{"id":{"repo_id":"clemson","oai_identifier":"oai:open.clemson.edu:all_dissertations-2056"},"canonical_url":"https://search.ndltd.org/etd/clemson/oai:open.clemson.edu:all_dissertations-2056","repository":{"repo_id":"clemson","name":"Clemson University","base_url":"https://open.clemson.edu/do/oai/"},"display":{"title":"BUILDING SOCIAL INFRASTRUCTURE THROUGH PUBLIC-PRIVATE PARTNERSHIPS: THE CASE OF STUDENT HOUSING IN PUBLIC HIGHER EDUCATION","abstract":"Evaluations of Public-Private Partnership arrangements as alternatives to traditional government procurement methods for the delivery of public infrastructure projects have been anecdotal at best. This paper proposes a framework to evaluate a public university's infrastructure asset management performance and a specific measure based on a new concept of the elapsed time required for services to be delivered (i.e., Project Completion Time). The results suggest that the choice to use a public-private partnership as a project delivery method for student housing at a public university can dramatically shorten the overall schedule. This research will serve as the foundation for future quantitative research on the relationship between PPPs and the performance of various types of public projects.","abstract_html":"Evaluations of Public-Private Partnership arrangements as alternatives to traditional government procurement methods for the delivery of public infrastructure projects have been anecdotal at best. This paper proposes a framework to evaluate a public university&#x27;s infrastructure asset management performance and a specific measure based on a new concept of the elapsed time required for services to be delivered (i.e., Project Completion Time). The results suggest that the choice to use a public-private partnership as a project delivery method for student housing at a public university can dramatically shorten the overall schedule. This research will serve as the foundation for future quantitative research on the relationship between PPPs and the performance of various types of public projects.","abstract_has_math":false,"creators":["Cole, Bruce"],"institution":null,"degree_name":"Doctor of Philosophy (PhD)","degree_level":"Dissertation","degree_discipline":"Planning, Design, and the Built Environment","degree_department":null,"school":null,"contributors":["Worzala, Elaine","Worzala , Elaine","Bridges , William","Ellis , Cliff","Kaganova , Olga"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T07:10:39Z","subjects":["Facilities Planning","Public-Private Partnerships","Regulatory Drag","Student Housing","Public Affairs, Public Policy and Public Administration"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://open.clemson.edu/all_dissertations/1056","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://open.clemson.edu/all_dissertations/1056","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://open.clemson.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopen.clemson.edu%3Aall_dissertations-2056","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Worzala, Elaine","Worzala , Elaine","Bridges , William","Ellis , Cliff","Kaganova , Olga"]},{"key":"dc:creator","label":"Author","values":["Cole, Bruce"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2014-12-03T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2012-12-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Planning, Design, and the Built Environment"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy (PhD)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Facilities Planning","Public-Private Partnerships","Regulatory Drag","Student Housing","Public Affairs, Public Policy and Public Administration"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://open.clemson.edu/all_dissertations/1056"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Evaluations of Public-Private Partnership arrangements as alternatives to traditional government procurement methods for the delivery of public infrastructure projects have been anecdotal at best. This paper proposes a framework to evaluate a public university's infrastructure asset management performance and a specific measure based on a new concept of the elapsed time required for services to be delivered (i.e., Project Completion Time). The results suggest that the choice to use a public-private partnership as a project delivery method for student housing at a public university can dramatically shorten the overall schedule. This research will serve as the foundation for future quantitative research on the relationship between PPPs and the performance of various types of public projects."]},{"key":"dc:title","label":"Title","values":["BUILDING SOCIAL INFRASTRUCTURE THROUGH PUBLIC-PRIVATE PARTNERSHIPS: THE CASE OF STUDENT HOUSING IN PUBLIC HIGHER EDUCATION"]}]}],"canonical_facts":{"dc:contributor":["Worzala, Elaine","Worzala , Elaine","Bridges , William","Ellis , Cliff","Kaganova , Olga"],"dc:creator":["Cole, Bruce"],"dc:date.available":["2014-12-03T08:00:00Z"],"dc:date.created":["2012-12-01T08:00:00Z"],"dc:description.abstract":["Evaluations of Public-Private Partnership arrangements as alternatives to traditional government procurement methods for the delivery of public infrastructure projects have been anecdotal at best. This paper proposes a framework to evaluate a public university's infrastructure asset management performance and a specific measure based on a new concept of the elapsed time required for services to be delivered (i.e., Project Completion Time). The results suggest that the choice to use a public-private partnership as a project delivery method for student housing at a public university can dramatically shorten the overall schedule. This research will serve as the foundation for future quantitative research on the relationship between PPPs and the performance of various types of public projects."],"dc:identifier":["https://open.clemson.edu/all_dissertations/1056"],"dc:subject":["Facilities Planning","Public-Private Partnerships","Regulatory Drag","Student Housing","Public Affairs, Public Policy and Public Administration"],"dc:title":["BUILDING SOCIAL INFRASTRUCTURE THROUGH PUBLIC-PRIVATE PARTNERSHIPS: THE CASE OF STUDENT HOUSING IN PUBLIC HIGHER EDUCATION"],"thesis:degree_discipline":["Planning, Design, and the Built Environment"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Doctor of Philosophy (PhD)"]},"updated_at":"2026-11-19T07:10:39Z"}