{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/39637"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/39637","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Optimization of automated float glass lines","abstract":"Motivated by operational issues in real-world glass manufacturing, this thesis addresses a problem of laying out and sequencing the orders so as to minimize wasted glass, called scrap. This optimization problem combines aspects of traditional cutting problems and traditional scheduling and sequencing problems. In so far as we know, the combination of cutting and scheduling has not been modeled, or solved. We propose a two-phase approach: snap construction and constructing cutting and offload schedules. Regarding the second phase problem, we introduce FGSP (float glass scheduling problem), and provide its solution structure, called coveys. We analyze simple sub-models of FGSP considering the main elements: time, unit, and width. For each model, we provide either a polynomial time algorithm or a proof of NP-completeness. Since FGSP is NP-complete, we propose a heuristic algorithm, Longest Unit First (LUF), and analyze the worst case performance of the algorithm in terms of the quality of solutions; the worst case performance bound is {1+(m-1)/m}+{1/3-1/(3m)} where m is the number of machines. It is 5/3 when m=2. For the real-world problem, we propose two different methods for snap construction, and we apply two main approaches to solve cutting and offloading schedules: an MIP approach and a heuristic approach. Our solution approach produces manufacturing yields greater than 99%; current practice is about 95%. This is a significant improvement and these high-yield solutions can save millions of dollars.","abstract_html":"Motivated by operational issues in real-world glass manufacturing, this thesis addresses a problem of laying out and sequencing the orders so as to minimize wasted glass, called scrap. This optimization problem combines aspects of traditional cutting problems and traditional scheduling and sequencing problems. In so far as we know, the combination of cutting and scheduling has not been modeled, or solved. We propose a two-phase approach: snap construction and constructing cutting and offload schedules. Regarding the second phase problem, we introduce FGSP (float glass scheduling problem), and provide its solution structure, called coveys. We analyze simple sub-models of FGSP considering the main elements: time, unit, and width. For each model, we provide either a polynomial time algorithm or a proof of NP-completeness. Since FGSP is NP-complete, we propose a heuristic algorithm, Longest Unit First (LUF), and analyze the worst case performance of the algorithm in terms of the quality of solutions; the worst case performance bound is {1+(m-1)/m}+{1/3-1/(3m)} where m is the number of machines. It is 5/3 when m=2. For the real-world problem, we propose two different methods for snap construction, and we apply two main approaches to solve cutting and offloading schedules: an MIP approach and a heuristic approach. Our solution approach produces manufacturing yields greater than 99%; current practice is about 95%. This is a significant improvement and these high-yield solutions can save millions of dollars.","abstract_has_math":false,"creators":["Na, Byungsoo"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":["Ahmed, Shabbir","Nemhauser, George L.","Sokol, Joel S."],"committee_chairs":[],"committee_members":["Ferguson, Mark","Parker, Gary"],"year":2010,"date_issued":"2010-12-20","date_published":"2010-12-20","updated_at":"2026-11-19T05:09:45Z","subjects":["Optimization","Cyclic schedule","Cutting","Scheduling","Float line","Glass","Heuristics","Heuristic algorithms","Programming (Mathematics)","Production scheduling"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/39637","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/39637","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F39637","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ahmed, Shabbir","Nemhauser, George L.","Sokol, Joel S."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Ferguson, Mark","Parker, Gary"]},{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["Na, Byungsoo"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-07-06T16:49:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-07-06T16:49:04Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-12-20"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["cc31c1dc-5388-470a-9c3f-f8976a299674","fd687063-25e2-4172-bb19-8398f525e7c1"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Optimization","Cyclic schedule","Cutting","Scheduling","Float line","Glass","Heuristics"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Heuristic algorithms","Programming (Mathematics)","Production scheduling"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/39637"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Motivated by operational issues in real-world glass manufacturing, this thesis addresses a problem of laying out and sequencing the orders so as to minimize wasted glass, called scrap. This optimization problem combines aspects of traditional cutting problems and traditional scheduling and sequencing problems. In so far as we know, the combination of cutting and scheduling has not been modeled, or solved. We propose a two-phase approach: snap construction and constructing cutting and offload schedules. Regarding the second phase problem, we introduce FGSP (float glass scheduling problem), and provide its solution structure, called coveys. We analyze simple sub-models of FGSP considering the main elements: time, unit, and width. For each model, we provide either a polynomial time algorithm or a proof of NP-completeness. Since FGSP is NP-complete, we propose a heuristic algorithm, Longest Unit First (LUF), and analyze the worst case performance of the algorithm in terms of the quality of solutions; the worst case performance bound is {1+(m-1)/m}+{1/3-1/(3m)} where m is the number of machines. It is 5/3 when m=2. For the real-world problem, we propose two different methods for snap construction, and we apply two main approaches to solve cutting and offloading schedules: an MIP approach and a heuristic approach. Our solution approach produces manufacturing yields greater than 99%; current practice is about 95%. This is a significant improvement and these high-yield solutions can save millions of dollars."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:title","label":"Title","values":["Optimization of automated float glass lines"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ahmed, Shabbir","Nemhauser, George L.","Sokol, Joel S."],"dc:contributor.committeemember":["Ferguson, Mark","Parker, Gary"],"dc:contributor.department":["Industrial and Systems Engineering"],"dc:contributor.other":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"],"dc:creator":["Na, Byungsoo"],"dc:date.accessioned":["2011-07-06T16:49:04Z"],"dc:date.available":["2011-07-06T16:49:04Z"],"dc:date.issued":["2010-12-20"],"dc:description.abstract":["Motivated by operational issues in real-world glass manufacturing, this thesis addresses a problem of laying out and sequencing the orders so as to minimize wasted glass, called scrap. This optimization problem combines aspects of traditional cutting problems and traditional scheduling and sequencing problems. In so far as we know, the combination of cutting and scheduling has not been modeled, or solved. We propose a two-phase approach: snap construction and constructing cutting and offload schedules. Regarding the second phase problem, we introduce FGSP (float glass scheduling problem), and provide its solution structure, called coveys. We analyze simple sub-models of FGSP considering the main elements: time, unit, and width. For each model, we provide either a polynomial time algorithm or a proof of NP-completeness. Since FGSP is NP-complete, we propose a heuristic algorithm, Longest Unit First (LUF), and analyze the worst case performance of the algorithm in terms of the quality of solutions; the worst case performance bound is {1+(m-1)/m}+{1/3-1/(3m)} where m is the number of machines. It is 5/3 when m=2. For the real-world problem, we propose two different methods for snap construction, and we apply two main approaches to solve cutting and offloading schedules: an MIP approach and a heuristic approach. Our solution approach produces manufacturing yields greater than 99%; current practice is about 95%. This is a significant improvement and these high-yield solutions can save millions of dollars."],"dc:description.degree":["Ph.D."],"dc:identifier.uri":["http://hdl.handle.net/1853/39637"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["cc31c1dc-5388-470a-9c3f-f8976a299674","fd687063-25e2-4172-bb19-8398f525e7c1"],"dc:relation.orgunit":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"],"dc:subject":["Optimization","Cyclic schedule","Cutting","Scheduling","Float line","Glass","Heuristics"],"dc:subject.lcsh":["Heuristic algorithms","Programming (Mathematics)","Production scheduling"],"dc:title":["Optimization of automated float glass lines"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T05:09:45Z"}