{"id":{"repo_id":"clemson","oai_identifier":"oai:open.clemson.edu:all_dissertations-2373"},"canonical_url":"https://search.ndltd.org/etd/clemson/oai:open.clemson.edu:all_dissertations-2373","repository":{"repo_id":"clemson","name":"Clemson University","base_url":"https://open.clemson.edu/do/oai/"},"display":{"title":"Comparison of the Design-Bid-Build and Construction Manager at Risk Project Delivery Methods Utilized for the Construction of Public Schools","abstract":"No","abstract_html":"No","abstract_has_math":false,"creators":["Carpenter, Noel"],"institution":null,"degree_name":"Doctor of Philosophy (PhD)","degree_level":"Dissertation","degree_discipline":"Planning, Design, and the Built Environment","degree_department":null,"school":null,"contributors":["Dr. Dennis C. Bausman, PhD","Dr. Roger W. Liska, EdD","Dr. Hoke S. Hill, Jr., PhD, MA","Dr. Barry C. Nocks, PhD, PDP","Michael E. Kenig, Vice Chairman, Holder Construction Co."],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T07:11:17Z","subjects":["CM at-Risk","Collaboration","Delivery Methods","Project Delivery Methods","Project Mangement","Risk","Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://open.clemson.edu/all_dissertations/1372","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://open.clemson.edu/all_dissertations/1372","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://open.clemson.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopen.clemson.edu%3Aall_dissertations-2373","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Dr. Dennis C. Bausman, PhD","Dr. Roger W. Liska, EdD","Dr. Hoke S. Hill, Jr., PhD, MA","Dr. Barry C. Nocks, PhD, PDP","Michael E. Kenig, Vice Chairman, Holder Construction Co."]},{"key":"dc:creator","label":"Author","values":["Carpenter, Noel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2014-12-03T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2014-05-01T07:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Planning, Design, and the Built Environment"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy (PhD)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["CM at-Risk","Collaboration","Delivery Methods","Project Delivery Methods","Project Mangement","Risk","Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://open.clemson.edu/all_dissertations/1372"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["No"]},{"key":"dc:title","label":"Title","values":["Comparison of the Design-Bid-Build and Construction Manager at Risk Project Delivery Methods Utilized for the Construction of Public Schools"]}]}],"canonical_facts":{"dc:contributor":["Dr. Dennis C. Bausman, PhD","Dr. Roger W. Liska, EdD","Dr. Hoke S. Hill, Jr., PhD, MA","Dr. Barry C. Nocks, PhD, PDP","Michael E. Kenig, Vice Chairman, Holder Construction Co."],"dc:creator":["Carpenter, Noel"],"dc:date.available":["2014-12-03T08:00:00Z"],"dc:date.created":["2014-05-01T07:00:00Z"],"dc:description.abstract":["No"],"dc:identifier":["https://open.clemson.edu/all_dissertations/1372"],"dc:subject":["CM at-Risk","Collaboration","Delivery Methods","Project Delivery Methods","Project Mangement","Risk","Engineering"],"dc:title":["Comparison of the Design-Bid-Build and Construction Manager at Risk Project Delivery Methods Utilized for the Construction of Public Schools"],"thesis:degree_discipline":["Planning, Design, and the Built Environment"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Doctor of Philosophy (PhD)"]},"updated_at":"2026-11-19T07:11:17Z"}