{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/28204"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/28204","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Comparison of module usage of project management information system and success rate of construction projects: case study","abstract":"If construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure.","abstract_html":"If construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure.","abstract_has_math":false,"creators":["Sweet, Coretta A."],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Thomas, Linda"],"committee_chairs":[],"committee_members":["Castro-Lacouture, Daniel","Roper, Kathy O.","Smith, Ron L."],"year":2009,"date_issued":"2009-04-09","date_published":"2009-04-09","updated_at":"2026-11-19T06:05:38Z","subjects":["Module","Prolog manager","Project management information system","Project management","Computer programs"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/28204","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/28204","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F28204","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Thomas, Linda"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Castro-Lacouture, Daniel","Roper, Kathy O.","Smith, Ron L."]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Sweet, Coretta A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2009-06-08T19:28:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2009-06-08T19:28:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-04-09"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Module","Prolog manager","Project management information system"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Project management","Computer programs"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/28204"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["If construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:title","label":"Title","values":["Comparison of module usage of project management information system and success rate of construction projects: case study"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Thomas, Linda"],"dc:contributor.committeemember":["Castro-Lacouture, Daniel","Roper, Kathy O.","Smith, Ron L."],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Sweet, Coretta A."],"dc:date.accessioned":["2009-06-08T19:28:12Z"],"dc:date.available":["2009-06-08T19:28:12Z"],"dc:date.issued":["2009-04-09"],"dc:description.abstract":["If construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure."],"dc:description.degree":["M.S."],"dc:identifier.uri":["http://hdl.handle.net/1853/28204"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Module","Prolog manager","Project management information system"],"dc:subject.lcsh":["Project management","Computer programs"],"dc:title":["Comparison of module usage of project management information system and success rate of construction projects: case study"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T06:05:38Z"}