{"id":{"repo_id":"clemson","oai_identifier":"oai:open.clemson.edu:all_theses-3622"},"canonical_url":"https://search.ndltd.org/etd/clemson/oai:open.clemson.edu:all_theses-3622","repository":{"repo_id":"clemson","name":"Clemson University","base_url":"https://open.clemson.edu/do/oai/"},"display":{"title":"Connector or Disconnector: Analyzing Impacts of the Interstate 75/85 Connector on Historic Neighborhoods in Atlanta, Georgia","abstract":"As a response to growing traffic in Atlanta, almost constant road work has been occurring in the city for the past 75 years. The growth of the city and the ever-changing road system has had dramatic impact on the physical deterioration of the historic fabric of the city. One of the most intense impacts came with the construction and reconstruction of the Interstate 75/85 Connector running north to south through the center of downtown. This research examines impacts of the construction of the interstate in the 1950s and the reconstruction in the 1980s to determine the level of physical deterioration in three historic neighborhoods. Data collected on building use, vacancy rates, and owner-occupancy rates are used to answer the question: did the land use and occupancy of lots in historic neighborhoods change as a result of Atlanta's 75/85 Connector, and if so how enduring were these changes? Data from the study shows that due to the creation of the Connector, a temporary rise in vacancy and decrease in residential rates occurred, couple with lasting increased commercial rates and decreased owner-occupancy. The study also found that the placement of the Connector impacted the degree of change in these data sets.","abstract_html":"As a response to growing traffic in Atlanta, almost constant road work has been occurring in the city for the past 75 years. The growth of the city and the ever-changing road system has had dramatic impact on the physical deterioration of the historic fabric of the city. One of the most intense impacts came with the construction and reconstruction of the Interstate 75/85 Connector running north to south through the center of downtown. This research examines impacts of the construction of the interstate in the 1950s and the reconstruction in the 1980s to determine the level of physical deterioration in three historic neighborhoods. Data collected on building use, vacancy rates, and owner-occupancy rates are used to answer the question: did the land use and occupancy of lots in historic neighborhoods change as a result of Atlanta&#x27;s 75/85 Connector, and if so how enduring were these changes? Data from the study shows that due to the creation of the Connector, a temporary rise in vacancy and decrease in residential rates occurred, couple with lasting increased commercial rates and decreased owner-occupancy. The study also found that the placement of the Connector impacted the degree of change in these data sets.","abstract_has_math":false,"creators":["Darnell, Caroline"],"institution":null,"degree_name":"Master of Science (MS)","degree_level":"Thesis","degree_discipline":"Historic Preservation","degree_department":null,"school":null,"contributors":["Barry Stiefel, Committee Chair","Amalia Leifeste","Benjamin Traywick"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T07:15:06Z","subjects":["Atlanta","Georgia","Historic Preservation","Interstate","Mechanicsville","South Atlanta","Sweet Auburn"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://open.clemson.edu/all_theses/2615","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://open.clemson.edu/all_theses/2615","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://open.clemson.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopen.clemson.edu%3Aall_theses-3622","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Barry Stiefel, Committee Chair","Amalia Leifeste","Benjamin Traywick"]},{"key":"dc:creator","label":"Author","values":["Darnell, Caroline"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["2017-05-01T07:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Historic Preservation"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Atlanta","Georgia","Historic Preservation","Interstate","Mechanicsville","South Atlanta","Sweet Auburn"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://open.clemson.edu/all_theses/2615"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As a response to growing traffic in Atlanta, almost constant road work has been occurring in the city for the past 75 years. The growth of the city and the ever-changing road system has had dramatic impact on the physical deterioration of the historic fabric of the city. One of the most intense impacts came with the construction and reconstruction of the Interstate 75/85 Connector running north to south through the center of downtown. This research examines impacts of the construction of the interstate in the 1950s and the reconstruction in the 1980s to determine the level of physical deterioration in three historic neighborhoods. Data collected on building use, vacancy rates, and owner-occupancy rates are used to answer the question: did the land use and occupancy of lots in historic neighborhoods change as a result of Atlanta's 75/85 Connector, and if so how enduring were these changes? Data from the study shows that due to the creation of the Connector, a temporary rise in vacancy and decrease in residential rates occurred, couple with lasting increased commercial rates and decreased owner-occupancy. The study also found that the placement of the Connector impacted the degree of change in these data sets."]},{"key":"dc:title","label":"Title","values":["Connector or Disconnector: Analyzing Impacts of the Interstate 75/85 Connector on Historic Neighborhoods in Atlanta, Georgia"]}]}],"canonical_facts":{"dc:contributor":["Barry Stiefel, Committee Chair","Amalia Leifeste","Benjamin Traywick"],"dc:creator":["Darnell, Caroline"],"dc:date.created":["2017-05-01T07:00:00Z"],"dc:description.abstract":["As a response to growing traffic in Atlanta, almost constant road work has been occurring in the city for the past 75 years. The growth of the city and the ever-changing road system has had dramatic impact on the physical deterioration of the historic fabric of the city. One of the most intense impacts came with the construction and reconstruction of the Interstate 75/85 Connector running north to south through the center of downtown. This research examines impacts of the construction of the interstate in the 1950s and the reconstruction in the 1980s to determine the level of physical deterioration in three historic neighborhoods. Data collected on building use, vacancy rates, and owner-occupancy rates are used to answer the question: did the land use and occupancy of lots in historic neighborhoods change as a result of Atlanta's 75/85 Connector, and if so how enduring were these changes? Data from the study shows that due to the creation of the Connector, a temporary rise in vacancy and decrease in residential rates occurred, couple with lasting increased commercial rates and decreased owner-occupancy. The study also found that the placement of the Connector impacted the degree of change in these data sets."],"dc:identifier":["https://open.clemson.edu/all_theses/2615"],"dc:subject":["Atlanta","Georgia","Historic Preservation","Interstate","Mechanicsville","South Atlanta","Sweet Auburn"],"dc:title":["Connector or Disconnector: Analyzing Impacts of the Interstate 75/85 Connector on Historic Neighborhoods in Atlanta, Georgia"],"thesis:degree_discipline":["Historic Preservation"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T07:15:06Z"}