{"id":{"repo_id":"clemson","oai_identifier":"oai:open.clemson.edu:all_theses-1054"},"canonical_url":"https://search.ndltd.org/etd/clemson/oai:open.clemson.edu:all_theses-1054","repository":{"repo_id":"clemson","name":"Clemson University","base_url":"https://open.clemson.edu/do/oai/"},"display":{"title":"Best Practices for Developing the Engineer's Estimate","abstract":"The research project 'Best Practices for Developing the Engineering Estimate' was executed by Clemson University on behalf of the South Carolina Department of Transportation (SCDOT). The primary objective of this research project was to investigate the strengths and weaknesses of two types of estimating methods being utilized today by state department of transportations (DOT) nationwide. These two types of estimating methods are the unit cost line item approach, which the SCDOT utilizes, and the cost-based estimating approach. This research report identifies accuracy obtained, resources expended, and methodologies utilized when implementing either type of estimating approach. This was done so the research team could gather enough evidence to suggest if a change was needed in the SCDOT estimating methodology. There is no compelling evidence to suggest that SCDOT adopt a cost-based/combination estimating approach when preparing the engineer's estimate.","abstract_html":"The research project &#x27;Best Practices for Developing the Engineering Estimate&#x27; was executed by Clemson University on behalf of the South Carolina Department of Transportation (SCDOT). The primary objective of this research project was to investigate the strengths and weaknesses of two types of estimating methods being utilized today by state department of transportations (DOT) nationwide. These two types of estimating methods are the unit cost line item approach, which the SCDOT utilizes, and the cost-based estimating approach. This research report identifies accuracy obtained, resources expended, and methodologies utilized when implementing either type of estimating approach. This was done so the research team could gather enough evidence to suggest if a change was needed in the SCDOT estimating methodology. There is no compelling evidence to suggest that SCDOT adopt a cost-based/combination estimating approach when preparing the engineer&#x27;s estimate.","abstract_has_math":false,"creators":["Niedzwecki, Karl"],"institution":null,"degree_name":"Master of Science (MS)","degree_level":"Thesis","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Bell, Lansford C"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T07:05:58Z","subjects":["Civil Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://open.clemson.edu/all_theses/54","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://open.clemson.edu/all_theses/54","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://open.clemson.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopen.clemson.edu%3Aall_theses-1054","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Bell, Lansford C"]},{"key":"dc:creator","label":"Author","values":["Niedzwecki, Karl"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2015-09-30T07:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2006-12-11T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Civil Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://open.clemson.edu/all_theses/54"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The research project 'Best Practices for Developing the Engineering Estimate' was executed by Clemson University on behalf of the South Carolina Department of Transportation (SCDOT). The primary objective of this research project was to investigate the strengths and weaknesses of two types of estimating methods being utilized today by state department of transportations (DOT) nationwide. These two types of estimating methods are the unit cost line item approach, which the SCDOT utilizes, and the cost-based estimating approach. This research report identifies accuracy obtained, resources expended, and methodologies utilized when implementing either type of estimating approach. This was done so the research team could gather enough evidence to suggest if a change was needed in the SCDOT estimating methodology. There is no compelling evidence to suggest that SCDOT adopt a cost-based/combination estimating approach when preparing the engineer's estimate."]},{"key":"dc:title","label":"Title","values":["Best Practices for Developing the Engineer's Estimate"]}]}],"canonical_facts":{"dc:contributor":["Bell, Lansford C"],"dc:creator":["Niedzwecki, Karl"],"dc:date.available":["2015-09-30T07:00:00Z"],"dc:date.created":["2006-12-11T08:00:00Z"],"dc:description.abstract":["The research project 'Best Practices for Developing the Engineering Estimate' was executed by Clemson University on behalf of the South Carolina Department of Transportation (SCDOT). The primary objective of this research project was to investigate the strengths and weaknesses of two types of estimating methods being utilized today by state department of transportations (DOT) nationwide. These two types of estimating methods are the unit cost line item approach, which the SCDOT utilizes, and the cost-based estimating approach. This research report identifies accuracy obtained, resources expended, and methodologies utilized when implementing either type of estimating approach. This was done so the research team could gather enough evidence to suggest if a change was needed in the SCDOT estimating methodology. There is no compelling evidence to suggest that SCDOT adopt a cost-based/combination estimating approach when preparing the engineer's estimate."],"dc:identifier":["https://open.clemson.edu/all_theses/54"],"dc:subject":["Civil Engineering"],"dc:title":["Best Practices for Developing the Engineer's Estimate"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T07:05:58Z"}