cycles, perhaps there is no connection at all and each may exert its characteristic movements, independently of the other. It is admitted that more propensities to \"lead\" and \"lag\" do not guarantee principles of causation nor effect, but if one cycle habitually proceeds or follows the other, at least a tendency toward these former principles may be deduced. Such reasoning provides the foundation of the thesis.","abstract_html":"Three hypotheses may be advanced in regard to the relationship of the building or construction and the overall business cycle. The first is that the building cycle is an &quot;early mover,&quot; tends to &quot;lead&quot; business activity, and because of this, may be ascribed as being of the nature of a cause. A second is that the building cycle is a consequence of and directly linked to the rises and falls of business and is a function of the National Income. If this postulation be true, the building cycle would tend to &quot;lag&quot; and be of the nature of an effect. The third, following logically from the first two, is that if there is no cause or effect relationship between the two cycles, perhaps there is no connection at all and each may exert its characteristic movements, independently of the other. It is admitted that more propensities to &quot;lead&quot; and &quot;lag&quot; do not guarantee principles of causation nor effect, but if one cycle habitually proceeds or follows the other, at least a tendency toward these former principles may be deduced. Such reasoning provides the foundation of the thesis.","abstract_has_math":false,"creators":["Ernst, Harry B."],"institution":"Boston University","degree_name":"Master of Arts","degree_level":"masters","degree_discipline":"Economics","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1951,"date_issued":"1951","date_published":"1951","updated_at":"2026-11-18T19:38:11Z","subjects":[],"languages":["en_US"],"rights":["Based on investigation of the BU Libraries' staff, this work is free of known copyright restrictions"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["b1473524"],"render_values":[{"text":"b1473524","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/2144/4156","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/2144/4156","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://open.bu.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aopen.bu.edu%3A2144%2F4156","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Ernst, Harry B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-09-06T18:39:57Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-09-06T18:39:57Z"]},{"key":"dc:date.issued","label":"Date","values":["1951"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["1951"]},{"key":"dc:publisher","label":"Institution","values":["Boston University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis/Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Economics"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Arts"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Boston University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["Based on investigation of the BU Libraries' staff, this work is free of known copyright restrictions"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["b1473524"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/2144/4156"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M.A.)--Boston University, 1951"]},{"key":"dc:description.abstract","label":"Abstract","values":["Three hypotheses may be advanced in regard to the relationship of the building or construction and the overall business cycle. The first is that the building cycle is an \"early mover,\" tends to \"lead\" business activity, and because of this, may be ascribed as being of the nature of a cause. A second is that the building cycle is a consequence of and directly linked to the rises and falls of business and is a function of the National Income. If this postulation be true, the building cycle would tend to \"lag\" and be of the nature of an effect. The third, following logically from the first two, is that if there is no cause or effect relationship between the two cycles, perhaps there is no connection at all and each may exert its characteristic movements, independently of the other. It is admitted that more propensities to \"lead\" and \"lag\" do not guarantee principles of causation nor effect, but if one cycle habitually proceeds or follows the other, at least a tendency toward these former principles may be deduced. Such reasoning provides the foundation of the thesis."]},{"key":"dc:title","label":"Title","values":["The construction cycle, cause or effect of business activity?"]}]}],"canonical_facts":{"dc:creator":["Ernst, Harry B."],"dc:date.accessioned":["2012-09-06T18:39:57Z"],"dc:date.available":["2012-09-06T18:39:57Z"],"dc:date.issued":["1951"],"dc:date.submitted":["1951"],"dc:description":["Thesis (M.A.)--Boston University, 1951"],"dc:description.abstract":["Three hypotheses may be advanced in regard to the relationship of the building or construction and the overall business cycle. The first is that the building cycle is an \"early mover,\" tends to \"lead\" business activity, and because of this, may be ascribed as being of the nature of a cause. A second is that the building cycle is a consequence of and directly linked to the rises and falls of business and is a function of the National Income. If this postulation be true, the building cycle would tend to \"lag\" and be of the nature of an effect. The third, following logically from the first two, is that if there is no cause or effect relationship between the two cycles, perhaps there is no connection at all and each may exert its characteristic movements, independently of the other. It is admitted that more propensities to \"lead\" and \"lag\" do not guarantee principles of causation nor effect, but if one cycle habitually proceeds or follows the other, at least a tendency toward these former principles may be deduced. Such reasoning provides the foundation of the thesis."],"dc:identifier.other":["b1473524"],"dc:identifier.uri":["https://hdl.handle.net/2144/4156"],"dc:language.iso":["en_US"],"dc:publisher":["Boston University"],"dc:rights":["Based on investigation of the BU Libraries' staff, this work is free of known copyright restrictions"],"dc:title":["The construction cycle, cause or effect of business activity?"],"dc:type":["Thesis/Dissertation"],"thesis:degree_discipline":["Economics"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Arts"],"thesis:institution_name":["Boston University"]},"updated_at":"2026-11-18T19:38:11Z"}