{"id":{"repo_id":"calgary","oai_identifier":"oai:ucalgary.scholaris.ca:11023/1444"},"canonical_url":"https://search.ndltd.org/etd/calgary/oai:ucalgary.scholaris.ca:11023/1444","repository":{"repo_id":"calgary","name":"University of Calgary","base_url":"https://ucalgary.scholaris.ca/server/oai/request"},"display":{"title":"Relationship Between The Ratio Of Direct And Support Work With Productivity For Slab Formwork","abstract":"Construction companies have yet to establish universal benchmarks. With the advent of the World Wide Web, it has become easier to share information both internally and externally. Productivity metrics are very popular amongst many industries, especially in the construction realm. However, throughout benchmarking history, there has been a lack of consistency in regard to definitions, data collection, and data organization. Studies that utilize work sampling have been frequently employed by construction company initiatives to monitor the distribution of certain categories of productive and non- productive time of a certain construction trade. Traditionally, these studies have focused on maximizing the amount of direct work or “tool-time” in order to optimize productivity. This theory has recently been challenged, whereby the climax of productivity will occur based on a distinct ratio between direct work and supportive work. The proposed framework aims to develop a database and benchmarking system of activity analysis category ratios and associated productivity values for concrete formwork installation using Google Fusion Tables (GFT). The sixteen-week work sampling activity analysis has been executed on a large commercial construction project in western Canada.","abstract_html":"Construction companies have yet to establish universal benchmarks. With the advent of the World Wide Web, it has become easier to share information both internally and externally. Productivity metrics are very popular amongst many industries, especially in the construction realm. However, throughout benchmarking history, there has been a lack of consistency in regard to definitions, data collection, and data organization. Studies that utilize work sampling have been frequently employed by construction company initiatives to monitor the distribution of certain categories of productive and non- productive time of a certain construction trade. Traditionally, these studies have focused on maximizing the amount of direct work or “tool-time” in order to optimize productivity. This theory has recently been challenged, whereby the climax of productivity will occur based on a distinct ratio between direct work and supportive work. The proposed framework aims to develop a database and benchmarking system of activity analysis category ratios and associated productivity values for concrete formwork installation using Google Fusion Tables (GFT). The sixteen-week work sampling activity analysis has been executed on a large commercial construction project in western Canada.","abstract_has_math":false,"creators":["Titov, Roman"],"institution":"Graduate Studies","degree_name":"Master of Science (MSc)","degree_level":null,"degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Ruwanpura, Janaka"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-04-28","date_published":"2014-04-28","updated_at":"2026-11-19T07:28:09Z","subjects":["Engineering--Civil"],"languages":["eng"],"rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11023/1444"],"render_values":[{"text":"http://hdl.handle.net/11023/1444","href":"https://hdl.handle.net/11023/1444","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.11575/PRISM/27604","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.11575/PRISM/27604","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Acalgary%3Aoai%3Aucalgary.scholaris.ca%3A11023%2F1444","prefix":"oai_dc"},"source_record":{"url":"https://ucalgary.scholaris.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aucalgary.scholaris.ca%3A11023%2F1444","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ruwanpura, Janaka"]},{"key":"dc:creator","label":"Author","values":["Titov, Roman"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-04-28T22:48:21Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-06-16T07:00:36Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-04-28"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2014"]},{"key":"dc:publisher.faculty","label":"Dc Publisher Faculty","values":["Graduate Studies"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Calgary"]},{"key":"dc:publisher.place","label":"Dc Publisher Place","values":["Calgary"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MSc)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Calgary"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering--Civil"]},{"key":"dc:subject.classification","label":"Dc Subject Classification","values":["Productivity","Work Sampling","Tool-Time","Direct Work","Support Work","Slab Formwork","Database","Cloud","Benchmarking","Project Management","Construction"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Titov, R. (2014). Relationship Between The Ratio Of Direct And Support Work With Productivity For Slab Formwork (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/27604"]},{"key":"dc:identifier.doi","label":"DOI","values":["http://dx.doi.org/10.11575/PRISM/27604"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11023/1444"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"atmire:migration.oldid","label":"Atmire Migration Oldid","values":["2054"]},{"key":"dc:description.abstract","label":"Abstract","values":["Construction companies have yet to establish universal benchmarks. With the advent of the World Wide Web, it has become easier to share information both internally and externally. Productivity metrics are very popular amongst many industries, especially in the construction realm. However, throughout benchmarking history, there has been a lack of consistency in regard to definitions, data collection, and data organization. Studies that utilize work sampling have been frequently employed by construction company initiatives to monitor the distribution of certain categories of productive and non- productive time of a certain construction trade. Traditionally, these studies have focused on maximizing the amount of direct work or “tool-time” in order to optimize productivity. This theory has recently been challenged, whereby the climax of productivity will occur based on a distinct ratio between direct work and supportive work. The proposed framework aims to develop a database and benchmarking system of activity analysis category ratios and associated productivity values for concrete formwork installation using Google Fusion Tables (GFT). The sixteen-week work sampling activity analysis has been executed on a large commercial construction project in western Canada."]},{"key":"dc:title","label":"Title","values":["Relationship Between The Ratio Of Direct And Support Work With Productivity For Slab Formwork"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:request.copy","label":"Local Request Copy","values":["true"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"atmire:migration.oldid":["2054"],"dc:contributor.advisor":["Ruwanpura, Janaka"],"dc:creator":["Titov, Roman"],"dc:date.accessioned":["2014-04-28T22:48:21Z"],"dc:date.available":["2014-06-16T07:00:36Z"],"dc:date.issued":["2014-04-28"],"dc:date.submitted":["2014"],"dc:description.abstract":["Construction companies have yet to establish universal benchmarks. With the advent of the World Wide Web, it has become easier to share information both internally and externally. Productivity metrics are very popular amongst many industries, especially in the construction realm. However, throughout benchmarking history, there has been a lack of consistency in regard to definitions, data collection, and data organization. Studies that utilize work sampling have been frequently employed by construction company initiatives to monitor the distribution of certain categories of productive and non- productive time of a certain construction trade. Traditionally, these studies have focused on maximizing the amount of direct work or “tool-time” in order to optimize productivity. This theory has recently been challenged, whereby the climax of productivity will occur based on a distinct ratio between direct work and supportive work. The proposed framework aims to develop a database and benchmarking system of activity analysis category ratios and associated productivity values for concrete formwork installation using Google Fusion Tables (GFT). The sixteen-week work sampling activity analysis has been executed on a large commercial construction project in western Canada."],"dc:identifier.citation":["Titov, R. (2014). Relationship Between The Ratio Of Direct And Support Work With Productivity For Slab Formwork (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/27604"],"dc:identifier.doi":["http://dx.doi.org/10.11575/PRISM/27604"],"dc:identifier.uri":["http://hdl.handle.net/11023/1444"],"dc:language.iso":["eng"],"dc:publisher.faculty":["Graduate Studies"],"dc:publisher.institution":["University of Calgary"],"dc:publisher.place":["Calgary"],"dc:rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"dc:subject":["Engineering--Civil"],"dc:subject.classification":["Productivity","Work Sampling","Tool-Time","Direct Work","Support Work","Slab Formwork","Database","Cloud","Benchmarking","Project Management","Construction"],"dc:title":["Relationship Between The Ratio Of Direct And Support Work With Productivity For Slab Formwork"],"dc:type":["master thesis"],"dspace:entity.type":["Publication"],"local:request.copy":["true"],"others:access_status":["open.access"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_name":["Master of Science (MSc)"],"thesis:institution_name":["University of Calgary"]},"updated_at":"2026-11-19T07:28:09Z"}