{"id":{"repo_id":"calgary","oai_identifier":"oai:ucalgary.scholaris.ca:11023/3115"},"canonical_url":"https://search.ndltd.org/etd/calgary/oai:ucalgary.scholaris.ca:11023/3115","repository":{"repo_id":"calgary","name":"University of Calgary","base_url":"https://ucalgary.scholaris.ca/server/oai/request"},"display":{"title":"How to Overcome the Challenges in In-situ Decommissioning of the Above Ground Tailings Management Facility?","abstract":"This thesis focused on the challenges related to the in-situ decommissioning of the above ground tailings management facility (AGTMF) at Cameco’s Key Lake Uranium Milling and Mining Operations. The uranium tailings stored in the AGTMF from 1983 to 1998 could adversely affect the regional biota and public health as the tailings. Significant uncertainties also exist in regards to the ultimate long-term storage of uranium mine tailings as the timescales involved are relatively long (e.g. 10, 000 years modeling required). This study has explored the processes, challenges and lessons learned in the in-situ decommissioning and the methods on how to overcome the challenges related to decommissioning the AGTMF. The stored tailings are key areas of liability and this thesis has endeavored to overcome the challenges by gaining insights from decommissioning activities within uranium industry globally to achieve a safe, cost effective, and environmentally sustainable decommissioning process for the AGTMF.","abstract_html":"This thesis focused on the challenges related to the in-situ decommissioning of the above ground tailings management facility (AGTMF) at Cameco’s Key Lake Uranium Milling and Mining Operations. The uranium tailings stored in the AGTMF from 1983 to 1998 could adversely affect the regional biota and public health as the tailings. Significant uncertainties also exist in regards to the ultimate long-term storage of uranium mine tailings as the timescales involved are relatively long (e.g. 10, 000 years modeling required). This study has explored the processes, challenges and lessons learned in the in-situ decommissioning and the methods on how to overcome the challenges related to decommissioning the AGTMF. The stored tailings are key areas of liability and this thesis has endeavored to overcome the challenges by gaining insights from decommissioning activities within uranium industry globally to achieve a safe, cost effective, and environmentally sustainable decommissioning process for the AGTMF.","abstract_has_math":false,"creators":["Madhavan, Dayal"],"institution":"Graduate Studies","degree_name":"Master of Engineering (MEng)","degree_level":null,"degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Ruwanpura, Janaka"],"committee_chairs":[],"committee_members":["Achari, Gopal","Jergeas, George"],"year":2016,"date_issued":"2016","date_published":"2016","updated_at":"2026-11-19T07:28:33Z","subjects":["Engineering--Civil","Engineering--Environmental","Engineering--Mining","Engineering--Nuclear"],"languages":["eng"],"rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11023/3115"],"render_values":[{"text":"http://hdl.handle.net/11023/3115","href":"https://hdl.handle.net/11023/3115","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.11575/PRISM/26396","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.11575/PRISM/26396","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Acalgary%3Aoai%3Aucalgary.scholaris.ca%3A11023%2F3115","prefix":"oai_dc"},"source_record":{"url":"https://ucalgary.scholaris.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aucalgary.scholaris.ca%3A11023%2F3115","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ruwanpura, Janaka"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Achari, Gopal","Jergeas, George"]},{"key":"dc:creator","label":"Author","values":["Madhavan, Dayal"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-07-08T20:53:23Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-07-08T20:53:23Z"]},{"key":"dc:date.issued","label":"Date","values":["2016"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2016"]},{"key":"dc:publisher.faculty","label":"Dc Publisher Faculty","values":["Graduate Studies"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Calgary"]},{"key":"dc:publisher.place","label":"Dc Publisher Place","values":["Calgary"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering (MEng)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Calgary"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering--Civil","Engineering--Environmental","Engineering--Mining","Engineering--Nuclear"]},{"key":"dc:subject.classification","label":"Dc Subject Classification","values":["Project Management","In-situ Decommissioning","Uranium Tailings","Entombment"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Madhavan, D. (2016). How to Overcome the Challenges in In-situ Decommissioning of the Above Ground Tailings Management Facility? (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/26396"]},{"key":"dc:identifier.doi","label":"DOI","values":["http://dx.doi.org/10.11575/PRISM/26396"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11023/3115"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"atmire:migration.oldid","label":"Atmire Migration Oldid","values":["4615"]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis focused on the challenges related to the in-situ decommissioning of the above ground tailings management facility (AGTMF) at Cameco’s Key Lake Uranium Milling and Mining Operations. The uranium tailings stored in the AGTMF from 1983 to 1998 could adversely affect the regional biota and public health as the tailings. Significant uncertainties also exist in regards to the ultimate long-term storage of uranium mine tailings as the timescales involved are relatively long (e.g. 10, 000 years modeling required). This study has explored the processes, challenges and lessons learned in the in-situ decommissioning and the methods on how to overcome the challenges related to decommissioning the AGTMF. The stored tailings are key areas of liability and this thesis has endeavored to overcome the challenges by gaining insights from decommissioning activities within uranium industry globally to achieve a safe, cost effective, and environmentally sustainable decommissioning process for the AGTMF."]},{"key":"dc:title","label":"Title","values":["How to Overcome the Challenges in In-situ Decommissioning of the Above Ground Tailings Management Facility?"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:request.copy","label":"Local Request Copy","values":["true"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"atmire:migration.oldid":["4615"],"dc:contributor.advisor":["Ruwanpura, Janaka"],"dc:contributor.committeemember":["Achari, Gopal","Jergeas, George"],"dc:creator":["Madhavan, Dayal"],"dc:date.accessioned":["2016-07-08T20:53:23Z"],"dc:date.available":["2016-07-08T20:53:23Z"],"dc:date.issued":["2016"],"dc:date.submitted":["2016"],"dc:description.abstract":["This thesis focused on the challenges related to the in-situ decommissioning of the above ground tailings management facility (AGTMF) at Cameco’s Key Lake Uranium Milling and Mining Operations. The uranium tailings stored in the AGTMF from 1983 to 1998 could adversely affect the regional biota and public health as the tailings. Significant uncertainties also exist in regards to the ultimate long-term storage of uranium mine tailings as the timescales involved are relatively long (e.g. 10, 000 years modeling required). This study has explored the processes, challenges and lessons learned in the in-situ decommissioning and the methods on how to overcome the challenges related to decommissioning the AGTMF. The stored tailings are key areas of liability and this thesis has endeavored to overcome the challenges by gaining insights from decommissioning activities within uranium industry globally to achieve a safe, cost effective, and environmentally sustainable decommissioning process for the AGTMF."],"dc:identifier.citation":["Madhavan, D. (2016). How to Overcome the Challenges in In-situ Decommissioning of the Above Ground Tailings Management Facility? (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/26396"],"dc:identifier.doi":["http://dx.doi.org/10.11575/PRISM/26396"],"dc:identifier.uri":["http://hdl.handle.net/11023/3115"],"dc:language.iso":["eng"],"dc:publisher.faculty":["Graduate Studies"],"dc:publisher.institution":["University of Calgary"],"dc:publisher.place":["Calgary"],"dc:rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"dc:subject":["Engineering--Civil","Engineering--Environmental","Engineering--Mining","Engineering--Nuclear"],"dc:subject.classification":["Project Management","In-situ Decommissioning","Uranium Tailings","Entombment"],"dc:title":["How to Overcome the Challenges in In-situ Decommissioning of the Above Ground Tailings Management Facility?"],"dc:type":["master thesis"],"dspace:entity.type":["Publication"],"local:request.copy":["true"],"others:access_status":["open.access"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_name":["Master of Engineering (MEng)"],"thesis:institution_name":["University of Calgary"]},"updated_at":"2026-11-19T07:28:33Z"}