{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/39641"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/39641","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Scheduling problems for fractional airlines","abstract":"A column generation based approach is proposed to solve scheduling problems for fractional airlines efficiently and return near optimal schedules. Crew tours are building blocks of our approach, and our approach is focused on exploring more feasible tours than other approaches. In particular, all elements of a crew tour are optimized during the preparation and tour generation procedures. Moreover, time windows of customer-requested flights are handled exactly, and generalized to time window and crew time window of duties and tours. Furthermore, time windows of tours are contained in the MIP formulation to ensure more feasible connections between tours. In the pricing subproblem, an efficient constrained shortest path algorithm is proposed, which is necessary for our model and also provides extensibility for incorporating more complex constraints in the future. Computational results of our model show very small optimality gaps and consistent improvements over the model used in practice. Moreover, restricted versions of our model that have fast running time are provided, thus very desired in the case that running time has more priority than solution quality. In order to understand the demand, data mining of demand data is presented and analyzed. Moreover, a recovery model is proposed to deal with unscheduled maintenance in practice, by reserving airplanes and crews in the model. Computational experiments show the advantage of the recovery model, in the case of simulated unscheduled maintenance and comparing to models without recovery considerations.","abstract_html":"A column generation based approach is proposed to solve scheduling problems for fractional airlines efficiently and return near optimal schedules. Crew tours are building blocks of our approach, and our approach is focused on exploring more feasible tours than other approaches. In particular, all elements of a crew tour are optimized during the preparation and tour generation procedures. Moreover, time windows of customer-requested flights are handled exactly, and generalized to time window and crew time window of duties and tours. Furthermore, time windows of tours are contained in the MIP formulation to ensure more feasible connections between tours. In the pricing subproblem, an efficient constrained shortest path algorithm is proposed, which is necessary for our model and also provides extensibility for incorporating more complex constraints in the future. Computational results of our model show very small optimality gaps and consistent improvements over the model used in practice. Moreover, restricted versions of our model that have fast running time are provided, thus very desired in the case that running time has more priority than solution quality. In order to understand the demand, data mining of demand data is presented and analyzed. Moreover, a recovery model is proposed to deal with unscheduled maintenance in practice, by reserving airplanes and crews in the model. Computational experiments show the advantage of the recovery model, in the case of simulated unscheduled maintenance and comparing to models without recovery considerations.","abstract_has_math":false,"creators":["Qian, Fei"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":["Ergun, Özlem","Johnson, Ellis L."],"committee_chairs":[],"committee_members":["Clarke, John-Paul","Keskinocak, Pinar","Sokol, Joel"],"year":2010,"date_issued":"2010-12-21","date_published":"2010-12-21","updated_at":"2026-11-19T06:10:11Z","subjects":["Column generation","Fractional airlines","Airline optimization","Fractional ownership program","Scheduling","Time management","Employees Workload"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/39641","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/39641","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F39641","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ergun, Özlem","Johnson, Ellis L."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Clarke, John-Paul","Keskinocak, Pinar","Sokol, Joel"]},{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["Qian, Fei"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-07-06T16:49:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-07-06T16:49:04Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-12-21"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["889e3658-7945-43ec-8c94-a0b8989407b1"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Column generation","Fractional airlines","Airline optimization","Fractional ownership program"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Scheduling","Time management","Employees Workload"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/39641"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A column generation based approach is proposed to solve scheduling problems for fractional airlines efficiently and return near optimal schedules. Crew tours are building blocks of our approach, and our approach is focused on exploring more feasible tours than other approaches. In particular, all elements of a crew tour are optimized during the preparation and tour generation procedures. Moreover, time windows of customer-requested flights are handled exactly, and generalized to time window and crew time window of duties and tours. Furthermore, time windows of tours are contained in the MIP formulation to ensure more feasible connections between tours. In the pricing subproblem, an efficient constrained shortest path algorithm is proposed, which is necessary for our model and also provides extensibility for incorporating more complex constraints in the future. Computational results of our model show very small optimality gaps and consistent improvements over the model used in practice. Moreover, restricted versions of our model that have fast running time are provided, thus very desired in the case that running time has more priority than solution quality. In order to understand the demand, data mining of demand data is presented and analyzed. Moreover, a recovery model is proposed to deal with unscheduled maintenance in practice, by reserving airplanes and crews in the model. Computational experiments show the advantage of the recovery model, in the case of simulated unscheduled maintenance and comparing to models without recovery considerations."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:title","label":"Title","values":["Scheduling problems for fractional airlines"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ergun, Özlem","Johnson, Ellis L."],"dc:contributor.committeemember":["Clarke, John-Paul","Keskinocak, Pinar","Sokol, Joel"],"dc:contributor.department":["Industrial and Systems Engineering"],"dc:contributor.other":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"],"dc:creator":["Qian, Fei"],"dc:date.accessioned":["2011-07-06T16:49:04Z"],"dc:date.available":["2011-07-06T16:49:04Z"],"dc:date.issued":["2010-12-21"],"dc:description.abstract":["A column generation based approach is proposed to solve scheduling problems for fractional airlines efficiently and return near optimal schedules. Crew tours are building blocks of our approach, and our approach is focused on exploring more feasible tours than other approaches. In particular, all elements of a crew tour are optimized during the preparation and tour generation procedures. Moreover, time windows of customer-requested flights are handled exactly, and generalized to time window and crew time window of duties and tours. Furthermore, time windows of tours are contained in the MIP formulation to ensure more feasible connections between tours. In the pricing subproblem, an efficient constrained shortest path algorithm is proposed, which is necessary for our model and also provides extensibility for incorporating more complex constraints in the future. Computational results of our model show very small optimality gaps and consistent improvements over the model used in practice. Moreover, restricted versions of our model that have fast running time are provided, thus very desired in the case that running time has more priority than solution quality. In order to understand the demand, data mining of demand data is presented and analyzed. Moreover, a recovery model is proposed to deal with unscheduled maintenance in practice, by reserving airplanes and crews in the model. Computational experiments show the advantage of the recovery model, in the case of simulated unscheduled maintenance and comparing to models without recovery considerations."],"dc:description.degree":["Ph.D."],"dc:identifier.uri":["http://hdl.handle.net/1853/39641"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["889e3658-7945-43ec-8c94-a0b8989407b1"],"dc:relation.orgunit":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"],"dc:subject":["Column generation","Fractional airlines","Airline optimization","Fractional ownership program"],"dc:subject.lcsh":["Scheduling","Time management","Employees Workload"],"dc:title":["Scheduling problems for fractional airlines"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T06:10:11Z"}