{"id":{"repo_id":"byu","oai_identifier":"oai:scholarsarchive.byu.edu:etd-5079"},"canonical_url":"https://search.ndltd.org/etd/byu/oai:scholarsarchive.byu.edu:etd-5079","repository":{"repo_id":"byu","name":"Brigham Young University","base_url":"https://scholarsarchive.byu.edu/do/oai/"},"display":{"title":"Current BIM Practices of Commercial MEP Contractors","abstract":"Building Information Modeling (BIM) use in the contracting industry has grown significantly in recent years. With this change in the construction industry, consensus has not been reached as to what BIM is, who is using it and what they are using it for. The purpose of this research was to determine current BIM practices of US-based commercial MEP contractors. Executive, middle management, and field personnel were interviewed to determine the current BIM practices in their companies. The majority of companies interviewed were using BIM and most were using it on a significant portion of their projects. The majority of MEP contractors using BIM were seeing positive results in many of six key performance indicators, profitability, schedule duration, field efficiency, change orders, rework, and safety. The top uses of BIM for MEP contractors were clash detection coordination, prefabrication, design creation, and quantity take-off/cost estimating. Most MEP contractors have not yet incorporated BIM for scheduling, sequencing, or safety analysis. Additionally most MEP contractors did not have a formal BIM training program in their company.","abstract_html":"Building Information Modeling (BIM) use in the contracting industry has grown significantly in recent years. With this change in the construction industry, consensus has not been reached as to what BIM is, who is using it and what they are using it for. The purpose of this research was to determine current BIM practices of US-based commercial MEP contractors. Executive, middle management, and field personnel were interviewed to determine the current BIM practices in their companies. The majority of companies interviewed were using BIM and most were using it on a significant portion of their projects. The majority of MEP contractors using BIM were seeing positive results in many of six key performance indicators, profitability, schedule duration, field efficiency, change orders, rework, and safety. The top uses of BIM for MEP contractors were clash detection coordination, prefabrication, design creation, and quantity take-off/cost estimating. Most MEP contractors have not yet incorporated BIM for scheduling, sequencing, or safety analysis. Additionally most MEP contractors did not have a formal BIM training program in their company.","abstract_has_math":false,"creators":["Kent, Bryan John"],"institution":"Brigham Young University - Provo","degree_name":"MS","degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-06-04T07:00:00Z","date_published":"2014-06-04T07:00:00Z","updated_at":"2026-11-27T02:25:52Z","subjects":["building information modeling","BIM","MEP","current practices","clash detection","prefabrication","Construction Engineering and Management"],"languages":["English"],"rights":[],"rights_urls":["http://lib.byu.edu/about/copyright/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://scholarsarchive.byu.edu/etd/4080","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://scholarsarchive.byu.edu/etd/4080","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Abyu%3Aoai%3Ascholarsarchive.byu.edu%3Aetd-5079","prefix":"oai_dc"},"source_record":{"url":"https://scholarsarchive.byu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Ascholarsarchive.byu.edu%3Aetd-5079","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Kent, Bryan John"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2014-06-04T07:00:00Z"]},{"key":"dc:publisher","label":"Institution","values":["Brigham Young University - Provo"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["building information modeling","BIM","MEP","current practices","clash detection","prefabrication","Construction Engineering and Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["http://lib.byu.edu/about/copyright/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://scholarsarchive.byu.edu/etd/4080"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Ira A. Fulton College of Engineering and Technology","Technology"]},{"key":"dc:description.abstract","label":"Abstract","values":["Building Information Modeling (BIM) use in the contracting industry has grown significantly in recent years. With this change in the construction industry, consensus has not been reached as to what BIM is, who is using it and what they are using it for. The purpose of this research was to determine current BIM practices of US-based commercial MEP contractors. Executive, middle management, and field personnel were interviewed to determine the current BIM practices in their companies. The majority of companies interviewed were using BIM and most were using it on a significant portion of their projects. The majority of MEP contractors using BIM were seeing positive results in many of six key performance indicators, profitability, schedule duration, field efficiency, change orders, rework, and safety. The top uses of BIM for MEP contractors were clash detection coordination, prefabrication, design creation, and quantity take-off/cost estimating. Most MEP contractors have not yet incorporated BIM for scheduling, sequencing, or safety analysis. Additionally most MEP contractors did not have a formal BIM training program in their company."]},{"key":"dc:format","label":"Dc Format","values":["application: pdf"]},{"key":"dc:source","label":"Dc Source","values":["Brigham Young University - Provo"]},{"key":"dc:title","label":"Title","values":["Current BIM Practices of Commercial MEP Contractors"]}]}],"canonical_facts":{"dc:creator":["Kent, Bryan John"],"dc:date":["2014-06-04T07:00:00Z"],"dc:description":["Ira A. Fulton College of Engineering and Technology","Technology"],"dc:description.abstract":["Building Information Modeling (BIM) use in the contracting industry has grown significantly in recent years. With this change in the construction industry, consensus has not been reached as to what BIM is, who is using it and what they are using it for. The purpose of this research was to determine current BIM practices of US-based commercial MEP contractors. Executive, middle management, and field personnel were interviewed to determine the current BIM practices in their companies. The majority of companies interviewed were using BIM and most were using it on a significant portion of their projects. The majority of MEP contractors using BIM were seeing positive results in many of six key performance indicators, profitability, schedule duration, field efficiency, change orders, rework, and safety. The top uses of BIM for MEP contractors were clash detection coordination, prefabrication, design creation, and quantity take-off/cost estimating. Most MEP contractors have not yet incorporated BIM for scheduling, sequencing, or safety analysis. Additionally most MEP contractors did not have a formal BIM training program in their company."],"dc:format":["application: pdf"],"dc:identifier":["https://scholarsarchive.byu.edu/etd/4080"],"dc:language":["English"],"dc:publisher":["Brigham Young University - Provo"],"dc:rights.license":["http://lib.byu.edu/about/copyright/"],"dc:source":["Brigham Young University - Provo"],"dc:subject":["building information modeling","BIM","MEP","current practices","clash detection","prefabrication","Construction Engineering and Management"],"dc:title":["Current BIM Practices of Commercial MEP Contractors"],"dc:type":["Thesis"],"thesis:degree_name":["MS"]},"updated_at":"2026-11-27T02:25:52Z"}