{"id":{"repo_id":"etsu","oai_identifier":"oai:dc.etsu.edu:etd-6228"},"canonical_url":"https://search.ndltd.org/etd/etsu/oai:dc.etsu.edu:etd-6228","repository":{"repo_id":"etsu","name":"East Tennessee State University","base_url":"https://dc.etsu.edu/do/oai/"},"display":{"title":"A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects","abstract":"To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates.","abstract_html":"To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates.","abstract_has_math":false,"creators":["Paul, Pritom"],"institution":"East Tennessee State University","degree_name":"MS (Master of Science)","degree_level":"Thesis - unrestricted","degree_discipline":"Engineering Technology","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2026,"date_issued":"2026-05-01T07:00:00Z","date_published":"2026-05-01T07:00:00Z","updated_at":"2026-11-19T07:57:30Z","subjects":["Preliminary Estimate","Conceptual Estimate","Parametric","Machine Learning; Roadway Construction Cost; Tennessee Department of Transportation (TDOT )","Civil and Environmental Engineering","Civil Engineering","Construction Engineering","Construction Engineering and Management"],"languages":["eng"],"rights":["Copyright by the authors."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://dc.etsu.edu/etd/4697","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://dc.etsu.edu/etd/4697","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":"https://dc.etsu.edu/context/etd/article/6228/viewcontent/PaulP043026f.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://dc.etsu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adc.etsu.edu%3Aetd-6228","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Paul, Pritom"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2026-04-02T07:00:00Z"]},{"key":"dc:date.issued","label":"Date","values":["2026-05-01T07:00:00Z"]},{"key":"dc:publisher","label":"Institution","values":["East Tennessee State University"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering Technology"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis - unrestricted"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS (Master of Science)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["East Tennessee State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Preliminary Estimate","Conceptual Estimate","Parametric","Machine Learning; Roadway Construction Cost; Tennessee Department of Transportation (TDOT )","Civil and Environmental Engineering","Civil Engineering","Construction Engineering","Construction Engineering and Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["Copyright by the authors."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://dc.etsu.edu/context/etd/article/6228/viewcontent/PaulP043026f.pdf","https://dc.etsu.edu/etd/4697"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates."]},{"key":"dc:title","label":"Title","values":["A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects"]}]}],"canonical_facts":{"dc:creator":["Paul, Pritom"],"dc:date.available":["2026-04-02T07:00:00Z"],"dc:date.issued":["2026-05-01T07:00:00Z"],"dc:description.abstract":["To address the limitations of traditional planning-level cost estimating methods, such as reliance on statewide averages, heavy reliance on engineering judgment, and high levels of inaccuracy, this study developed two data-driven frameworks and corresponding tools. The first framework focused on resurfacing projects and used treatment-specific simple linear regression based on lane miles and geographic location. The second addressed a broader group of construction projects and used multiple linear regression with project length, route type, and right-of-way cost as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed weaker performance, with an overall MAPE of 143.91% and MPE of 106.04%. Both frameworks produced estimates that generally align with industry standards for the expected accuracy of early-stage cost estimates."],"dc:identifier":["https://dc.etsu.edu/context/etd/article/6228/viewcontent/PaulP043026f.pdf","https://dc.etsu.edu/etd/4697"],"dc:language":["eng"],"dc:publisher":["East Tennessee State University"],"dc:rights":["Copyright by the authors."],"dc:subject":["Preliminary Estimate","Conceptual Estimate","Parametric","Machine Learning; Roadway Construction Cost; Tennessee Department of Transportation (TDOT )","Civil and Environmental Engineering","Civil Engineering","Construction Engineering","Construction Engineering and Management"],"dc:title":["A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects"],"thesis:degree_discipline":["Engineering Technology"],"thesis:degree_level":["Thesis - unrestricted"],"thesis:degree_name":["MS (Master of Science)"],"thesis:institution_name":["East Tennessee State University"]},"updated_at":"2026-11-19T07:57:30Z"}