{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/28232"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/28232","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Operating strategies to preserve the adequacy of power systems circuit breakers","abstract":"The objective of the proposed research is to quantify the limits of overstressed and aging circuit breakers in terms of probability of failure and to provide guidelines to determine network reconfigurations, generator commitment, and economic dispatch strategies that account for these limits. The proposed temporary power system operating strategies address circuit breaker adequacy issues and allow overstressed breakers to be operated longer and more reliably until they are replaced with adequate equipment. The expansion of electric networks with new power sources (nuclear plants, distributed generation) results in increased short-circuit or fault currents levels. As fault currents increase, they will eventually exceed circuit breaker ratings. Circuit breakers exposed to fault currents in excess of their ratings are said to be overstressed, underrated, or inadequate. Insufficient ratings expose overstressed breakers to increased failure probabilities. Extensive common-mode outages caused by circuit breaker failures reduce the reliability of power systems. To durably avoid outages and system unreliability, overstressed breakers must eventually be replaced. Large-scale replacements of overstressed breakers cannot be completed in a short time because of budgetary limits, capital improvement schedules, and manufacturer-imposed constraints. Meanwhile, to preserve the ability of old and overstressed breakers to safely interrupt faults, short-circuit currents must be kept within the limits imposed by the ratings and the age of these breakers by using the substation reconfiguration and generator commitment strategies described in this study. The immediate benefit of the above-mentioned operating strategies is a reduction of the failure probability of overstressed breakers obtained by avoiding the interruption of currents in excess of breaker ratings. Other benefits include (i) increased network reliability, (ii) restored operating margins with respect to existing equipment, and (iii) prioritized equipment upgrades that enhance the long-term planning of power systems.","abstract_html":"The objective of the proposed research is to quantify the limits of overstressed and aging circuit breakers in terms of probability of failure and to provide guidelines to determine network reconfigurations, generator commitment, and economic dispatch strategies that account for these limits. The proposed temporary power system operating strategies address circuit breaker adequacy issues and allow overstressed breakers to be operated longer and more reliably until they are replaced with adequate equipment. The expansion of electric networks with new power sources (nuclear plants, distributed generation) results in increased short-circuit or fault currents levels. As fault currents increase, they will eventually exceed circuit breaker ratings. Circuit breakers exposed to fault currents in excess of their ratings are said to be overstressed, underrated, or inadequate. Insufficient ratings expose overstressed breakers to increased failure probabilities. Extensive common-mode outages caused by circuit breaker failures reduce the reliability of power systems. To durably avoid outages and system unreliability, overstressed breakers must eventually be replaced. Large-scale replacements of overstressed breakers cannot be completed in a short time because of budgetary limits, capital improvement schedules, and manufacturer-imposed constraints. Meanwhile, to preserve the ability of old and overstressed breakers to safely interrupt faults, short-circuit currents must be kept within the limits imposed by the ratings and the age of these breakers by using the substation reconfiguration and generator commitment strategies described in this study. The immediate benefit of the above-mentioned operating strategies is a reduction of the failure probability of overstressed breakers obtained by avoiding the interruption of currents in excess of breaker ratings. Other benefits include (i) increased network reliability, (ii) restored operating margins with respect to existing equipment, and (iii) prioritized equipment upgrades that enhance the long-term planning of power systems.","abstract_has_math":false,"creators":["Dam, Quang Binh"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Electrical and Computer Engineering","school":null,"contributors":[],"advisors":["Meliopoulos, A. P. Sakis"],"committee_chairs":[],"committee_members":["Divan, Deepakraj M.","Harley, Ronald G.","Johnson, Ellis L.","Taylor, David G."],"year":2009,"date_issued":"2009-03-24","date_published":"2009-03-24","updated_at":"2026-11-19T03:56:08Z","subjects":["Life estimation","Fault currents","Circuit breakers","Power generation planning","Power system reliability","Electric circuit-breakers","Electric substations","Electric power distribution"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/28232","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/28232","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F28232","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Meliopoulos, A. P. Sakis"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Divan, Deepakraj M.","Harley, Ronald G.","Johnson, Ellis L.","Taylor, David G."]},{"key":"dc:contributor.department","label":"Department","values":["Electrical and Computer Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["School of Electrical and Computer Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["Dam, Quang Binh"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2009-06-08T19:30:24Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2009-06-08T19:30:24Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-03-24"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["e6c102d1-d39c-4d1d-9070-a8743be93cb5"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Doctor of Philosophy with a Major in Electrical and Computer Engineering"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["5b7adef2-447c-4270-b9fc-846bd76f80f2","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["3890cd56-8ecf-424b-8074-8f5ebd8dbe15"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Life estimation","Fault currents","Circuit breakers","Power generation planning","Power system reliability"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Electric circuit-breakers","Electric substations","Electric power distribution"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/28232"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The objective of the proposed research is to quantify the limits of overstressed and aging circuit breakers in terms of probability of failure and to provide guidelines to determine network reconfigurations, generator commitment, and economic dispatch strategies that account for these limits. The proposed temporary power system operating strategies address circuit breaker adequacy issues and allow overstressed breakers to be operated longer and more reliably until they are replaced with adequate equipment. The expansion of electric networks with new power sources (nuclear plants, distributed generation) results in increased short-circuit or fault currents levels. As fault currents increase, they will eventually exceed circuit breaker ratings. Circuit breakers exposed to fault currents in excess of their ratings are said to be overstressed, underrated, or inadequate. Insufficient ratings expose overstressed breakers to increased failure probabilities. Extensive common-mode outages caused by circuit breaker failures reduce the reliability of power systems. To durably avoid outages and system unreliability, overstressed breakers must eventually be replaced. Large-scale replacements of overstressed breakers cannot be completed in a short time because of budgetary limits, capital improvement schedules, and manufacturer-imposed constraints. Meanwhile, to preserve the ability of old and overstressed breakers to safely interrupt faults, short-circuit currents must be kept within the limits imposed by the ratings and the age of these breakers by using the substation reconfiguration and generator commitment strategies described in this study. The immediate benefit of the above-mentioned operating strategies is a reduction of the failure probability of overstressed breakers obtained by avoiding the interruption of currents in excess of breaker ratings. Other benefits include (i) increased network reliability, (ii) restored operating margins with respect to existing equipment, and (iii) prioritized equipment upgrades that enhance the long-term planning of power systems."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:title","label":"Title","values":["Operating strategies to preserve the adequacy of power systems circuit breakers"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Meliopoulos, A. P. Sakis"],"dc:contributor.committeemember":["Divan, Deepakraj M.","Harley, Ronald G.","Johnson, Ellis L.","Taylor, David G."],"dc:contributor.department":["Electrical and Computer Engineering"],"dc:contributor.other":["School of Electrical and Computer Engineering","College of Engineering"],"dc:creator":["Dam, Quang Binh"],"dc:date.accessioned":["2009-06-08T19:30:24Z"],"dc:date.available":["2009-06-08T19:30:24Z"],"dc:date.issued":["2009-03-24"],"dc:description.abstract":["The objective of the proposed research is to quantify the limits of overstressed and aging circuit breakers in terms of probability of failure and to provide guidelines to determine network reconfigurations, generator commitment, and economic dispatch strategies that account for these limits. The proposed temporary power system operating strategies address circuit breaker adequacy issues and allow overstressed breakers to be operated longer and more reliably until they are replaced with adequate equipment. The expansion of electric networks with new power sources (nuclear plants, distributed generation) results in increased short-circuit or fault currents levels. As fault currents increase, they will eventually exceed circuit breaker ratings. Circuit breakers exposed to fault currents in excess of their ratings are said to be overstressed, underrated, or inadequate. Insufficient ratings expose overstressed breakers to increased failure probabilities. Extensive common-mode outages caused by circuit breaker failures reduce the reliability of power systems. To durably avoid outages and system unreliability, overstressed breakers must eventually be replaced. Large-scale replacements of overstressed breakers cannot be completed in a short time because of budgetary limits, capital improvement schedules, and manufacturer-imposed constraints. Meanwhile, to preserve the ability of old and overstressed breakers to safely interrupt faults, short-circuit currents must be kept within the limits imposed by the ratings and the age of these breakers by using the substation reconfiguration and generator commitment strategies described in this study. The immediate benefit of the above-mentioned operating strategies is a reduction of the failure probability of overstressed breakers obtained by avoiding the interruption of currents in excess of breaker ratings. Other benefits include (i) increased network reliability, (ii) restored operating margins with respect to existing equipment, and (iii) prioritized equipment upgrades that enhance the long-term planning of power systems."],"dc:description.degree":["Ph.D."],"dc:identifier.uri":["http://hdl.handle.net/1853/28232"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["e6c102d1-d39c-4d1d-9070-a8743be93cb5"],"dc:relation.ispartofseries":["Doctor of Philosophy with a Major in Electrical and Computer Engineering"],"dc:relation.orgunit":["5b7adef2-447c-4270-b9fc-846bd76f80f2","7c022d60-21d5-497c-b552-95e489a06569"],"dc:relation.seriesentity":["3890cd56-8ecf-424b-8074-8f5ebd8dbe15"],"dc:subject":["Life estimation","Fault currents","Circuit breakers","Power generation planning","Power system reliability"],"dc:subject.lcsh":["Electric circuit-breakers","Electric substations","Electric power distribution"],"dc:title":["Operating strategies to preserve the adequacy of power systems circuit breakers"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T03:56:08Z"}