{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/34748"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/34748","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Design build project delivery in the Air Force Reserve Command","abstract":"Design Build is rapidly becoming one of the most commonly used project delivery methods in the construction industry. The United States Corp of Engineers (USACE) has started implementing its own version of Design Build with the introduction of Military Transformation in April 2005. Per the Department of the Army (2008) Military Transformation is a term employed by the Corps to implement the use of alternate project delivery method as a means of achieving best value. The United States Air Force (AF) and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all future Military Construction Projects (MILCONs) executed when using the Design Build method. The use of this delivery method results in significant changes to the relationships between the various parties associated with facility project delivery compared to the traditional Design Bid Build method. AFRC construction project procedures and requirements must also change.","abstract_html":"Design Build is rapidly becoming one of the most commonly used project delivery methods in the construction industry. The United States Corp of Engineers (USACE) has started implementing its own version of Design Build with the introduction of Military Transformation in April 2005. Per the Department of the Army (2008) Military Transformation is a term employed by the Corps to implement the use of alternate project delivery method as a means of achieving best value. The United States Air Force (AF) and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all future Military Construction Projects (MILCONs) executed when using the Design Build method. The use of this delivery method results in significant changes to the relationships between the various parties associated with facility project delivery compared to the traditional Design Bid Build method. AFRC construction project procedures and requirements must also change.","abstract_has_math":false,"creators":["Richardson, Kathleen"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Castro-Lacouture, Daniel"],"committee_chairs":[],"committee_members":["McElroy, James","Roper, Kathy O."],"year":2009,"date_issued":"2009-07-01","date_published":"2009-07-01","updated_at":"2026-11-19T04:52:40Z","subjects":["Project delivery","Design build","MILCON transformation","Construction projects","Municipal engineering","Military construction operations"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/34748","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/34748","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F34748","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Castro-Lacouture, Daniel"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["McElroy, James","Roper, Kathy O."]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Richardson, Kathleen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2010-09-15T18:55:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2010-09-15T18:55:06Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-07-01"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6d614946-815e-49ef-b07a-ccf3260a0846"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Project delivery","Design build","MILCON transformation"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Construction projects","Municipal engineering","Military construction operations"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/34748"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Design Build is rapidly becoming one of the most commonly used project delivery methods in the construction industry. The United States Corp of Engineers (USACE) has started implementing its own version of Design Build with the introduction of Military Transformation in April 2005. Per the Department of the Army (2008) Military Transformation is a term employed by the Corps to implement the use of alternate project delivery method as a means of achieving best value. The United States Air Force (AF) and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all future Military Construction Projects (MILCONs) executed when using the Design Build method. The use of this delivery method results in significant changes to the relationships between the various parties associated with facility project delivery compared to the traditional Design Bid Build method. AFRC construction project procedures and requirements must also change."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:title","label":"Title","values":["Design build project delivery in the Air Force Reserve Command"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Castro-Lacouture, Daniel"],"dc:contributor.committeemember":["McElroy, James","Roper, Kathy O."],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Richardson, Kathleen"],"dc:date.accessioned":["2010-09-15T18:55:06Z"],"dc:date.available":["2010-09-15T18:55:06Z"],"dc:date.issued":["2009-07-01"],"dc:description.abstract":["Design Build is rapidly becoming one of the most commonly used project delivery methods in the construction industry. The United States Corp of Engineers (USACE) has started implementing its own version of Design Build with the introduction of Military Transformation in April 2005. Per the Department of the Army (2008) Military Transformation is a term employed by the Corps to implement the use of alternate project delivery method as a means of achieving best value. The United States Air Force (AF) and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all future Military Construction Projects (MILCONs) executed when using the Design Build method. The use of this delivery method results in significant changes to the relationships between the various parties associated with facility project delivery compared to the traditional Design Bid Build method. AFRC construction project procedures and requirements must also change."],"dc:description.degree":["M.S."],"dc:identifier.uri":["http://hdl.handle.net/1853/34748"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["6d614946-815e-49ef-b07a-ccf3260a0846"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Project delivery","Design build","MILCON transformation"],"dc:subject.lcsh":["Construction projects","Municipal engineering","Military construction operations"],"dc:title":["Design build project delivery in the Air Force Reserve Command"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T04:52:40Z"}