{"id":{"repo_id":"byu","oai_identifier":"oai:scholarsarchive.byu.edu:etd-3390"},"canonical_url":"https://search.ndltd.org/etd/byu/oai:scholarsarchive.byu.edu:etd-3390","repository":{"repo_id":"byu","name":"Brigham Young University","base_url":"https://scholarsarchive.byu.edu/do/oai/"},"display":{"title":"The Use of Building Information Modeling in Generating Hard Bid Estimates","abstract":"Building Information Modeling has provided many benefits to the architectural, engineering, construction and facilities management communities. Many studies have been done to validate the asserted benefits, including benefits to the field of estimating. The studies on estimating are currently limited to the realm of conceptual estimates, and have only treated detailed estimates in the abstract. The purpose of this study was to determine how BIM was being used by companies in a hard bid, or detailed estimate scenario. The research team used the Deseret Towers housing project at Brigham Young University as the basis for the research. A building information model (BIM) was provided to all bidders on the project, and at the conclusion of the bidding process a survey was used to determine how the contractors used the model in their bidding processes. The findings determined that a few of the contractors did use the model for quantity takeoff, and one actually used the quantities as the basis for the submitted bid. Additionally, the survey attempted to determine the prevailing attitudes of the estimators toward BIM as a tool in estimating, and their opinions of the future of BIM in estimating.","abstract_html":"Building Information Modeling has provided many benefits to the architectural, engineering, construction and facilities management communities. Many studies have been done to validate the asserted benefits, including benefits to the field of estimating. The studies on estimating are currently limited to the realm of conceptual estimates, and have only treated detailed estimates in the abstract. The purpose of this study was to determine how BIM was being used by companies in a hard bid, or detailed estimate scenario. The research team used the Deseret Towers housing project at Brigham Young University as the basis for the research. A building information model (BIM) was provided to all bidders on the project, and at the conclusion of the bidding process a survey was used to determine how the contractors used the model in their bidding processes. The findings determined that a few of the contractors did use the model for quantity takeoff, and one actually used the quantities as the basis for the submitted bid. Additionally, the survey attempted to determine the prevailing attitudes of the estimators toward BIM as a tool in estimating, and their opinions of the future of BIM in estimating.","abstract_has_math":false,"creators":["Jensen, Peter Samuel"],"institution":"Brigham Young University - Provo","degree_name":"MS","degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-12-16T08:00:00Z","date_published":"2010-12-16T08:00:00Z","updated_at":"2026-11-27T02:25:21Z","subjects":["estimating","BIM","Building Information Modeling","commercial","hard bid","detailed estimate","Construction Engineering and Management"],"languages":["English"],"rights":[],"rights_urls":["http://lib.byu.edu/about/copyright/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://scholarsarchive.byu.edu/etd/2391","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://scholarsarchive.byu.edu/etd/2391","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Abyu%3Aoai%3Ascholarsarchive.byu.edu%3Aetd-3390","prefix":"oai_dc"},"source_record":{"url":"https://scholarsarchive.byu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Ascholarsarchive.byu.edu%3Aetd-3390","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Jensen, Peter Samuel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2010-12-16T08:00:00Z"]},{"key":"dc:publisher","label":"Institution","values":["Brigham Young University - Provo"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["estimating","BIM","Building Information Modeling","commercial","hard bid","detailed estimate","Construction Engineering and Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["http://lib.byu.edu/about/copyright/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://scholarsarchive.byu.edu/etd/2391"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Ira A. Fulton College of Engineering and Technology","Technology"]},{"key":"dc:description.abstract","label":"Abstract","values":["Building Information Modeling has provided many benefits to the architectural, engineering, construction and facilities management communities. Many studies have been done to validate the asserted benefits, including benefits to the field of estimating. The studies on estimating are currently limited to the realm of conceptual estimates, and have only treated detailed estimates in the abstract. The purpose of this study was to determine how BIM was being used by companies in a hard bid, or detailed estimate scenario. The research team used the Deseret Towers housing project at Brigham Young University as the basis for the research. A building information model (BIM) was provided to all bidders on the project, and at the conclusion of the bidding process a survey was used to determine how the contractors used the model in their bidding processes. The findings determined that a few of the contractors did use the model for quantity takeoff, and one actually used the quantities as the basis for the submitted bid. Additionally, the survey attempted to determine the prevailing attitudes of the estimators toward BIM as a tool in estimating, and their opinions of the future of BIM in estimating."]},{"key":"dc:format","label":"Dc Format","values":["application:pdf"]},{"key":"dc:source","label":"Dc Source","values":["Brigham Young University - Provo"]},{"key":"dc:title","label":"Title","values":["The Use of Building Information Modeling in Generating Hard Bid Estimates"]}]}],"canonical_facts":{"dc:creator":["Jensen, Peter Samuel"],"dc:date":["2010-12-16T08:00:00Z"],"dc:description":["Ira A. Fulton College of Engineering and Technology","Technology"],"dc:description.abstract":["Building Information Modeling has provided many benefits to the architectural, engineering, construction and facilities management communities. Many studies have been done to validate the asserted benefits, including benefits to the field of estimating. The studies on estimating are currently limited to the realm of conceptual estimates, and have only treated detailed estimates in the abstract. The purpose of this study was to determine how BIM was being used by companies in a hard bid, or detailed estimate scenario. The research team used the Deseret Towers housing project at Brigham Young University as the basis for the research. A building information model (BIM) was provided to all bidders on the project, and at the conclusion of the bidding process a survey was used to determine how the contractors used the model in their bidding processes. The findings determined that a few of the contractors did use the model for quantity takeoff, and one actually used the quantities as the basis for the submitted bid. Additionally, the survey attempted to determine the prevailing attitudes of the estimators toward BIM as a tool in estimating, and their opinions of the future of BIM in estimating."],"dc:format":["application:pdf"],"dc:identifier":["https://scholarsarchive.byu.edu/etd/2391"],"dc:language":["English"],"dc:publisher":["Brigham Young University - Provo"],"dc:rights.license":["http://lib.byu.edu/about/copyright/"],"dc:source":["Brigham Young University - Provo"],"dc:subject":["estimating","BIM","Building Information Modeling","commercial","hard bid","detailed estimate","Construction Engineering and Management"],"dc:title":["The Use of Building Information Modeling in Generating Hard Bid Estimates"],"dc:type":["Thesis"],"thesis:degree_name":["MS"]},"updated_at":"2026-11-27T02:25:21Z"}