{"id":{"repo_id":"buffalo","oai_identifier":"oai:ubir.buffalo.edu:10477/87629"},"canonical_url":"https://search.ndltd.org/etd/buffalo/oai:ubir.buffalo.edu:10477/87629","repository":{"repo_id":"buffalo","name":"Buffalo","base_url":"https://ubir.buffalo.edu/oai/request"},"display":{"title":"Prediction Intervals of Railway Tie Deterioration","abstract":"The railroad industry is one primary transportation field, which relies highly on its vast track network. Tie is an essential part of a railway track that holds the rail upright and keeps the railway tracks equally spaced to the correct gauge. This thesis aims to develop a data-driven Railway Tie Deterioration prediction model based on machine learning techniques. We collected a 4-year railway track tie dataset containing the different factors affecting tie failure for each milepost. Initially, the tie deterioration rate was calculated using the number of good tie and the tie installation data. We separated our dataset into training and test dataset based on year. Three models, Random Forest, XGBoost, Multilayer Perceptron, were applied for the point estimation. In order to tackle the model's uncertainty and make a robust decision-making prediction model, prediction intervals are constructed using the bootstrap method. Tie deterioration prediction model will help estimate the number of good ties and bad ties milepost wise, which helps in tie replacement decision-making. Based on the best model, we got nearly the 88% efficiency of MLP model for point estimation and 84% for prediction intervals. This thesis will help in the decision making of railway tie preventive maintenance.","abstract_html":"The railroad industry is one primary transportation field, which relies highly on its vast track network. Tie is an essential part of a railway track that holds the rail upright and keeps the railway tracks equally spaced to the correct gauge. This thesis aims to develop a data-driven Railway Tie Deterioration prediction model based on machine learning techniques. We collected a 4-year railway track tie dataset containing the different factors affecting tie failure for each milepost. Initially, the tie deterioration rate was calculated using the number of good tie and the tie installation data. We separated our dataset into training and test dataset based on year. Three models, Random Forest, XGBoost, Multilayer Perceptron, were applied for the point estimation. In order to tackle the model&#x27;s uncertainty and make a robust decision-making prediction model, prediction intervals are constructed using the bootstrap method. Tie deterioration prediction model will help estimate the number of good ties and bad ties milepost wise, which helps in tie replacement decision-making. Based on the best model, we got nearly the 88% efficiency of MLP model for point estimation and 84% for prediction intervals. This thesis will help in the decision making of railway tie preventive maintenance.","abstract_has_math":false,"creators":["Dobhal, Madhur"],"institution":"State University of New York at Buffalo","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["He, Qing","Industrial and Systems Engineering"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2021,"date_issued":"2021","date_published":"2021","updated_at":"2026-11-19T07:10:04Z","subjects":["industrial engineering","operations research"],"languages":["eng"],"rights":["Copyright retained by author.","Users of works found in University at Buffalo Institutional Repository (UBIR) are responsible for identifying and contacting the copyright owner for permission to reuse. University at Buffalo Libraries do not manage rights for copyright-protected works and cannot assist with permissions."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10477/87629","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"https://hdl.handle.net/10477/87629","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Abuffalo%3Aoai%3Aubir.buffalo.edu%3A10477%2F87629","prefix":"oai_dc"},"source_record":{"url":"https://ubir.buffalo.edu/oai/request?verb=GetRecord&metadataPrefix=qdc&identifier=oai%3Aubir.buffalo.edu%3A10477%2F87629","prefix":"qdc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["He, Qing","Industrial and Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Dobhal, Madhur"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2025-06-09T15:17:09Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-06-09T15:17:09Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2025-06-09T15:17:09Z"]},{"key":"dc:date.issued","label":"Date","values":["2021"]},{"key":"dc:publisher","label":"Institution","values":["State University of New York at Buffalo"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["industrial engineering","operations research"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["Copyright retained by author.","Users of works found in University at Buffalo Institutional Repository (UBIR) are responsible for identifying and contacting the copyright owner for permission to reuse. University at Buffalo Libraries do not manage rights for copyright-protected works and cannot assist with permissions."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/10477/87629"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The railroad industry is one primary transportation field, which relies highly on its vast track network. Tie is an essential part of a railway track that holds the rail upright and keeps the railway tracks equally spaced to the correct gauge. This thesis aims to develop a data-driven Railway Tie Deterioration prediction model based on machine learning techniques. We collected a 4-year railway track tie dataset containing the different factors affecting tie failure for each milepost. Initially, the tie deterioration rate was calculated using the number of good tie and the tie installation data. We separated our dataset into training and test dataset based on year. Three models, Random Forest, XGBoost, Multilayer Perceptron, were applied for the point estimation. In order to tackle the model's uncertainty and make a robust decision-making prediction model, prediction intervals are constructed using the bootstrap method. Tie deterioration prediction model will help estimate the number of good ties and bad ties milepost wise, which helps in tie replacement decision-making. Based on the best model, we got nearly the 88% efficiency of MLP model for point estimation and 84% for prediction intervals. This thesis will help in the decision making of railway tie preventive maintenance.","**To request an accessible version of the file(s) associated with this item, contact library@buffalo.edu. Please include the item's persistent URL [http://hdl.handle.net/. . .] in your request.**"]},{"key":"dc:title","label":"Title","values":["Prediction Intervals of Railway Tie Deterioration"]}]}],"canonical_facts":{"dc:contributor":["He, Qing","Industrial and Systems Engineering"],"dc:creator":["Dobhal, Madhur"],"dc:date":["2025-06-09T15:17:09Z"],"dc:date.available":["2025-06-09T15:17:09Z"],"dc:date.created":["2025-06-09T15:17:09Z"],"dc:date.issued":["2021"],"dc:description.abstract":["The railroad industry is one primary transportation field, which relies highly on its vast track network. Tie is an essential part of a railway track that holds the rail upright and keeps the railway tracks equally spaced to the correct gauge. This thesis aims to develop a data-driven Railway Tie Deterioration prediction model based on machine learning techniques. We collected a 4-year railway track tie dataset containing the different factors affecting tie failure for each milepost. Initially, the tie deterioration rate was calculated using the number of good tie and the tie installation data. We separated our dataset into training and test dataset based on year. Three models, Random Forest, XGBoost, Multilayer Perceptron, were applied for the point estimation. In order to tackle the model's uncertainty and make a robust decision-making prediction model, prediction intervals are constructed using the bootstrap method. Tie deterioration prediction model will help estimate the number of good ties and bad ties milepost wise, which helps in tie replacement decision-making. Based on the best model, we got nearly the 88% efficiency of MLP model for point estimation and 84% for prediction intervals. This thesis will help in the decision making of railway tie preventive maintenance.","**To request an accessible version of the file(s) associated with this item, contact library@buffalo.edu. Please include the item's persistent URL [http://hdl.handle.net/. . .] in your request.**"],"dc:identifier":["http://hdl.handle.net/10477/87629"],"dc:language":["eng"],"dc:publisher":["State University of New York at Buffalo"],"dc:rights":["Copyright retained by author.","Users of works found in University at Buffalo Institutional Repository (UBIR) are responsible for identifying and contacting the copyright owner for permission to reuse. University at Buffalo Libraries do not manage rights for copyright-protected works and cannot assist with permissions."],"dc:subject":["industrial engineering","operations research"],"dc:title":["Prediction Intervals of Railway Tie Deterioration"],"dc:type":["Text","Thesis"]},"updated_at":"2026-11-19T07:10:04Z"}