{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/24633"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/24633","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Impact to alternative contracting methods using multivariate analysis in the regulatory environment","abstract":"This research addresses legislative impediments inherent to working in the government construction industry by investigating whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in detail the four primary types and how they function. The research then provides a qualitative study that presents the perceived advantages and disadvantages of each method. Then, a second literature review provides an overview of previously published research in project delivery method selection, and examines federal and state legislative trends to establish the growing debate associated with alternative project delivery methods, focusing on the design-build method of project delivery. Finally, a quantitative analysis is presented to test whether federal and state legislative limitations influence the realization of any benefits of alternative project delivery methods, and specifically design-build, for federal projects. Project characteristics from the U.S. General Services Administration Capital Construction Project database are tested. The research suggests that when an alternative project delivery method, specifically design-build, is chosen, there are benefits in time and cost savings, and the ability to use the alternative project delivery method is affected by the removal of federal and state legislative impediments.","abstract_html":"This research addresses legislative impediments inherent to working in the government construction industry by investigating whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in detail the four primary types and how they function. The research then provides a qualitative study that presents the perceived advantages and disadvantages of each method. Then, a second literature review provides an overview of previously published research in project delivery method selection, and examines federal and state legislative trends to establish the growing debate associated with alternative project delivery methods, focusing on the design-build method of project delivery. Finally, a quantitative analysis is presented to test whether federal and state legislative limitations influence the realization of any benefits of alternative project delivery methods, and specifically design-build, for federal projects. Project characteristics from the U.S. General Services Administration Capital Construction Project database are tested. The research suggests that when an alternative project delivery method, specifically design-build, is chosen, there are benefits in time and cost savings, and the ability to use the alternative project delivery method is affected by the removal of federal and state legislative impediments.","abstract_has_math":false,"creators":["Smith, Valerie Rose Riecke"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Oberle, Rita A.","Castro-Lacouture, Daniel"],"committee_chairs":[],"committee_members":["Bluestein, Fradya","Dobbins, Michael","Roper, Kathy O."],"year":2008,"date_issued":"2008-06-24","date_published":"2008-06-24","updated_at":"2026-11-19T05:10:11Z","subjects":["Construction contracting","Legislative impediments","Public policy","Procurement","Design build","Project delivery","Construction projects","Project management","Public administration","Building Law and legislation","Public works"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/24633","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/24633","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F24633","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Oberle, Rita A.","Castro-Lacouture, Daniel"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Bluestein, Fradya","Dobbins, Michael","Roper, Kathy O."]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Smith, Valerie Rose Riecke"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2008-09-17T19:26:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2008-09-17T19:26:34Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-06-24"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6d614946-815e-49ef-b07a-ccf3260a0846"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Doctor of Philosophy with a Major in Architecture"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["1e9dd6c5-039f-4195-b3b6-bc27d2df5b9f"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction contracting","Legislative impediments","Public policy","Procurement","Design build","Project delivery"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Construction projects","Project management","Public administration","Building Law and legislation","Public works"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/24633"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research addresses legislative impediments inherent to working in the government construction industry by investigating whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in detail the four primary types and how they function. The research then provides a qualitative study that presents the perceived advantages and disadvantages of each method. Then, a second literature review provides an overview of previously published research in project delivery method selection, and examines federal and state legislative trends to establish the growing debate associated with alternative project delivery methods, focusing on the design-build method of project delivery. Finally, a quantitative analysis is presented to test whether federal and state legislative limitations influence the realization of any benefits of alternative project delivery methods, and specifically design-build, for federal projects. Project characteristics from the U.S. General Services Administration Capital Construction Project database are tested. The research suggests that when an alternative project delivery method, specifically design-build, is chosen, there are benefits in time and cost savings, and the ability to use the alternative project delivery method is affected by the removal of federal and state legislative impediments."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:title","label":"Title","values":["Impact to alternative contracting methods using multivariate analysis in the regulatory environment"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Oberle, Rita A.","Castro-Lacouture, Daniel"],"dc:contributor.committeemember":["Bluestein, Fradya","Dobbins, Michael","Roper, Kathy O."],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Smith, Valerie Rose Riecke"],"dc:date.accessioned":["2008-09-17T19:26:34Z"],"dc:date.available":["2008-09-17T19:26:34Z"],"dc:date.issued":["2008-06-24"],"dc:description.abstract":["This research addresses legislative impediments inherent to working in the government construction industry by investigating whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in detail the four primary types and how they function. The research then provides a qualitative study that presents the perceived advantages and disadvantages of each method. Then, a second literature review provides an overview of previously published research in project delivery method selection, and examines federal and state legislative trends to establish the growing debate associated with alternative project delivery methods, focusing on the design-build method of project delivery. Finally, a quantitative analysis is presented to test whether federal and state legislative limitations influence the realization of any benefits of alternative project delivery methods, and specifically design-build, for federal projects. Project characteristics from the U.S. General Services Administration Capital Construction Project database are tested. The research suggests that when an alternative project delivery method, specifically design-build, is chosen, there are benefits in time and cost savings, and the ability to use the alternative project delivery method is affected by the removal of federal and state legislative impediments."],"dc:description.degree":["Ph.D."],"dc:identifier.uri":["http://hdl.handle.net/1853/24633"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["6d614946-815e-49ef-b07a-ccf3260a0846"],"dc:relation.ispartofseries":["Doctor of Philosophy with a Major in Architecture"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["1e9dd6c5-039f-4195-b3b6-bc27d2df5b9f"],"dc:subject":["Construction contracting","Legislative impediments","Public policy","Procurement","Design build","Project delivery"],"dc:subject.lcsh":["Construction projects","Project management","Public administration","Building Law and legislation","Public works"],"dc:title":["Impact to alternative contracting methods using multivariate analysis in the regulatory environment"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T05:10:11Z"}