{"id":{"repo_id":"calgary","oai_identifier":"oai:ucalgary.scholaris.ca:1880/107730"},"canonical_url":"https://search.ndltd.org/etd/calgary/oai:ucalgary.scholaris.ca:1880/107730","repository":{"repo_id":"calgary","name":"University of Calgary","base_url":"https://ucalgary.scholaris.ca/server/oai/request"},"display":{"title":"Design Project Scheduling with Probabilistic Iterations: Optimization & Investigation of Robustness","abstract":"This research focuses on reliable prediction of product development (PD) project duration within reasonable solution times. It is based on the model of PD projects presented by Smith and Eppinger which suggests that PD projects are akin to Markov reward chains. The research was divided into two phases; the development of a hybrid algorithm to minimize the problem’s solve time without compromising solution quality and the identification of features of a robust PD schedule. The first phase of the research shows that the hybrid algorithm yields similar quality solutions whilst reducing solve times by 50% - 97.4%. The second phase highlights four features that affect robust PD schedule as well as patterns observed in the schedule. In conclusion, this research demonstrates the utility of the developed hybrid algorithm and also illustrates the importance of examining expected project duration and the standard deviation in the results when developing robust PD schedules.","abstract_html":"This research focuses on reliable prediction of product development (PD) project duration within reasonable solution times. It is based on the model of PD projects presented by Smith and Eppinger which suggests that PD projects are akin to Markov reward chains. The research was divided into two phases; the development of a hybrid algorithm to minimize the problem’s solve time without compromising solution quality and the identification of features of a robust PD schedule. The first phase of the research shows that the hybrid algorithm yields similar quality solutions whilst reducing solve times by 50% - 97.4%. The second phase highlights four features that affect robust PD schedule as well as patterns observed in the schedule. In conclusion, this research demonstrates the utility of the developed hybrid algorithm and also illustrates the importance of examining expected project duration and the standard deviation in the results when developing robust PD schedules.","abstract_has_math":false,"creators":["Ebufegha, Akposeiyifa Joseph"],"institution":"Graduate Studies","degree_name":"Master of Science (MSc)","degree_level":null,"degree_discipline":"Mechanical and Manufacturing Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Li, Simon"],"committee_chairs":[],"committee_members":["Tu, Paul","Xue, Deyi","Sadeghpour, Farnaz"],"year":2018,"date_issued":"2018-09-05","date_published":"2018-09-05","updated_at":"2026-11-19T07:32:15Z","subjects":[],"languages":["eng"],"rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1880/107730"],"render_values":[{"text":"http://hdl.handle.net/1880/107730","href":"https://hdl.handle.net/1880/107730","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.11575/PRISM/32906","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.11575/PRISM/32906","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Acalgary%3Aoai%3Aucalgary.scholaris.ca%3A1880%2F107730","prefix":"oai_dc"},"source_record":{"url":"https://ucalgary.scholaris.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aucalgary.scholaris.ca%3A1880%2F107730","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Li, Simon"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Tu, Paul","Xue, Deyi","Sadeghpour, Farnaz"]},{"key":"dc:creator","label":"Author","values":["Ebufegha, Akposeiyifa Joseph"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2018-11"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2018-09-14T18:02:57Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2018-09-14T18:02:57Z"]},{"key":"dc:date.issued","label":"Date","values":["2018-09-05"]},{"key":"dc:publisher.faculty","label":"Dc Publisher Faculty","values":["Graduate Studies","Schulich School of Engineering"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Calgary"]},{"key":"dc:publisher.place","label":"Dc Publisher Place","values":["Calgary"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mechanical and Manufacturing Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MSc)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Calgary"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.classification","label":"Dc Subject Classification","values":["Engineering--Industrial","Engineering--Mechanical"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Ebufegha, A. J. (2018). Design Project Scheduling with Probabilistic Iterations: Optimization & Investigation of Robustness (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/32906"]},{"key":"dc:identifier.doi","label":"DOI","values":["http://dx.doi.org/10.11575/PRISM/32906"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1880/107730"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research focuses on reliable prediction of product development (PD) project duration within reasonable solution times. It is based on the model of PD projects presented by Smith and Eppinger which suggests that PD projects are akin to Markov reward chains. The research was divided into two phases; the development of a hybrid algorithm to minimize the problem’s solve time without compromising solution quality and the identification of features of a robust PD schedule. The first phase of the research shows that the hybrid algorithm yields similar quality solutions whilst reducing solve times by 50% - 97.4%. The second phase highlights four features that affect robust PD schedule as well as patterns observed in the schedule. In conclusion, this research demonstrates the utility of the developed hybrid algorithm and also illustrates the importance of examining expected project duration and the standard deviation in the results when developing robust PD schedules."]},{"key":"dc:title","label":"Title","values":["Design Project Scheduling with Probabilistic Iterations: Optimization & Investigation of Robustness"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:request.copy","label":"Local Request Copy","values":["true"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Li, Simon"],"dc:contributor.committeemember":["Tu, Paul","Xue, Deyi","Sadeghpour, Farnaz"],"dc:creator":["Ebufegha, Akposeiyifa Joseph"],"dc:date":["2018-11"],"dc:date.accessioned":["2018-09-14T18:02:57Z"],"dc:date.available":["2018-09-14T18:02:57Z"],"dc:date.issued":["2018-09-05"],"dc:description.abstract":["This research focuses on reliable prediction of product development (PD) project duration within reasonable solution times. It is based on the model of PD projects presented by Smith and Eppinger which suggests that PD projects are akin to Markov reward chains. The research was divided into two phases; the development of a hybrid algorithm to minimize the problem’s solve time without compromising solution quality and the identification of features of a robust PD schedule. The first phase of the research shows that the hybrid algorithm yields similar quality solutions whilst reducing solve times by 50% - 97.4%. The second phase highlights four features that affect robust PD schedule as well as patterns observed in the schedule. In conclusion, this research demonstrates the utility of the developed hybrid algorithm and also illustrates the importance of examining expected project duration and the standard deviation in the results when developing robust PD schedules."],"dc:identifier.citation":["Ebufegha, A. J. (2018). Design Project Scheduling with Probabilistic Iterations: Optimization & Investigation of Robustness (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/32906"],"dc:identifier.doi":["http://dx.doi.org/10.11575/PRISM/32906"],"dc:identifier.uri":["http://hdl.handle.net/1880/107730"],"dc:language.iso":["eng"],"dc:publisher.faculty":["Graduate Studies","Schulich School of Engineering"],"dc:publisher.institution":["University of Calgary"],"dc:publisher.place":["Calgary"],"dc:rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"dc:subject.classification":["Engineering--Industrial","Engineering--Mechanical"],"dc:title":["Design Project Scheduling with Probabilistic Iterations: Optimization & Investigation of Robustness"],"dc:type":["master thesis"],"dspace:entity.type":["Publication"],"local:request.copy":["true"],"others:access_status":["open.access"],"thesis:degree_discipline":["Mechanical and Manufacturing Engineering"],"thesis:degree_name":["Master of Science (MSc)"],"thesis:institution_name":["University of Calgary"]},"updated_at":"2026-11-19T07:32:15Z"}