{"id":{"repo_id":"cornell","oai_identifier":"oai:ecommons.cornell.edu:1813/43653"},"canonical_url":"https://search.ndltd.org/etd/cornell/oai:ecommons.cornell.edu:1813/43653","repository":{"repo_id":"cornell","name":"Cornell University","base_url":"https://ecommons.cornell.edu/server/oai/request"},"display":{"title":"Work Zone Analysis Under Detour Settings","abstract":"A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction.","abstract_html":"A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction.","abstract_has_math":false,"creators":["Huang, Kai"],"institution":"Cornell University","degree_name":"M.S., Civil and Environmental Engineering","degree_level":"Master of Science","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":["Nozick,Linda K."],"committee_members":["Gao,Huaizhu"],"year":2016,"date_issued":"2016-02-01","date_published":"2016-02-01","updated_at":"2026-11-19T03:19:03Z","subjects":["road user cost","work zone","user delay"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.bibid","label":"Dc Identifier Bibid","values":["9597127"],"render_values":[{"text":"9597127","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1813/43653","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1813/43653","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://ecommons.cornell.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aecommons.cornell.edu%3A1813%2F43653","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.chair","label":"Chair","values":["Nozick,Linda K."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Gao,Huaizhu"]},{"key":"dc:creator","label":"Author","values":["Huang, Kai"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-04-04T18:05:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2021-02-01T07:00:26Z"]},{"key":"dc:date.issued","label":"Date","values":["2016-02-01"]},{"key":"dc:type","label":"Dc Type","values":["dissertation or thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master of Science"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S., Civil and Environmental Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Cornell University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["road user cost","work zone","user delay"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.bibid","label":"Dc Identifier Bibid","values":["9597127"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1813/43653"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"06a25e14-0be0-40a3-b938-d6b292838649\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en_US</Language> <Title>Work Zone Analysis Under Detour Settings</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2016-02-01</PublicationDate> <Authors> <Author> <DisplayName>Huang, Kai</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>road user cost</Keyword> <Keyword>work zone</Keyword> <Keyword>user delay</Keyword> <Abstract>A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"cris:virtual.author","label":"Cris Virtual Author","values":["Huang, Kai"]},{"key":"cris:virtualsource.collection","label":"Cris Virtualsource Collection","values":["5893a6ea-7af3-41d7-abc6-04bcd26ab5df"]},{"key":"dc:description.abstract","label":"Abstract","values":["A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction."]},{"key":"dc:description.collection","label":"Dc Description Collection","values":["Cornell Theses and Dissertations"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Work Zone Analysis Under Detour Settings"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"06a25e14-0be0-40a3-b938-d6b292838649\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en_US</Language> <Title>Work Zone Analysis Under Detour Settings</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2016-02-01</PublicationDate> <Authors> <Author> <DisplayName>Huang, Kai</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>road user cost</Keyword> <Keyword>work zone</Keyword> <Keyword>user delay</Keyword> <Abstract>A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"cris:virtual.author":["Huang, Kai"],"cris:virtualsource.collection":["5893a6ea-7af3-41d7-abc6-04bcd26ab5df"],"dc:contributor.chair":["Nozick,Linda K."],"dc:contributor.committeemember":["Gao,Huaizhu"],"dc:creator":["Huang, Kai"],"dc:date.accessioned":["2016-04-04T18:05:42Z"],"dc:date.available":["2021-02-01T07:00:26Z"],"dc:date.issued":["2016-02-01"],"dc:description.abstract":["A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The total work zone cost consists of total delay cost, work zone set-up cost and accident cost. The analysis is based on an illustrative transportation network, the Sioux-Falls network. The total delay cost is calculated using User Equilibrium assignment to distribute all the traffic. To solve for User Equilibrium, the Frank-Wolfe algorithm is implemented via Matlab. The total delay cost is then converted to a monetary value using value of time (VOT). The work zone set-up cost and accident cost relate to number of work zone segments and total length of work zone. This thesis illustrates the importance of considering the opportunity for detours when considering the design of work zones for road construction."],"dc:description.collection":["Cornell Theses and Dissertations"],"dc:format.mimetype":["application/pdf"],"dc:identifier.bibid":["9597127"],"dc:identifier.uri":["https://hdl.handle.net/1813/43653"],"dc:language.iso":["en_US"],"dc:subject":["road user cost","work zone","user delay"],"dc:title":["Work Zone Analysis Under Detour Settings"],"dc:type":["dissertation or thesis"],"dspace:entity.type":["Publication"],"others:access_status":["open.access"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Master of Science"],"thesis:degree_name":["M.S., Civil and Environmental Engineering"],"thesis:institution_name":["Cornell University"]},"updated_at":"2026-11-19T03:19:03Z"}