{"id":{"repo_id":"cranfield","oai_identifier":"oai:dspace.lib.cranfield.ac.uk:1826/8439"},"canonical_url":"https://search.ndltd.org/etd/cranfield/oai:dspace.lib.cranfield.ac.uk:1826/8439","repository":{"repo_id":"cranfield","name":"Cranfield University","base_url":"https://dspace.lib.cranfield.ac.uk/server/oai/request"},"display":{"title":"Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process","abstract":"In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters.","abstract_html":"In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters.","abstract_has_math":false,"creators":["Li, Jin"],"institution":"Cranfield University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Sreenuch, Tarapong","Tsourdos, Antonios"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-11","date_published":"2013-11","updated_at":"2026-11-26T14:21:51Z","subjects":["Aircraft Assembly","Condition Based Maintenance","Agent Based Simulation","Multi-Objective Optimization"],"languages":["en"],"rights":["© Cranfield University 2013. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://dspace.lib.cranfield.ac.uk/handle/1826/8439","outbound_label":"Repository record","outbound_source":"dc:identifier.uri","record_url":"http://dspace.lib.cranfield.ac.uk/handle/1826/8439","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Acranfield%3Aoai%3Adspace.lib.cranfield.ac.uk%3A1826%2F8439","prefix":"oai_dc"},"source_record":{"url":"https://dspace.lib.cranfield.ac.uk/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.lib.cranfield.ac.uk%3A1826%2F8439","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sreenuch, Tarapong","Tsourdos, Antonios"]},{"key":"dc:creator","label":"Author","values":["Li, Jin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-05-08T16:24:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-05-08T16:24:38Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-11"]},{"key":"dc:publisher","label":"Institution","values":["Cranfield University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis or dissertation"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["Masters"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["MSc by Research"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Aircraft Assembly","Condition Based Maintenance","Agent Based Simulation","Multi-Objective Optimization"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["© Cranfield University 2013. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://dspace.lib.cranfield.ac.uk/handle/1826/8439"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters."]},{"key":"dc:title","label":"Title","values":["Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sreenuch, Tarapong","Tsourdos, Antonios"],"dc:creator":["Li, Jin"],"dc:date.accessioned":["2014-05-08T16:24:38Z"],"dc:date.available":["2014-05-08T16:24:38Z"],"dc:date.issued":["2013-11"],"dc:description.abstract":["In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters."],"dc:identifier.uri":["http://dspace.lib.cranfield.ac.uk/handle/1826/8439"],"dc:language.iso":["en"],"dc:publisher":["Cranfield University"],"dc:rights":["© Cranfield University 2013. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner."],"dc:subject":["Aircraft Assembly","Condition Based Maintenance","Agent Based Simulation","Multi-Objective Optimization"],"dc:title":["Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process"],"dc:type":["Thesis or dissertation"],"dc:type.qualificationlevel":["Masters"],"dc:type.qualificationname":["MSc by Research"],"others:access_status":["open.access"]},"updated_at":"2026-11-26T14:21:51Z"}