{"id":{"repo_id":"ets-quebec","oai_identifier":"oai:espace.etsmtl.ca:3902"},"canonical_url":"https://search.ndltd.org/etd/ets-quebec/oai:espace.etsmtl.ca:3902","repository":{"repo_id":"ets-quebec","name":"ETS (Quebec)","base_url":"https://espace.etsmtl.ca/cgi/oai2"},"display":{"title":"A graph-based method for semi-automating clash grouping and resolution in BIM-based multidisciplinary coordination","abstract":"Efficient multidisciplinary coordination is essential to avoid conflicts between building components. While Building Information Modeling (BIM) is widely used for automated clash detection, clash resolution remains largely manual and time-consuming, limiting the effectiveness of current BIM-based coordination workflows. This research presents a method that makes clash management more effective by using both BIM data and graph theory. The process turns clash data into a network of components and their relationships, allowing clashes to be reviewed as groups instead of individually. With this approach, building elements are ranked by how easily they can be moved, related clashes are grouped, and repetitive conflict patterns are found. This results in a list of elements that can be moved to resolve clashes in each group. This method can help coordinators focus on the most critical clash groups and reduces redundant design modifications by addressing related clashes collectively. The application of the method in real-world case studies demonstrates its potential to support a more structured and informed BIM-based coordination process. The results show that representing clash relationships using graph models improves the understanding of interdependencies between building systems and supports a more systematic approach to clash resolution.","abstract_html":"Efficient multidisciplinary coordination is essential to avoid conflicts between building components. While Building Information Modeling (BIM) is widely used for automated clash detection, clash resolution remains largely manual and time-consuming, limiting the effectiveness of current BIM-based coordination workflows. This research presents a method that makes clash management more effective by using both BIM data and graph theory. The process turns clash data into a network of components and their relationships, allowing clashes to be reviewed as groups instead of individually. With this approach, building elements are ranked by how easily they can be moved, related clashes are grouped, and repetitive conflict patterns are found. This results in a list of elements that can be moved to resolve clashes in each group. This method can help coordinators focus on the most critical clash groups and reduces redundant design modifications by addressing related clashes collectively. The application of the method in real-world case studies demonstrates its potential to support a more structured and informed BIM-based coordination process. The results show that representing clash relationships using graph models improves the understanding of interdependencies between building systems and supports a more systematic approach to clash resolution.","abstract_has_math":false,"creators":["Karimi, Farnaz"],"institution":"École de technologie supérieure","degree_name":"Mémoire de maîtrise électronique","degree_level":"masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2026,"date_issued":"2026-04-23","date_published":"2026-04-23","updated_at":"2026-11-18T22:11:16Z","subjects":["modélisation des informations du bâtiment (BIM), coordination multidisciplinaire, gestion des conflits, théorie des graphes, résolution des conflits"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["INSERT-YOUR-LIBRARY-ID-HERE3902"],"render_values":[{"text":"INSERT-YOUR-LIBRARY-ID-HERE3902","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://espace.etsmtl.ca/id/eprint/3902/1/KARIMI_Farnaz.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://espace.etsmtl.ca/cgi/oai2?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aespace.etsmtl.ca%3A3902","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Karimi, Farnaz"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2026-04-23"]},{"key":"dc:publisher","label":"Institution","values":["École de technologie supérieure"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Mémoire de maîtrise électronique"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["École de technologie supérieure"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["modélisation des informations du bâtiment (BIM), coordination multidisciplinaire, gestion des conflits, théorie des graphes, résolution des conflits"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["INSERT-YOUR-LIBRARY-ID-HERE3902","https://espace.etsmtl.ca/id/eprint/3902/1/KARIMI_Farnaz.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Efficient multidisciplinary coordination is essential to avoid conflicts between building components. While Building Information Modeling (BIM) is widely used for automated clash detection, clash resolution remains largely manual and time-consuming, limiting the effectiveness of current BIM-based coordination workflows. This research presents a method that makes clash management more effective by using both BIM data and graph theory. The process turns clash data into a network of components and their relationships, allowing clashes to be reviewed as groups instead of individually. With this approach, building elements are ranked by how easily they can be moved, related clashes are grouped, and repetitive conflict patterns are found. This results in a list of elements that can be moved to resolve clashes in each group. This method can help coordinators focus on the most critical clash groups and reduces redundant design modifications by addressing related clashes collectively. The application of the method in real-world case studies demonstrates its potential to support a more structured and informed BIM-based coordination process. The results show that representing clash relationships using graph models improves the understanding of interdependencies between building systems and supports a more systematic approach to clash resolution."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["A graph-based method for semi-automating clash grouping and resolution in BIM-based multidisciplinary coordination"]}]}],"canonical_facts":{"dc:creator":["Karimi, Farnaz"],"dc:date":["2026-04-23"],"dc:description":["Efficient multidisciplinary coordination is essential to avoid conflicts between building components. While Building Information Modeling (BIM) is widely used for automated clash detection, clash resolution remains largely manual and time-consuming, limiting the effectiveness of current BIM-based coordination workflows. This research presents a method that makes clash management more effective by using both BIM data and graph theory. The process turns clash data into a network of components and their relationships, allowing clashes to be reviewed as groups instead of individually. With this approach, building elements are ranked by how easily they can be moved, related clashes are grouped, and repetitive conflict patterns are found. This results in a list of elements that can be moved to resolve clashes in each group. This method can help coordinators focus on the most critical clash groups and reduces redundant design modifications by addressing related clashes collectively. The application of the method in real-world case studies demonstrates its potential to support a more structured and informed BIM-based coordination process. The results show that representing clash relationships using graph models improves the understanding of interdependencies between building systems and supports a more systematic approach to clash resolution."],"dc:format":["application/pdf"],"dc:identifier":["INSERT-YOUR-LIBRARY-ID-HERE3902","https://espace.etsmtl.ca/id/eprint/3902/1/KARIMI_Farnaz.pdf"],"dc:language":["en"],"dc:publisher":["École de technologie supérieure"],"dc:subject":["modélisation des informations du bâtiment (BIM), coordination multidisciplinaire, gestion des conflits, théorie des graphes, résolution des conflits"],"dc:title":["A graph-based method for semi-automating clash grouping and resolution in BIM-based multidisciplinary coordination"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_level":["masters"],"thesis:degree_name":["Mémoire de maîtrise électronique"],"thesis:institution_name":["École de technologie supérieure"]},"updated_at":"2026-11-18T22:11:16Z"}